Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML111650668 | 17 August 1990 | Forwards Pages Inadvertently Deleted from 1990 Rev to Updated FSAR Submitted on 900720 | |
ML20055C981 | 29 June 1990 | Forwards Response to Violations Noted in Insp Rept 50-305/90-04.Response Withheld (Ref 10CFR73.21) | |
ML111660967 | 6 April 1990 | Forwards Nonproprietary WCAP-12559 & Proprietary WCAP-12558, Kewaunees Steam Generator Tubesheet Crevice Indications Return to Power Rept, as Followup to 900328 Meeting. Proprietary Version Withheld (Ref 10CFR2.790) | |
ML20012A403 | 1 March 1990 | Informs That Revised Listed Drawings Sent to Region III for Filing | |
ML20006E864 | 19 February 1990 | Suppl Response to NRC 890725 Ltr Re Safeguards Info Violation Noted in Insp Rept 50-305/89-09.Corrective Action: Section V of General Employee Training Manual Security Removed | |
ML111660934 | 15 January 1990 | Forwards Nonproprietary WCAP-12441 & Proprietary WCAP-12440, Presentation to NRC Re Kewaunee (Wps) SECY-83-472 LOCA Analysis Effort. Wiesemann 891204 Request for Withholding Also Encl.Proprietary Rept Withheld (Ref 10CFR2.790) | |
ML20005D960 | 27 December 1989 | Forwards Response to Allegation RIII-A-89-A-0137.Encl Withheld (Ref 10CFR73.21) | |
ML20005D813 | 22 December 1989 | Forwards Status & Proposed Schedule for Security Mod Completion.Implementation Schedule for Proposed Mods Extended Until Oct 1990 Due to Several Major Project Increases.Encl Withheld (Ref 10CFR73.21) | |
ML20011D911 | 20 December 1989 | Forwards Executed Amend 8 to Indemnity Agreement B-53 | |
ML19332E609 | 4 December 1989 | Forwards Rev 1 to Security Manual.Rev Withheld (Ref 10CFR73.21) | |
ML20246G376 | 11 May 1989 | Forwards Proposed Change to Devitalize Area of Plant (Currently Identified as Vital Area),Per 10CFR50.90.Change Withheld | |
ML20205K396 | 28 October 1988 | Forwards Response to NRC Re security-related Violations Noted in Insp Rept 50-305/88-17.Response Withheld | |
ML20151Q415 | 1 August 1988 | Advises That Revised Listed P&ID Drawings Being Sent to Region III | |
ML20196L514 | 30 June 1988 | Forwards Rev 15 to Industrial Security Manual.Rev Withheld (Ref 10CFR73.21) | |
ML20155A627 | 8 June 1988 | Forwards Response to Security Open Item Noted in Insp Rept 50-305/88-04.Encl Withheld (Ref 10CFR73.21) | |
ML20151N341 | 22 April 1988 | Forwards Response to NRC Re Violations Noted in Insp Rept 50-305/88-05.Response Withheld (Ref 10CFR73.21) | |
ML20148E218 | 22 March 1988 | Forwards Proposed Amend 10a to Industrial Security Manual Re Implementation of 10CFR73.55 Rule Changes.Amend Withheld | |
ML20147G054 | 1 March 1988 | Advises That Listed P&Ids Being Sent to Region III Incident Response Ctr Ref Library,Per Jg Keppler 800320 Request | |
ML20236S067 | 17 November 1987 | Forwards Rev 14 to Industrial Security Manual & Rev 7 to Security Force Training & Qualifications Manual,Per Provisions of 10CFR50.54(p).Encls Withheld (Ref 10CFR73.21) | |
ML20236A239 | 19 October 1987 | Forwards Proprietary Rev 1 to App C of Plant Industrial Security Manual.App C Describes Temporary Security Measures Employed During Const Associated W/Expansion of Security Bldg.Manual Withheld (Ref 10CFR73.21) | |
ML20234E440 | 18 September 1987 | Forwards App B,Rev 1 to Industrial Security Manual.App B Describes Temporary Security Measures Employed During Const of Administration & Training Facility.App B Will Be in Effect Until End of Dec 1987.Encl Withheld (Ref 10CFR73.21) | |
ML20214U038 | 5 June 1987 | Forwards Table Listing Valves Meeting Revised Definition of Pressure Isolation Valve,Per Generic Ltr 87-06 Request.Table Includes Periodic Leakage,Operational Tests & Frequency of Testing | |
ML20213G713 | 12 May 1987 | Forwards App C to Plant Industrial Security Manual, Describing Temporary Security Measures Employed During Const Associated W/Expansion of Existing Security Bldg.App Withheld (Ref 10CFR73.21) | |
ML20215K285 | 6 May 1987 | Forwards App B to Plant Industrial Security Manual,Effective Until End of 1987 or Early 1988 When Const Nears Completion. Manual Withheld (Ref 10CFR73.21) | |
ML20210B438 | 1 May 1987 | Forwards Response to Violations Noted in Insp Rept 50-305/87-11.Response to One Open Item & One Weakness Also Provided.Encl Withheld (Ref 10CFR73.21) | |
ML20212N721 | 9 March 1987 | Responds to Concerns Noted in Insp Rept 50-305/86-09. Operations Dept Initiated multi-faceted Program Aimed at Improving Operator Attentiveness.Control Room Operators Reminded to Walk Boards at Regular Intervals | |
ML20209H095 | 30 January 1987 | Forwards Resolution Schedule Re Two Items Identified in Regulatory Effectiveness Review Rept,Per 861218 Telcon. Resolutions Contingent Upon Review & Approval by Util.Encl Withheld (Ref 10CFR73.21) | |
ML20212B857 | 26 December 1986 | Forwards Reload Safety Evaluation,Kewaunee Cycle 13. Cycle 13 Design More Conservative than Design Used in Accident Analysis.Refueling Outage Scheduled to Begin 870301.Cycle 13 Startup Testing Scheduled to Begin 870410 | |
ML20212A513 | 17 December 1986 | Resubmits Re Proposed Implementation of 10CFR73.55 Rule Changes to Document Control Desk,Per Project Manager Request | |
ML20212B547 | 2 December 1986 | Forwards Descriptive Summary of Proposed Changes to Facility Industrial Security Manual Per 10CFR73.55(a),(d)(1),(d)(7), (d)(9) & (e)(1).Encl Withheld (Ref 10CFR73.21) | |
ML20212A527 | 2 December 1986 | Forwards Descriptive Summary of Proposed Changes to Security manual,per10CFR73.55 Requirements That Licensees Submit Revs Describing How Paragraphs (a),(d)(1),(d)(7),(d)(9) & (e)(1) Will Be Met.Encl Withheld (Ref 10CFR73.55) | |
ML20211K013 | 11 November 1986 | Forwards Response to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. ECCS at Plant Not Vulnerable to Single Failure in Pump Lines | |
ML20215N425 | 27 October 1986 | Forwards Rev 9 to Industrial Security Manual & Rev 6 to Security Force Training & Qualifications Manual,Per 10CFR50.54(p).Revs Withheld (Ref 10CFR73.21) | |
ML20210C353 | 8 September 1986 | Updates 860514 Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Full Flow Max Differential Pressure Tests for Valves Will Be Performed | |
ML20210B595 | 5 September 1986 | Forwards Addl Info to 850411 Response to NRC Re Results of Regulatory Effectiveness Review on 840611-15. Protection of Vital Equipment Addressed in Encl.W/O Encl | |
ML20206R466 | 30 July 1986 | Forwards List of Exercise Objectives & Abstract of Scenario for 861014 Emergency Exercise.State of Wi & Kewaunee & Manitowoc Counties Will Support Exercise,Answering Notification Messages W/O Personnel Response.W/O Encl | |
ML20212H569 | 28 July 1986 | Responds to IE Bulletin 86-002 Re Static O-Ring Differential Pressure Switches.Review Indicated That Sor,Inc Series 102 or 103 Differential Pressure Switches Not Installed in Electrical Equipment Applications | |
05000305/LER-1986-009, Forwards LER 86-009-00.Delay in Submitting Rept 2 Days Beyond 10CFR50.73 Requirement Necessary to Include Results of Special Test Procedure Performed as Final Corrective Action for Event.Delay Concurred W/By NRC Project Manager | 16 June 1986 | Forwards LER 86-009-00.Delay in Submitting Rept 2 Days Beyond 10CFR50.73 Requirement Necessary to Include Results of Special Test Procedure Performed as Final Corrective Action for Event.Delay Concurred W/By NRC Project Manager | |
ML20211G036 | 13 June 1986 | Forwards Rev 8 to Industrial Security Manual,Addressing NRC Concern in Insp Rept 50-305/85-18 & Updating Titles of Plant Staff W/Security Responsibilities.Rev Withheld (Ref 10CFR73.21) | |
ML20155J308 | 14 May 1986 | Responds to IE Bulletin 85-003, Motor-Operated Valve Common Failures During Plant Transients Due to Improper Switch Setting. Westinghouse Owners Group Developed Methodology for Determining Which motor-operated Valves Included | Boric Acid |
ML20204A516 | 6 May 1986 | Requests Reconsideration of 860430 Denial of Schrock 860418 Application for Senior Reactor Operator Exam.Rationale Supporting Request Submitted | |
ML20203F039 | 2 April 1986 | Discusses AEOD Assessment of Util Lers.Quality of Future LERs Will Be Improved by Using Outline Format During Text Preparation & Guidelines from Suppl 2 to NUREG-1022 | |
ML20154L613 | 7 March 1986 | Forwards Proposed Rev to Industrial Security Manual,In Effort to Resolve Violation Cited in Insp Rept 50-305/85-18. Rev Withheld (Ref 10CFR73.21).Fee Paid | |
ML20154J547 | 28 February 1986 | Forwards Annual Operating Rept,1985 | Safe Shutdown Boric Acid High Radiation Area Grab sample Hydrostatic Fuel cladding Fire Protection Program |
ML20154B283 | 25 February 1986 | Forwards Procedure for Prevention & Correction of Steam Binding of Auxiliary Feedwater Pumps in Response to IE Bulletin 85-001 | |
ML20137Y024 | 18 February 1986 | Expresses Concern Re FEMA Guidance Memo PR-1, Policy on NUREG-0654/FEMA-REP-1 & 44CFR350 Periodic Requirements. Apparent Conflicts Noted Between PR-1 & 10CFR50,App E, Section E.3(3) & 44CFR350.9(c)(4).PR-1 Should Be Reviewed | |
ML20199F071 | 28 January 1986 | FOIA Request for Draft NUREG/CR-4178 | |
ML20137X042 | 27 November 1985 | Requests Extension for Completing NUREG-0737,Suppl 1 Requirements,Per 840614 Order Confirming Util Commitments. Description of NUREG-0737,Suppl 1 Items Under 840614 Order & Reasons for Relief Provided | |
ML20132D612 | 13 September 1985 | Responds to NRC Re Violations Noted in Insp Rept 50-305/85-09.Corrective Actions:Engineering Control Directive 14.1 Revised to Ensure Adequacy of Emergency Preparedess Program Interfaces W/State & Local Govts | |
ML20134D423 | 1 August 1985 | Updates 850201 Response to Weaknesses 2 & 3 Identified in Insp Rept 50-305/84-14 Re Dose Projection Program Flow Rates.Results of Auxiliary Bldg & Reactor Bldg Ventilation Sys Evaluation & Recommended Corrective Actions Provided |