ML20092K413

From kanterella
Jump to navigation Jump to search
Forwards Cycle 10 Startup Rept,June 1984
ML20092K413
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/21/1984
From: Giesler C
WISCONSIN PUBLIC SERVICE CORP.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML20092K417 List:
References
CON-NRC-84-108 NUDOCS 8406280351
Download: ML20092K413 (1)


Text

l'

  • 1 1

NRC-84-108 WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, G'een Bay, Wisconsin 54305 t

l l

l June 21, 1984 Director of Nuclear Reactor Regulation Attention: Mr. S. A. Varga, Chief I Operating Reactors Branch No. 1 Division of Licensing

U.S. Nuclear Regulatory Commission l Washington, D.C. 20555 Dear Mr. Vargas Docket 50-305 l Operating License DPR-43 i

Kewaunee Nuclear Power Plant Cycle X Startup Report In accordance with our practice of reporting the results of phy-sics tests, we hereby submit 40 copies of the Kewaunee Nuclear Plant Cycle X Startup Report.

Very truly yours, k

Carl W. Giesler Vice President - Power Production CAS/js Enc.

l cc - Mr. Robert Nelson, US NRC US NRC, c/o Document Management Branch l

1 Washington, D.C. 20555 i

G l

b 84C6280351 040621 PDR ADOCK 05000305 p PDR g

-