Discusses Insp Repts 50-206/85-30,50-361/85-29 & 50-362/85-28 on 850923-27 & Forwards Notice of Violation
ML20205M661
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/02/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20205M665 List:
References
NUDOCS 8604150341
Download: ML20205M661 (6)


Text

- A L

%e f

.

,,

.. o

.

APR 2 1986 Docket Nos. 50-206 50-361 50-362 Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California Attention: Mr. Kenneth P. Baskin, Vice President Nuclear Engineering, Safety and Licensing Department Gentlemen:

Subject: NRC Enforcement Actions Related to Inspection Nos. 50-206/85-30; 50-361/85-29; and 50-362/85-28 A team inspection was conducted by Mr. R. C. Wilson and other NRC representatives on September 23-27, 1985, at the San Onofre Nuclear Generating Station of activities authorized by NRC License Nos. DPR-13, NPF-10 and NPF-15. The team's findings were discussed with you and members of your staff at the conclusion of the inspection and documented in Inspection Report Nos. 50-206/85-30, 50-361/85-29, and 50-362/85-2 The inspection included reviews of your implementation of a program required by 10 CFR 50.49 for establishing and maintaining.the qualification of electric equipment within the scope of 10 CFR 50.49. 'The inspection aise included evaluation of your actions concerning EQ-related operating license conditions for Units 2 and Based on the results of the inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix Your response to this Notice is to be submitted in accordance with the provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violatio ,

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC Public Document Roo Should you have any questions concerning this Notice, we will be glad to discuss them with yo PDR G

ADOCK 05000206 PDR h

.

'

.e '

,,-. J

-

, ,

APR'2 1986 SouthernCaliforniaEdisonCompany.' 2

. i . ~,

The responses-directed by this letter and.'the accom'panying Notice are not subject to the clearance procedures of the': Office of Management and Budget'-

~

as required by the Paperwork Reduction Act of 1980, PL 96-51 ;

Sincerely,

.

'

,

'

~ >

, ,-

Fa D. F. Kirsch, Director Division of Reactor Safety and Projects l

Enclosure:

,

A. Notice of Violation

REGION V S & 1450 MARlA LANE,SulTE 210 U WALNUT CREEK, CAllFORNI A 94596

%.'....o -

APR 2 19 i6 Docket Nos. 50-206 50-361 50-362 Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California Attention: Mr. Kenneth P. Baskin, Vice President Nuclear Engineering, Safety and Licensing Department Gentlemen:

Subject: NRC Enforcement Actions Related to Inspection Nos. 50-206/85-30; 50-361/85-29; and 50-362/85-28 A team inspection was conducted by Mr. R. C. Wilson and other NRC representatives on September 23-27, 1985, at the San Onofre Nuclear Generating Station of activities authorized by NRC License Nos. DPR-13, NPF-10 and NPF-15. The team's findings were discussed with you and members of your staff at the conclusion of the inspection and documented in Inspection Report Nos. 50-206/85-30, 50-361/85-29, and 50-362/85-2 The inspection included reviews of your implementation of a program required by 10 CFR 50.49 for establishing and maintaining the qualification of electric equipment within the scope of 10 CFR 50.49. The inspection also included evaluation of your actions concerning EQ-related operating license conditions for Units 2 and Based on the results of the inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix Your response to this Notice is to be submitted in accordance with the provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violatio In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC Public Document Roo Should you have any questions concerning this Notice, we will be glad to discuss them with yo _ - - _ - _ _ _ _ _ _ _ _ _ _ _ . _ _ - _ _ _ - -. _ _ _ _ - - - - - . _ _ - _ _ _ _ _ _ __- _ --___-___ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - - _ _ _ _

_ _ ._ __

..

.

.

., ,

-

,

.

APR 2 1986 Southern California Edison Company 2

- -

r-The responses directed by this letter and the accompanying Notice are not

.; subject to the clearance procedures of the Office of Management and Budget .

as required by the Paperwork Reduction Act of 1980, PL 96-51

Sincerely, hb .f

' 'b k D. F. Kirsch, Director Division of Reactor Safety and Projects

Enclosure:

A. Notice of Violation

REGION V

  • s

%# ,d g 1450 MARIA LANE. SUITE 210 WALNUT CREEK, CALIFoRNI A 94596

..... -

'

APR 2 198s Docket Nos. 50-206 50-361 50-362 Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California Attention: Mr. Kenneth P. Baskin, Vice President Nuclear Engineering, Safety and Licensing Department Gentlemen:

Subject: NRC Enforcement Actions Related to Inspection Nos. 50-206/85-30; 50-361/85-29; and 50-362/85-28 A team inspection was conducted by Mr. R. C. Wilson and other NRC representatives on September 23-27, 1985, at the San Onofre Nuclear Generating Station of activities authorized by NRC License Nos. DPR-13, NPF-10 and NPF-15. The team's findings were discussed with you and members of your staff at the conclusion of the inspection and documented in Inspection Report Nos. 50-206/85-30, 50-361/85-29, and 50-362/85-2 The inspection included reviews of your implementation of a program required by 10 CFR 50.49 for establishing and maintaining the qualification of electric equipment within the scope of 10 CFR 50./9. The inspection also included evaluation of your actions concerning EQ-related operating license conditions for Units 2 and Based on the results of the inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix Your response to this Notice is to be submitted in accordance with the provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violatio In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC Public Document Roo Should you have any questions concerning this Notice, we will be glad to discuss them with yo '

s'

.

.

., .>

,

,

APR 2 1986 Southern California Edison Company 2

'

-

The responses directed by this letter and the accompanying Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-51

Sincerely, h '

k D. F. Kirsch, Director Division of Reactor Safety and Projects Enclosure:

! A. Notice of Violation

'

i cc w/ enclosure:

i D. J. Fogarty, Executive Vice President, Nuclear Engineering & Operations H. B. Ray, Vice President and Site Manager (San Clemente)

H. E. Morgan, Station Manager (San Clemente)

State of CA (Gordon K. Van Vleck)