05000263/LER-1997-011, Forwards LER 97-011-00 Re Error in Procedure Causes Failure to Transfer HPCI & RCIC Suctions to Suppression Pool.Rept Contains Four New NRC Commitments

From kanterella
Jump to navigation Jump to search
Forwards LER 97-011-00 Re Error in Procedure Causes Failure to Transfer HPCI & RCIC Suctions to Suppression Pool.Rept Contains Four New NRC Commitments
ML20212A639
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/16/1997
From: Hammer M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212A645 List:
References
NUDOCS 9710240106
Download: ML20212A639 (1)


LER-2097-011, Forwards LER 97-011-00 Re Error in Procedure Causes Failure to Transfer HPCI & RCIC Suctions to Suppression Pool.Rept Contains Four New NRC Commitments
Event date:
Report date:
2632097011R00 - NRC Website

text

'

N',rtt an States Power Company Monucello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362 9637 October 16,1997 10 CFR Part 50 Sealon 50.73 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 Licenso No. DPR 22 LER 97-011 Erro in Proceduro Causes Failure to Transfer the HPCI and RCIC Suctions to the Supprousion Pool After Making a Condensato Storago Tank Lovel Instrument inoperable The Licensoo Event Report for this occurrence is attached. This report contains four now NRC commitments:

A permanent change will be made to Operations Manual B.8.9-05.G.5.

t All procedures involving the Condensate Storage Tanks will be reviewed to identify any similar errors associated with the implementation of t.icense Amendment #37.

The process for implementing Technical Specification changes will be reviewed for possible improvements which might prevent similar future errors.

Quality Services will review a sample of implementation of past Technical Specification changes issued between 1986 and 1993 to ensure that no programmatic problems exist.

l Please contact Tom Parker at (012) 2951014 if you require further information.

I k [M4444O Michael F Hammer Plant Manager Monticello Nuclear Generating Plant ) )

l c: Regional Administrator-Ill NRC 4 i Sr Resident inspector, NRC l

NRR Project Manager, NRC -

.M h State of Minnesota, Attn: Kris Sanda Attachment 9710240106 971016 fkkhhg, PDR ADOCK 05000263 lhk/

8 PDR