Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed
ML20198P760
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/12/1998
From: Hammer M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198P761 List:
References
NUDOCS 9801220237
Download: ML20198P760 (1)


LER-2097-014, Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed
Event date:
Report date:
2632097014R00 - NRC Website

text

e O

Northern States Power Company Monticeno Nuclear Genersting Pant 2807 West Hwy 76 Mantceho,Mnremota $5362-9637 January 12,1998 10 CFR Part 50 Section 50.73 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MCNTICCLLO NUCLEAR GENERATING PLANT Docket No. 50 263 License No. DPR 22 LER 97 014 Division ll ADS Inhibit Switch Was Not Tested as Required by Technical Specifications The Licensee Event Report for this occurrence is attached. This report contains the following new NRC commitment:

A surveillance procedure will be revised or wntten to verify operability of the Division II ADS Inhibit Switch.

Please contact Tom Parker at (612) 295-1014 if you require further information.

MM41W Michael F Hammer Plant Manager Monticello Nuclear Generating Plant c: Regional Administrator Ill NRC Sr Resident inspector, NRC NRR Project Manager, NRC l State of Minnesota, Attn: Kris Sanda Attachment

(( )}