Informs That Operator Licensing Exams Scheduled for Week of 970421 & Requests That Preliminary & Senior Reactor Operator License Applications & Waivers Be Received 30 Days Before First Exam Date
ML20133L680
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/10/1997
From: Lennartz J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
References
NUDOCS 9701220103
Download: ML20133L680 (3)


Text

. - -

l l January 10, 1997 l

l Mr. W. T. Subalusky, Jr.

Site Vice President LaSalle County Station

Commonwealth Edison Company 2601 North 21st Road Marseilles, IL 61341 i

I

Dear Mr. Subalusky:

i in a telephone conversation between Mr. Jay Lennartz, and Mr. William Richardson, revised arrangements were made for the administration of licensing examinations at the LaSalle Nuclear Power Station. This letter conveys the new arrangements for the NRC to prepare the examination.

The written and operating examinations are still scheduled for the week of April 21,1997.

Your staff will be given an opportunity to review the licensing examinations in accordance I with the guidelines in Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards," (ES-201, Attachment 4) during the week of April 7,1997.

To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by January 21,1997. Any delay in receiving approved and indexed reference material or the j submittal of inadequate or incomplete reference material may result in the examinations being rescheduled.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021. In crder to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above.

Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

9701220103 970110 PDR ADOCK 05000373 V PDR

I W. T. Subalusky 2 January 10, 1997

Your staff should submit preliminary reactor operator and senior reactor operator license i applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30,1997. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.

Thank you for your consideration in this matter. Mr. Richardson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and requirements, please contact Dell McNeil at (630) 829-9737.

Sincerely,

/s/ J. A. Lennartz Jay A. Lennartz, Acting Chief Operator Licensing Branch Docket No. 50-373 Docket No. 50-374 Distribution:

See attached list DOCUMENT NAME: G:\DRS\LAS01097.DRS To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enci "E" = Copy w/ attach /enci "N" = No copy 0FFICE RIII:DRS l 10 RIII:DRS , l rd l l NAME Plettner/kjo~aP Lennartz S DATE 01/ o q /97 01/ /0 /97 0FFICIAL RECORD COPY

  • I
W. T. Subalusky 3 January 10, 1997 i

i i cc: T. J. Maiman, Senior Vice President,

Nuclear Operations Division

, D. A. Sager, Vice President,

! Generation Support 3

H. W. Keiser, Chief Nuclear i Operating Officer i D. J. Ray, Station Manager J. Burns, Regulatory Assurance Supervisor

1. Johnson, Acting Nuclear Regulatory Services Manager J. W. Davis, Training Manager
Document Control Desk - Licensing
Richard Hubbard

, Nathan Schloss, Economist, i

Office of the Attorney General '

State Liaison Officer i Chairman, Illinois Commerce Commission 4

j Distribution:

Docket File Rill PRR W. L. Axelson, Rill l gPUSUC'lE142? ! SRis, LaSalle R. A. Capra, NRR

! OC/LFDCB D. Skay, NRR Enf. Coordirtator, Rlll

M. Dapas, DRP A. B. Beach, Rlli
DRS S. A. Richards, HOLB/NRR 1

l i

I a

, l 1

170001 0  !

\