Responds to NRC Re Violations Noted in Insp Rept 50-305/85-09.Corrective Actions:Engineering Control Directive 14.1 Revised to Ensure Adequacy of Emergency Preparedess Program Interfaces W/State & Local Govts
ML20132D612
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 09/13/1985
From: Hintz D
WISCONSIN PUBLIC SERVICE CORP.
To: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CON-NRC-85-150 NUDOCS 8509300232
Download: ML20132D612 (2)


Text

N.

7t, NRC-85-150 WISCONSIN PUBLIC SERVICE CORPORATION

_ P.O. Box 19002, Green Bay, WI 54307-9002 September 13, 1985 Mr. W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branph U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Inspection Report 85-009

Reference:

Letter from W. D. Shafer (NRC) to D. C. Hintz (WPSC) dated August 16, 1985, transmitting Inspection Report 50-305/85-009 The attachment to this letter details our response to the Notice of Violation identified in inspection report 50-305/85-009 (DRSS).

Very truly yours,

$ Q D. C. Hintz Manager - Nuclear Power DSN/js Attach, cc - Mr. S. A. Varga, US NRC Mr. Robert Nelson, US NRC 3f g

~

8509300232 850913 PDR ADOCK 05000305 G PDR

'SEP 161985

, k.'

, .n_ NRC10-8.2 Attachment Response to Notice of Violation

. Inspection Report 85-009 Notice of Violation As a result.of the inspection conducted on July 29 through Augu t 2, 1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions, (10 CFR Part 2, Appendix C), the following violation was identified:

10 CFR Part 50.54(t) states in part that, "the licensee shall provide for a review of its emergency preparedness program at least every 12 months... The review shall include an evaluation for adequacy of interfaces with state and local governments... The results of the review, along with' recommendations for improvements, shall be documented...."

Contrary to the above, the licensee's only review of their emergency prepared-ness program conducted in the last 12 months failed to evaluate and document the adequacy of interfaces with state and local governments.

This is a Severity Level V violation (Supplement VIII).

WPSC Response Engineering Control Directive (ECD) 14.1 entitled "IndependentsTechnical Review" will be revised to ensure that the annual Technical Review of the Kewaunee Nuclear Power Plant (KNPP) emergency preparedness program will include an evaluation for adequacy of interfaces with state and local governments. The results of the review, along with any recommendations for improvement will be documented in the technical review report.

This directive will be revised prior to the 1985 KNPP emergency planning exercise scheduled for October 22, 1985.