ML20055D229
| ML20055D229 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/22/1990 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-90-061, CON-NRC-90-61 VPNPD-90-304, NUDOCS 9007050197 | |
| Download: ML20055D229 (1) | |
Text
i
,f r.
s
. Wisconsin x
Electnc
. POWER COMPANY 231 w MicNoort Po. Box 2046. Milwoukee. wi 53201 (414)221-2345-I
.VPNPD-90' ' 30 4 4
' June 22, 1990 U.S. Nuclear Regulatory Commission Document Control Desk
- Mail Stop Pl-137 Washington,"DC 20555 Gentlemen:
CHANGE IN PLANT MANAGER POINT BEACH NUCLEAR PLANT This is:to inform you that we have promoted Mr. Gregory J.
Maxfield:to Manager of the Point Beach-Nuclear Plant effective
. July 1,:1990.
Mr. Maxfield is highly qualified for the position.
,Since starting as a Technical Assistant-Operations at the Point t
Beach ^ Nuclear Plant in 1979, he has held the positions of Nuclear Plant Engineer, Assistant Superintendent-Operations, Training Engineer, Superintendent-Operations, and Superintendent-Engineering Quality and Regulatory Services.
Most recently he has H
held:the position of General Superintendent-Operations, where he was responsible for the operating groups at Point Beach including k
Health. Physics, Chemistry, Operations and Regulatory Services.
He presently holds a Senior Reactor Operator's license on the Point Beach units.
u Mr. James J.
Zach the present manager.has been promoted to Senior Manager of Nuclear Engineering in our corporate offices.
We~believe these appointments will enhance our operation and engineering support of the Point Beach Nuclear Plant.
Very.truly yours, 4
kg
~
C.
W.. Fay-Vice: President Nuclear Power
-TGM/ dad Copies to:
NRC. Regional Administrator, Region III
..,,'g NRC Resident-Inspector
.9007050197 900622 p[
N PDR ADOCK 05000266 H
/
dwbsWhn afIlinvmbilhew(brpw/km
.t,