Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000259/202301011 December 2023Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010Commercial Grade Dedication
IR 05000259/202300313 November 2023Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003Safe Shutdown
High Radiation Area
Stroke time
Enforcement Discretion
Coatings
Temporary Modification
Functionality Assessment
FLEX
Corrosion bonding
Significance Determination Process
Operability Determination
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
Fire Protection Program
Fire Watch
Hourly Fire Watch
Substantial potential for overexposure
Flow Induced Vibration
Power Uprate
Overexposure
IR 05000259/20230402 November 2023Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment LetterCondition Adverse to Quality
IR 05000259/202300529 August 2023Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005Commercial Grade Dedication
Cyber Security
Aging Management
License Renewal
IR 05000259/202300210 August 2023Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001Enforcement Discretion
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
Operability Assessment
IR 05000259/202330118 July 2023NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301
IR 05000259/202340212 June 2023Material Control and Accounting Program Inspection Report 05000259 2023402, 05000260 2023402 and 05000296 2023402Affidavit
IR 05000259/20230918 May 2023Final Significance Determination of a White Finding and Nov and Assessment Followup Letter; NRC Inspection Report 05000259/2023091Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
IR 05000259/20230013 May 2023Integrated Inspection Report 05000259/2023001, 05000260/2023001 and 05000296/2023001High winds
High Radiation Area
Stroke time
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Corrosion bonding
Annual Radioactive Effluent Release Report
Operability Determination
Pressure Boundary Leakage
Fire Protection Program
IR 05000259/202344023 March 2023Special Inspection Supplemental Report 05000259 2023440 and 05000260 2023440 and 05000296 2023440 Cover LetterAffidavit
IR 05000259/20234018 March 2023Security Baseline Inspection Report 05000259 2023401 and 05000260/2023401 and 05000296/2023401Fitness for Duty
Fatigue Rule
IR 05000259/20230902 March 2023NRC Inspection Report 05000259/2023090 and 05000260 2023090 and Preliminary White Finding and Apparent ViolationHigh winds
Internal Flooding
Past operability
Condition Adverse to Quality
FLEX
Significance Determination Process
Large early release frequency
Preliminary White Finding
IR 05000259/20220061 March 2023Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022006, 05000260/2022006 and 05000296/2022006Commercial Grade Dedication
Cyber Security
Exemption Request
Coronavirus
IR 05000259/20220047 February 2023Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004Reactor Vessel Water Level
Packing leak
Non-Destructive Examination
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
FLEX
Aging Management
Operability Determination
Severe Accident Management Guideline
Moisture barrier
License Renewal
Fire Protection Program
Power change
IR 05000259/20220039 November 2022Browns Perry Nuclear Plant - Integrated Inspection Report 05000259/2022003, 05000260/2022003 and 05000296/2022003Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Job Performance Measure
Operability Determination
Fire Protection Program
Downpower
Coast down
IR 05000259/202201220 September 2022Biennial Problem Identification and Resolution Inspection Report 05000259 2022012, 05000260 2022012 and 05000296 2022012Half scram
Past operability
Enforcement Discretion
Temporary Modification
Significance Determination Process
Operability Determination
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
IR 05000259/202201116 September 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000259/2022011 and 05000260/2022011 and 05000296/2022011Stroke time
Squib
Condition Adverse to Quality
Significance Determination Process
Scram Discharge Volume
Operability Determination
Power-Operated Valves
Coast down
Weak link
IR 05000259/20224026 September 2022Security Baseline Inspection Report 05000259/2022402 and 05000260/2022402 and 05000296/2022402 Cover LetterAffidavit
IR 05000259/202200530 August 2022Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022005, 05000260/2022005 and 05000296/2022005Fitness for Duty
Commercial Grade Dedication
License Renewal
Exemption Request
COVID-19
IR 05000259/20220028 August 2022Integrated Inspection Report 05000259/2022002, 05000260/2022002 and 05000296/2022002Safe Shutdown
High winds
Commercial Grade Dedication
Internal Flooding
Enforcement Discretion
Functionality Assessment
Foreign Material Exclusion
Operability Determination
License Renewal
Fire Protection Program
IR 05000259/202242019 July 2022Security Baseline Inspection Report 05000259/2022420, 05000260/2022420 and 05000296/2022420Affidavit
ML22181A95629 June 2022Bf Report 2022-401 Base Public Cover LetterCyber Security
ML22173A16221 June 2022Replacement Steam Dryer Visual Inspection Results (U3R20)
IR 05000259/202200112 May 2022Integrated Inspection Report 05000259/2022001, 05000260/2022001, 05000296/2022001 and Exercise of Enforcement DiscretionHigh winds
High Radiation Area
Internal Flooding
Hydrostatic
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Operability Determination
Control of Heavy Loads
Liquid penetrant
Fire Protection Program
Downpower
Coast down
Unidentified leakage
IR 05000259/202201030 March 2022Triennial Fire Protection Inspection Report 05000259/2022010 and 05000260/2022010 and 05000296/2022010 and Apparent ViolationSafe Shutdown
Fire Barrier
Significance Determination Process
Time Critical Operator Action
Fire Protection Program
IR 05000259/20224018 March 2022Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000259/2022401; 05000260/2022401; 05000296/2022401Cyber Security
IR 05000259/20210062 March 2022Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 (Report No. 05000259/2021006, 05000260/2021006 and 05000296/2021006Fitness for Duty
Cyber Security
License Renewal
Exemption Request
Power-Operated Valves
COVID-19
IR 05000259/202100431 January 2022Integrated Inspection Report 05000259/2021004, 05000260/2021004 and 05000296/2021004Past operability
Enforcement Discretion
Coatings
Temporary Modification
Functionality Assessment
FLEX
Corrosion bonding
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
Downpower
IR 05000259/202140319 January 2022NRC Inspection Report 05000259/2021403, 05000260/2021403 and 05000296/2021403Fitness for Duty
IR 05000259/202140218 January 2022Brows Ferry Nuclear Plant - Security Baseline Inspection Report 05000259/2021402 and 05000260/2021402 and 05000296/2021402Cyber Security
IR 05000259/20210039 November 2021Integrated Inspection Report 05000259/2021003, 05000260/2021003, 05000296/2021003 and 07200052/2021001Safe Shutdown
Offsite Dose Calculation Manual
Stroke time
Internal Flooding
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Aging Management
Significance Determination Process
Operability Determination
Control of Heavy Loads
Coronavirus
COVID-19
Fire Protection Program
Downpower
Unidentified leakage
IR 05000259/202140131 August 2021Security Baseline Inspection Report 05000259/2021401 and 05000260/2021401 and 05000296/2021401
IR 05000259/202101124 August 2021Temporary Instruction 2515/TI-193 Inspection Report 05000259/2021011, 05000260/2021011, and 05000296/2021011FLEX
Significance Determination Process
Operability Determination
Time Critical Operator Action
Coronavirus
COVID-19
IR 05000259/202100523 August 2021Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2, and 3- Report Nos. 05000259/2021005, 05000260/2021005 and 5000296/2021005Cyber Security
License Renewal
Exemption Request
COVID-19
ML21217A2835 August 2021Resident Integrated Inspection Report 2021-002High Radiation Area
Commercial Grade Dedication
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Temporary Modification
Functionality Assessment
Missed surveillance
Corrosion bonding
Significance Determination Process
Annual Radioactive Effluent Release Report
Foreign Material Exclusion
Coronavirus
COVID-19
Fire Protection Program
Downpower
IR 05000259/202130128 July 2021NRC Operator License Examination Report Nos. 05000259/2021301, 05000260/2021301, 05000296/2021301
IR 05000259/202101026 July 2021Design Basis Assurance Inspection (Teams) Inspection Report 05000259/2021010 and 05000260/2021010 and 05000296/2021010Safe Shutdown
Large early release frequency
Operability Determination
Time Critical Operator Action
Coronavirus
COVID-19
IR 05000259/202040126 May 2021Security Baseline Inspection Report 05000259/2020401 and 05000260/2020401 and 05000296/2020401(U)Affidavit
IR 05000259/202100128 April 2021Integrated Inspection Report 05000259/2021001, 05000260/2021001 and 05000296/2021001High winds
Mission time
Enforcement Discretion
Coatings
Nondestructive Examination
Temporary Modification
Functionality Assessment
Corrosion bonding
Operability Determination
License Renewal
Coronavirus
COVID-19
Fire Protection Program
Downpower
Coast down
IR 05000259/20200063 March 2021Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020006, 05000260/2020006 and 05000296/2020006Enforcement Discretion
Exemption Request
Power-Operated Valves
COVID-19
IR 05000259/202000428 January 2021Integrated Inspection Report 05000259/2020004, 05000260/2020004, 05000296/2020004, 07200052/2020002 and Exercise of Enforcement DiscretionHigh Radiation Area
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
FLEX
Operability Determination
Control of Heavy Loads
Coronavirus
COVID-19
Biofouling
Fire Protection Program
Power change
Coast down
IR 05000259/20204028 January 2021Material Control and Accounting Program Inspection Report 05000259/2020402, 05000260/2020402 and 05000296/2020402Affidavit
IR 05000259/202000310 November 2020Integrated Inspection Report 05000259/2020003, 05000260/2020003 and 05000296/2020003Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Fuel cladding
Biofouling
Fire Protection Program
IR 05000254/20200039 November 2020Integrated Inspection Report 05000254/2020003; 05000265/2020003 and 07200053/2020001Safe Shutdown
Time of Discovery
Anticipated operational occurrence
Past operability
Enforcement Discretion
VT-2
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Control of Heavy Loads
Coronavirus
COVID-19
Through-Wall Leak
Fire Protection Program
Incremental Core Damage Probability Deficit
Downpower
IR 05000259/202001126 October 2020Biennial Problem Identification and Resolution Inspection Report 05000259/2020011, 05000260/2020011 and 05000296/2020011Operability Determination
Coronavirus
COVID-19
Fatigue Rule
IR 05000259/202040429 September 2020NRC Security Inspection Report 05000259/2020404 and 05000260/2020404 and 05000296/2020404 and Apparent Violation (U)Fitness for Duty
Inattentive
Affidavit
IR 05000259/202000518 August 2020Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020005, 05000260/2020005, and 05000296/2020005Cyber Security
Exemption Request
COVID-19
Inattentive
IR 05000259/20200026 August 2020Brown Ferry Nuclear Plant Integrated Inspection Report 05000259/2020002, 05000260/2020002, 05000296/2020002, and 07200052/2020001Temporary Modification
Functionality Assessment
Operability Determination
Control of Heavy Loads
Coronavirus
COVID-19
Fire Protection Program
Unidentified leakage
IR 05000259/202001019 June 2020Triennial Inspection of Evaluation of Changes, Test and Experiments Baseline Inspection Report 0500259/2020010 and 05000260/2020010 and 05000296/2020010Weak link
IR 05000259/20200017 May 2020Integrated Inspection Report 05000259/2020001, 05000260/2020001, and 05000296/2020001Unanalyzed Condition
High Radiation Area
Half scram
Past operability
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Coast down
IR 05000259/202040316 March 2020Final Significance Determination of Greater than Green Finding, Notice of Violation, and Assessment Followup Letter 05000259/2020403, 05000260/2020403 and 05000296/2020403
IR 05000259/202041010 March 2020Security Baseline Inspection Report 05000259/2020410 and 05000260/2020410 and 05000296/2020410Affidavit
IR 05000259/20190063 March 2020Annual Assessment Letter for Browns Ferry Nuclear Plant Units 1,2,and 3 - NRC Report 05000259/2019006, 05000260/2019006, and 05000296/2019006
IR 05000259/201901117 January 2020Follow Up for NRC Confirmatory Order EA-17-022 NRC Inspection Report 05000259/2019011, 05000260/2019011, and 05000296/2019011Significance Determination Process
IR 05000259/201949018 December 2019NRC Security Inspection Report 05000259/2019490, 05000260/2019490 and 05000296/2019490 Preliminary Greater-Than-Green FindingSignificance Determination Process
Affidavit
IR 05000259/201930130 October 2019Operator Licensing Written Examination Approval 05000259/2019301, 05000260/2019301 and 05000296/2019301
IR 05000259/201900329 October 2019Integrated Inspection Report 05000259/2019003, 05000260/2019003, and 05000296/2019003Unanalyzed Condition
Internal Flooding
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Functionality Assessment
Corrosion bonding
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Maintenance Rule Program
Fire Protection Program
Power Uprate
IR 05000259/201920127 August 2019NRC Inspection Report 05000259/2019201, 05000260/2019201, and 05000296/2019201. Cover Letter Only
IR 05000259/201900212 August 2019NRC Integrated Inspection Report 05000259/2019002, 05000260/2019002, 05000296/2019002 and 07200052/2019001
IR 05000259/20190017 May 2019NRC Integrated Inspection Report 05000259/2019001, 05000260/2019001 and 05000296/2019001
IR 05000259/201901012 April 2019NRC Triennial Fire Protection Inspection (Team) Report 05000259/2019010 and 05000260/2019010 and 05000296/2019010Safe Shutdown
Packing leak
Fire Barrier
Multiple Spurious Operation
Condition Adverse to Quality
FLEX
B.5.b
Fire Protection Program
Fire Watch
Hourly Fire Watch
IR 05000259/201941012 March 2019U.S. Nuclear Regulatory Commission Security Inspect Report 05000259/2019410, 05000260/2019410 and 05000296/2019410
IR 05000259/20180064 March 2019Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2018006, 05000260/2018006 and 05000328/2018006
IR 05000259/201800431 January 2019NRC Integrated Inspection Report 05000259/2018004, 05000260/2018004, and 05000296/2018004Mission time
Past operability
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Control of Heavy Loads
Liquid penetrant
Fire Protection Program
Downpower
Flow Induced Vibration
Power Uprate
IR 05000259/201841324 January 2019U.S. Nuclear Regulatory Commission Security Target Set Inspection Report 05000259/2018413, 05000260/2018413, and 05000296/2018413Affidavit
IR 05000259/201805023 January 2019NRC Special Inspection Report 05000259/2018050High Radiation Area
Locked High Radiation Area
Significance Determination Process
Deep Dose Equivalent
Substantial potential for overexposure
Overexposure
IR 05000259/201801114 January 2019Nuclear Regulatory Commission Team Inspection Report 05000259/2018011, 05000260/2018011, and 05000296/2018011FLEX
Fukushima Dai-Ichi
Operability Determination
Spent Fuel Pool Instrumentation
IR 05000259/201841114 November 2018Cyber Security Baseline Security Inspection Results 05000259/2018411, 05000260/2018411 and 05000296/2018411Cyber Security
IR 05000259/201800329 October 2018NRC Integrated Inspection Report 05000259/2018003, 05000260/2018003, and 05000296/2018003Hot Short
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Functionality Assessment
Corrosion bonding
Job Performance Measure
Operability Determination
Control of Heavy Loads
Fire Protection Program
Downpower
Power Uprate
ML18283B78810 October 2018List of Various Inspection Reports in 1975Safe Shutdown
Boric Acid
Fire Barrier
Coatings
Moisture barrier
Liquid penetrant
Coast down
IR 05000259/197601710 October 2018Responding to Letter of 8/5/1976, Referring to IE Inspection Reports for 50-259/76-17, 50-260/76-17, Letter Advising No Proprietary Information Is Contained
ML18283B61110 October 2018Responding to Letter of 8/5/1976, Referring to IE Inspection Reports for 50-259/76-17, 50-260/76-17, Letter Advising No Proprietary Information Is Contained
IR 05000259/20180123 October 2018NRC Problem Identification and Resolution Inspection Report 05000259/2018012,05000260/2018012 and 05000296/2018012Past operability
Enforcement Discretion
Condition Adverse to Quality
Significance Determination Process
Operability Determination
IR 05000259/201830124 August 2018NRC Operator License Examination Report Nos. 05000259/2018301, 05000260/2018301,05000296/2018301
IR 05000260/20180029 August 2018Nuclear Regulatory Commission Integrated Inspection Report 05000259/3018002, 05000260/2018002 and 05000296/2018002, and Apparent ViolationHot Short
Safe Shutdown
Unanalyzed Condition
Offsite Dose Calculation Manual
Past operability
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Earthquake
Fire Protection Program
Fire Watch
Downpower
Flow Induced Vibration
Siren
Power Uprate
IR 05000259/201801028 June 2018NRC Design Bases Assurance Inspection (Team) Report 05000259/2018010, 05000260/2018010, and 05000296/2018010Safe Shutdown
Stroke time
Enforcement Discretion
Anchor Darling
Incorporated by reference
Significance Determination Process
Large early release frequency
Fire Protection Program
IR 05000259/201841211 June 2018U.S. Nuclear Regulatory Commission Security Inspection Report 05000259/2018412, 05000260/2018412 and 05000296/2018412 (Public)Affidavit
IR 05000260/20160026 June 2018Withdrawal of Non-Cited Violation 05000260/2016002-03, Failure to Report a Condition That Could Have Prevented the Fulfillment of a Safety FunctionSafe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Time to boil
Internal Flooding
Hydrostatic
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Annual Radioactive Effluent Release Report
Operability Determination
Downpower
Siren
IR 05000259/20180018 May 2018NRC Integrated Inspection Report 05000259/2018001, 05000260/2018001 and 05000296/2018001High Radiation Area
Time to boil
Commercial Grade Dedication
Internal Flooding
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Aging Management
Significance Determination Process
Process Control Program
Operability Determination
Control of Heavy Loads
Liquid penetrant
Fatigue Rule
Through Wall Leak
Fire Protection Program
Fire Watch
Substantial potential for overexposure
Downpower
Weak link
Power Uprate
Overexposure
IR 05000259/201844020 February 2018U.S. Nuclear Regulatory Commission Inspection Procedure 95001 Supplemental Inspection Report 05000259/2018440, 05000260/2018440 and 05000296/2018440 and Closed Regulatory Performance MeetingAffidavit
IR 05000259/20170047 February 2018Brown Ferry - NRC Integrated Inspection Report 05000259/2017004, 05000260/2017004 and 05000296/2017004Safe Shutdown
Unanalyzed Condition
Fire Barrier
Stroke time
Enforcement Discretion
Functionality Assessment
Missed surveillance
Significance Determination Process
Operability Determination
Scaffolding
Downpower
Weak link
Power Uprate
IR 05000259/20184101 February 2018NRC Security Inspection Report 05000259/2018410, 05000260/2018410 and 05000296/2018410Affidavit
IR 05000259/201700716 January 2018Browns Perry Nuclear Plant - U. S. Nuclear Regulatory Commission Evaluation of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Report 05000259/2017007, 05000260/2017007 and 05000296/2017007
IR 05000260/201700829 November 2017NRC Special Inspection Report 05000260/2017008 and 05000296/2017008Time of Discovery
Safety Limit Minimum Critical Power Ratio
Stroke time
Commercial Grade Dedication
Past operability
Significance Determination Process
Operability Determination
Weak link
IR 05000259/201700331 October 2017NRC Integrated Inspection Report 05000259/2017003, 05000260/2017003, and 05000296/2017003Unanalyzed Condition
Time of Discovery
Ultimate heat sink
Fire Barrier
Tornado Missile
Internal Flooding
Enforcement Discretion
Significance Determination Process
Tornado Missile Protection
Operability Determination
Earthquake
Fire Watch
Downpower
Unidentified leakage
IR 05000259/201740718 October 2017Nuclear Regulatory Commission Material Control and Accounting Inspection Report 50-259/2017-407, 50-260/2017-407, and 50-296/2017-407 (Public)Affidavit
IR 05000259/20175021 August 2017U.S. Nuclear Regulatory Commission Emergency Preparedness Inspection Report 05000259/2017502, 05000260/2017502, and 05000296/2017502 - Public
IR 05000259/201700226 July 2017Brown Perry Nuclear Plant - NRC Integrated Inspection Report 05000259/260/296/2017002Safe Shutdown
Boric Acid
Fire Barrier
Internal Flooding
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Condition Adverse to Quality
Tornado Generated Missile
Fukushima Dai-Ichi
Significance Determination Process
Operability Determination
Control of Heavy Loads
Through-Wall Leak
Fire Protection Program
Downpower
ML17207A24426 July 2017Brown Perry Nuclear Plant - NRC Integrated Inspection Report 05000259/260/296/2017002Safe Shutdown
Boric Acid
Fire Barrier
Internal Flooding
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
Tornado Generated Missile
Fukushima Dai-Ichi
Significance Determination Process
Control of Heavy Loads
Through-Wall Leak
Fire Protection Program
Downpower
IR 05000259/201740425 July 2017U.S. Nuclear Regulatory Commission Security Inspection Report 05000259/2017404, 05000260/2017404 and 05000296/2017404 OUO RemovedAffidavit
IR 05000259/201730116 June 2017NRC Operator License Examination Report Nos. 05000259/2017301, 05000260/2017301, 05000296/2017301Safe Shutdown
Job Performance Measure
CNL-17-065, Response to Preliminary Finding from NRC Inspection Reports 05000259/2017408, 05000260/2017408 and 05000296/201740815 May 2017Response to Preliminary Finding from NRC Inspection Reports 05000259/2017408, 05000260/2017408 and 05000296/2017408
IR 05000259/201700110 May 2017NRC Integrated Inspection Report 05000259/2017001, 05000260/2017001, and 05000296/2017001Safe Shutdown
High Radiation Area
Non-Destructive Examination
Fire Barrier
Stroke time
Internal Flooding
Hydrostatic
Past operability
Enforcement Discretion
Functionality Assessment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Open Phase Condition
Foreign Material Exclusion
Operability Determination
Liquid penetrant
Substantial potential for overexposure
Coast down
Overexposure
IR 05000259/20174083 May 2017NRC Security Inspection Report 05000259/2017408, 05000260/2017408, and 05000296/2017408; Preliminary Greater than Green FindingSignificance Determination Process
Affidavit
IR 05000259/201740617 April 2017NRC Security Reactive Inspection Report 05000259/2017406, 05000260/2017406, and 05000296/2017406. (Cover Letter Only)Significance Determination Process
Affidavit
IR 05000259/201740320 March 2017U.S. Nuclear Regulatory Commission Physical Security Inspection Report 05000259/2017403, 05000260/2017403 and 05000296/2017403 (Letter Only)Affidavit
IR 05000259/201740517 March 2017Cyber Security Follow-Up Inspection Report 05000259/2017405, 05000260/2017405 and 05000296/2017405 (Letter Only)Cyber Security
Affidavit
IR 05000259/20160061 March 2017Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Report 05000259/2016006, 05000260/2016006 and 05000296/2016006)Open Phase Condition
Spent Fuel Pool Instrumentation
Power Uprate
IR 05000259/20160048 February 2017NRC Integrated Inspection Report 05000259/2016004, 05000260/2016004, and 05000296/2016004Non-Destructive Examination
Fire Barrier
Time to boil
Past operability
Coatings
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Fire Watch
Power change
Downpower
IR 05000298/201600426 January 2017NRC Integrated Inspection Report 05000298/2016004 and Exercise of Enforcement DiscretionReactor Vessel Water Level
High Radiation Area
Stroke time
Enforcement Discretion
Fire impairment
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Excess Flow Check Valve
Operability Determination
Fire Protection Program
Fire Watch
Scaffolding
Substantial potential for an overexposure
Overexposure
IR 05000259/201650124 January 2017U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report 05000259/2016501; 05000260/2016501; and 05000296/2016501
IR 05000259/201601528 November 2016Browns Ferry Nuclear Plant - Notice Of Violation And Proposed Imposition Of Civil Penalty - $140,000, NRC Inspection Report 05000296/2016015 And Investigation Report No. 2-2015-037Fire Protection Program
Fire Watch
Hourly Fire Watch
IR 05000296/201601528 November 2016Notice of Violation and Proposed Imposition of Civil Penalty - $140,000, NRC Inspection Report 05000296/2016015 and Investigation Report No. 2-2015-037Fire Protection Program
Fire Watch
Hourly Fire Watch
IR 05000259/20160039 November 2016Browns Ferry Nuclear Plant - NRC Integrated Inspection Report 05000259/20160003, 05000260/2016003, AND 05000296/2016003Safe Shutdown
Packing leak
High Radiation Area
Fire Barrier
Stroke time
Past operability
Enforcement Discretion
Functionality Assessment
Locked High Radiation Area
Aging Management
Corrosion bonding
Significance Determination Process
Job Performance Measure
Scram Discharge Volume
Operability Determination
Fire Protection Program
Fire Watch
Downpower
Coast down
Weak link
Power Uprate
Failure to Scram
IR 05000260/20160039 November 2016NRC Integrated Inspection Report 05000259/20160003, 05000260/2016003, and 05000296/2016003Safe Shutdown
Packing leak
Fire Barrier
Stroke time
Past operability
Enforcement Discretion
Functionality Assessment
Corrosion bonding
Significance Determination Process
Job Performance Measure
Scram Discharge Volume
Operability Determination
Fire Protection Program
Fire Watch
Downpower
Coast down
Weak link
Power Uprate
IR 05000259/20160009 November 2016Browns Ferry Nuclear Plant - NRC Integrated Inspection Report 05000259/20160003, 05000260/2016003, and 05000296/2016003Safe Shutdown
Packing leak
High Radiation Area
Fire Barrier
Stroke time
Past operability
Enforcement Discretion
Functionality Assessment
Aging Management
Corrosion bonding
Significance Determination Process
Job Performance Measure
Scram Discharge Volume
Operability Determination
Fire Protection Program
Fire Watch
Downpower
Coast down
Weak link
Power Uprate
Failure to Scram
IR 05000260/201601428 October 2016Inspection Report 05000260/2016014; Investigation Report No. 2-2015-008; and Notice of Violation
IR 05000259/201601428 October 2016Browns Ferry Nuclear Plant - Inspection Report 05000260/2016014; Investigation Report No. 2-2015-008; and Notice of Violation
IR 05000259/201601126 September 2016NRC Triennial Fire Protection Inspection Report 05000259/2016011, 05000260/2016011, 05000296/2016011 and Notice of Enforcement DiscretionHot Short
Safe Shutdown
Unanalyzed Condition
Fire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Emergency Lighting
B.5.b
Significance Determination Process
Fire Protection Program
Fire Watch
IR 05000259/201600531 August 2016Mid-Cycle Assessment Letter for Browns Ferry Nuclear Plant Units 1, 2 and 3, NRC Inspection Reports 05000259/2016005, 05000260/2016005 and 05000296/2016005Spent Fuel Pool Instrumentation
ML16225A20811 August 2016NRC Integrated Inspection Report 05000259/2016002, 05000260/2016002, and 05000296/2016002Safe Shutdown
Time of Discovery
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Time to boil
Internal Flooding
Hydrostatic
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Downpower
IR 05000259/201600211 August 2016NRC Integrated Inspection Report 05000259/2016002, 05000260/2016002, and 05000296/2016002Safe Shutdown
Time of Discovery
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Time to boil
Internal Flooding
Hydrostatic
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Annual Radioactive Effluent Release Report
Operability Determination
Downpower
Siren
IR 05000296/201601327 July 2016IR 05000296/2016013, Investigation Report 2-2015-037 Apparent Violations, March 11, 2016Fire impairment
Fire Protection Program
Fire Watch
Hourly Fire Watch
IR 05000259/201601327 July 2016Browns Ferry, IR 05000296/2016013, Investigation Report 2-2015-037 Apparent Violations, March 11, 2016Fire impairment
Fire Protection Program
Fire Watch
Hourly Fire Watch
IR 05000260/201601223 June 2016NRC Inspection Report 05000260/2016012, Investigation Report 2-2015-008, and Apparent Violations
IR 05000259/201601025 May 2016NRC Design Bases (Programs) Inspection Report Nos. 05000259/2016010, 05000260/2016010, and 05000296/2016010Significance Determination Process
IR 05000259/201600113 May 2016Browns Ferry Nuclear Plant - NRC Integrated Inspection Report 05000296/2016001, January 1, 2016, through March 31, 2016
IR 05000296/201600113 May 2016NRC Integrated Inspection Report 05000296/2016001, January 1, 2016, Through March 31, 2016Safe Shutdown
Time of Discovery
Packing leak
High Radiation Area
Non-Destructive Examination
Fire Barrier
Stroke time
Enforcement Discretion
Functionality Assessment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Process Control Program
Operability Determination
Liquid penetrant
Fire Watch
Substantial potential for overexposure
Downpower
Overexposure
IR 05000259/201640312 May 2016U.S. Nuclear Regulatory Commission Physical Security Inspection Report 05000259/2016403, 05000260/2016403 and 05000296/2016403 - OUO RemovedAffidavit
IR 05000259/201600920 April 2016Browns Ferry Nuclear Plant, Unit 3 - U.S. Nuclear Regulatory Commission Post-Approval Site Inspection For License Renewal, Inspection Report 05000296/2016009, March 711, 2016Aging Management
License Renewal
IR 05000296/201600920 April 2016U.S. Nuclear Regulatory Commission Post-Approval Site Inspection for License Renewal, Inspection Report 05000296/2016009, March 711, 2016Aging Management
License Renewal
IR 05000259/201600725 March 2016NRC Problem Identification and Resolution IR 05000259/2016007, 05000260/2016007 and 05000296/2016007, February 811, 2016 and February 2225, 2016Fukushima Dai-Ichi
Significance Determination Process
IR 05000259/20150062 March 2016Annual Assessment Letter for Browns Ferry Nuclear Plant Units 1, 2 and 3 NRC Inspection Reports 05000259/2015006, 05000260/2015006 and 05000296/2015006Spent Fuel Pool Instrumentation
License Renewal
IR 05000259/201500412 February 2016NRC Integrated Inspection Report 05000259/2015004, 05000260/2015004, and 05000296/2015004 Apparent ViolationsSignificance Determination Process
IR 05000259/201620110 February 2016NRC Security Inspection Report 05000259/2016201, 05000260/2016201 and 05000296/2016201Affidavit
IR 05000259/20150071 February 2016NRC Component Design Bases Inspection Report 05000259/2015007, 05000260/2015007 and 05000296/2015007Safe Shutdown
Past operability
Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Battery sizing
IR 05000259/201530213 January 2016NRC Operator License Examination Report 05000259/2015302, 05000260/2015302, 05000296/2015302Job Performance Measure
IR 05000259/201550224 November 2015Browns Ferry Nuclear Plant - U.S. Nuclear Regulatory Commission Emergency Preparedness Inspection Report 05000259/2015502, 05000260/2015502, And 05000296/2015502
IR 05000259/20150039 November 2015IR 05000259/2015003, 05000260/2015003, 05000296/2015003; on 07/01/15 - 09/30/15, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Problem Identification and Resolution of ProblemsSafe Shutdown
Ultimate heat sink
Fire Barrier
Stroke time
Internal Flooding
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Downpower
IR 05000259/20150051 September 2015Mid-Cycle Assessment Letter for the Browns Ferry Nuclear Plant Units 1, 2 and 3, NRC Inspection Report 005000259/2015005, 005000260/2015005, and 005000296/2015005Spent Fuel Pool Instrumentation
License Renewal
IR 05000259/201540624 August 2015IR 05000259/2015406, 05000260/2015406 and 05000296/2015406, on 07/17/2015, Brown Ferry Nuclear Plant - U.S. Nuclear Regulatory Commission Security Target Set InspectionAffidavit
IR 05000259/201540424 August 2015NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7 (NRC Inspection Report No. 05000259/2015404, 05000260/2015404 and 05000296/2015404) OUO RemovedCyber Security
Affidavit
IR 05000259/201540319 August 2015IR 05000259/2015403, 05000260/2015403, and 05000296/2015403, on 08/01/2015, Browns Ferry Nuclear Station - NRC Security InspectionAffidavit
IR 05000259/201500210 August 2015IR 05000259/2015002, 05000260/2015002, 05000296/2015002; 04/01/2015 - 06/30/2015; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Occupational Radiation SafetySafe Shutdown
Packing leak
High Radiation Area
Non-Destructive Examination
Fire Barrier
Post Accident Monitoring
Internal Flooding
Hydrostatic
Enforcement Discretion
Locked High Radiation Area
Aging Management
Significance Determination Process
Foreign Material Exclusion
Excess Flow Check Valve
Operability Determination
Fire Protection Program
Substantial potential for overexposure
Downpower
Overexposure
IR 05000259/20154058 June 2015IR 05000259/2015405, 05000260/2015405, and 05000296/2015405, May 7, 2015, Browns FerryAffidavit
IR 05000259/201500112 May 2015IR 05000259/2015001, 05000260/2015001, 05000296/2015001; 1/01/2015 - 03/31/2015; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Equipment Alignment, Licensed Operator Requalification and Performance, Operability Determinations and FunctionalSafe Shutdown
Unanalyzed Condition
Fire Barrier
Time to boil
Past operability
Temporary Modification
Functionality Assessment
Corrosion bonding
Significance Determination Process
Design basis earthquake
Foreign Material Exclusion
Large early release frequency
Operability Determination
Maintenance Rule Program
Downpower
IR 05000259/20140014 March 2015Annual Assessment Letter for Browns Ferry Nuclear Plant Units 1, 2 and 3 - NRC Inspection Reports 05000259/2014001, 05000260/2014001 and 05000296/2014001License Renewal
IR 05000259/20153012 March 2015Er 05000259/2015301, 05000260/2015301, 05000296/2015301; Operating Test on January 19 - 22, 2015 & Written Exam January 28, 2015; Browns Ferry Nuclear Plant; Operator License Examinations
IR 05000259/201400511 February 2015IR 05000259/2014005, 05000260/2014005, 05000296/2014005; 10/01/2014 - 12/31/2014; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Flood Protection Measures, and Post Maintenance TestingSafe Shutdown
Non-Destructive Examination
Fire Barrier
Hydrostatic
Past operability
Nondestructive Examination
Temporary Modification
FLEX
Fukushima Dai-Ichi
Significance Determination Process
Foreign Material Exclusion
Operability Determination
EVT-1
Dissimilar Metal Weld
Power change
Downpower
IR 05000259/201400430 October 2014IR 05000259-2014004, 05000260-2014004, 05000296-2014004; 07/01/2014 - 09/30/2014; Browns Ferry Nuclear Plant, Units 1, 2 & 3; Fire Protection, Operability Determinations and Functionality Assessment, and Follow-up of Events and Notices of ESafe Shutdown
Fire Barrier
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Job Performance Measure
Operability Determination
Maintenance Rule Program
Fire Protection Program
Downpower
Unidentified leakage
IR 05000259/201401216 October 2014Safe Shutdown
IR 05000259/201400829 September 2014Safe Shutdown
Stroke time
Internal Flooding
Power Uprate
IR 05000259/20140062 September 2014Mid-Cycle Assessment Letter for Browns Ferry Nuclear Plant Units 1, 2 and 3 (NRC Inspection Reports 05000259/2014006, 05000260/2014006 and 05000296/2014006)Spent Fuel Pool Instrumentation
IR 05000259/20144045 August 2014Browns Ferry Public Insp Report 2014-404 JBAffidavit
IR 05000259/201400330 July 2014IR 05000259-14-003, 05000260-14-003 & 05000296-14-003, on 04/01/2014 - 06/30/2014, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Flood Protection MeasuresSafe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Past operability
Significance Determination Process
Operability Determination
Downpower
Siren
IR 05000259/201300527 June 2014IR 05000259-13-005, 05000260-13-005, 05000296-13-005, 05000259-13-502, 05000260-13-502, 05000296-13-502, on 10/01/2013 & 12/31/2013; Browns Ferry Nuclear Plant, Units 1, 2 and 3, Adverse Weather Protection, Licensed Operator RequalificationSafe Shutdown
Unanalyzed Condition
Mission time
Fire Barrier
Internal Flooding
Past operability
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Control of Heavy Loads
Preliminary White Finding
Fire Protection Program
Power change
Downpower
IR 05000259/201401119 June 2014IR 05000259-14-011, 05000260-14-011, and 05000296/2014011, on 05/05/2014 & 05/09/2014, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Post Approval Site Inspection for License RenewalHydrostatic
Aging Management
License Renewal
Maintenance Rule Program
IR 05000259/20120059 June 2014IR 05000259-12-005, 05000260-12-005, 05000296-12-005; on 10/01/2012 - 12/31/2012; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Amended Integrated ReportNon-Destructive Examination
Fire Barrier
Past operability
Corrosion bonding
Fukushima Dai-Ichi
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Scaffolding
Power change
Downpower
Failure to Scram
IR 05000259/20143015 June 2014Er 05000259-14-301, 05000260-14-301, 05000296-14-301; April 28 - May 1, 2014 & Written Exam May 9, 2014; Browns Ferry Nuclear Plant, Operator License ExaminationsJob Performance Measure
IR 05000259/201401015 May 2014IR 05000259-14-010 and 05000260-14-010, April 7, 2014 Through April 11, 2014, Browns Ferry, Supplemental Inspection ReportSafe Shutdown
Half scram
Past operability
Operability Determination
IR 05000259/201400230 April 2014Integrated Inspection Report, Final Significance Determination of White Finding and Notice of Violation 05000259-14-002, 05000260-14-002, and 05000296-14-002Safe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Mission time
Fire Barrier
Time to boil
Internal Flooding
Past operability
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Process Control Program
Operability Determination
Annual Radiological Effluent Release Report
Severe Accident Management Guideline
License Renewal
Control of Heavy Loads
EVT-1
Preliminary White Finding
Fire Protection Program
Downpower
IR 05000259/201400710 April 2014IR 05000259-14-007, 05000260-14-007, 05000296-14-007; on February 3 - 28, 2014; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Biennial Inspection of the Problem Identification and Resolution ProgramPast operability
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
IR 05000259/20144034 April 2014IR 05000259-14-403,05000260-14-403 & 05000296-14-403, on 03/06/2014, Browns Ferry Nuclear Plant - NRC Security Inspection ReportFitness for Duty
Affidavit
IR 05000259/201440513 March 2014IR 05000259/2014-405, 05000260/2014-405, and 05000296/2014-405; Browns Ferry Nuclear Plant, on 01/30-31/2014, NRC Temporary Instruction 2515/186 - Cover Letter, OUO RemovedAffidavit
IR 05000296/201400925 February 2014Inspection Report (IR) 05000296-14-009; 1/21/2014 - 1/24/2014; Browns Ferry Nuclear Plant, Unit 3; Supplemental Inspection - Inspection Procedure (IP) 95001Power change
IR 05000259/201400925 February 2014Inspection Report (IR) 05000296-14-009; 1/21/2014 - 1/24/2014; Browns Ferry Nuclear Plant, Unit 3; Supplemental Inspection - Inspection Procedure (IP) 95001Power change
ML14045A32014 February 2014EA-14-005-IR 05000259-13-005, 05000260-13-005, 05000296-13-005, 10/01/2013 and 12/31/2013, Browns Ferry, Units 1, 2, and 3, Adverse Weather Protection, Licensed Operator Requalification...Safe Shutdown
Unanalyzed Condition
Mission time
Fire Barrier
Internal Flooding
Past operability
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Aging Management
Significance Determination Process
Control of Heavy Loads
Preliminary White Finding
Power change
Downpower
IR 05000259/201301427 January 2014IR 05000259-13-014, 05000260-13-014, 05000296-13-014; 12/02/2013 - 12/13/2013; Browns Ferry Nuclear Plant, Unit 1, 2, & 3; Follow-up Inspection - Inspection Procedure (IP) 92702Safe Shutdown
Time of Discovery
IR 05000260/201301510 January 2014IR 05000260-13-015; 12/09/2013 - 12/12/2013; Browns Ferry Nuclear Plant, Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95001Condition Adverse to Quality
IR 05000259/201301510 January 2014IR 05000260-13-015; 12/09/2013 - 12/12/2013; Browns Ferry Nuclear Plant, Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95001Condition Adverse to Quality
IR 05000259/201301019 December 2013IR 05000259-13-010, 05000260-13-010 and 05000296-13-010; 10/28 - 11/8/2013; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Fire Protection (Triennial) - OUO RemovedSafe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
B.5.b
Significance Determination Process
Job Performance Measure
Fire Protection Program
Fire Watch
IR 05000259/201300414 November 2013IR 05000259-13-004, 05000260-13-004, & 05000296-13-004, July 1, 2013, Through September 30, 2013, Browns Ferry, Integrated Inspection Report and Exercise of Enforcement DiscretionHot Short
Safe Shutdown
Unanalyzed Condition
Reactor Vessel Water Level
Ultimate heat sink
Fire Barrier
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Significance Determination Process
Excess Flow Check Valve
Operability Determination
Fuel cladding
Fire Protection Program
Downpower
IR 05000259/201330221 October 2013Er 05000259/13-302, 05000260/13-302, and 05000296/13-302; Operating Retake Test September 25-26, 2013, Browns Ferry Nuclear Plant, Operator License ExaminationJob Performance Measure
ML13280A2763 October 2013IR 05000259, -260, -296/2013-009; 08/05/2013 - 08/23/2013; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Post Approval Site Inspection for License RenewalNon-Destructive Examination
Fire Barrier
Weld Overlay
Coatings
Incorporated by reference
Aging Management
License Renewal
Subsequent License Renewal
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Biofouling
Fire Protection Program
IR 05000259/20130093 October 2013IR 05000259, -260, -296/2013-009; 08/05/2013 - 08/23/2013; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Post Approval Site Inspection for License RenewalNon-Destructive Examination
Fire Barrier
Weld Overlay
Coatings
Incorporated by reference
Aging Management
License Renewal
Subsequent License Renewal
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Biofouling
Fire Protection Program
IR 05000259/201320130 September 2013IR 05000259-13-201, 05000260-13-201, and 05000296-13-201, 8/16/2013, Browns Ferry Nuclear Plant, Units 1, 2, and 3 - NRC Security Inspection Report (Cover Letter)Affidavit
IR 05000260/201301323 August 2013IR 05000260-13-013, and Notice of Violation, 05/14/2013, Browns Ferry Nuclear Plant, Final Significance Determination of White FindingHalf scram
Significance Determination Process
Preliminary White Finding
IR 05000259/201301323 August 2013IR 05000260-13-013, and Notice of Violation, 05/14/2013, Browns Ferry Nuclear Plant, Final Significance Determination of White FindingHalf scram
Significance Determination Process
Preliminary White Finding
IR 05000259/201301122 August 2013IR 05000259-13-011, 05000260-13-011,05000296-13-011;05/24/2013; Browns Ferry Nuclear Plant - NRC Supplemental 95003 Inspection ReportSafe Shutdown
Time of Discovery
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Past operability
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Aging Management
Significance Determination Process
Operability Determination
Time Critical Operator Action
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
Scaffolding
Grace period
Incremental Core Damage Probability Deficit
IR 05000259/201200922 August 2013IR 05000259-13-011, 05000260-13-011,05000296-13-011;05/24/2013; Browns Ferry Nuclear Plant - NRC Supplemental 95003 Inspection ReportSafe Shutdown
Time of Discovery
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Past operability
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Aging Management
Significance Determination Process
Operability Determination
Time Critical Operator Action
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
Scaffolding
Grace period
Incremental Core Damage Probability Deficit
ML13254A34519 August 2013IR 05000259-13-10, 05000260-13-10, 05000296-13-10,on 01/31/2013, Browns Ferry Nuclear Plant - Notification of Conduct of a Triennial Fire Protection Baseline InspectionSafe Shutdown
Fitness for Duty
Hydrostatic
Operator Manual Action
Temporary Modification
Multiple Spurious Operation
Emergency Lighting
Job Performance Measure
Thermoset
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Exemption Request
Maintenance Rule Program
Fire Protection Program
ML13231A23019 August 2013IR 05000259-13-302, 05000260-13-302, 05000296-13-302, Browns Ferry Nuclear Plant - Notification of Licensed Operator Retake Initial Examination
IR 05000259/201300314 August 2013IR 05000259-13-003, 05000260-13-003, 05000296-13-003; 04/01/2013 - 06/30/2013; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Equipment Operability Evaluations and Follow-up of EventsSafe Shutdown
Unanalyzed Condition
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Post Accident Monitoring
Hydrostatic
Past operability
Operator Manual Action
Significance Determination Process
Foreign Material Exclusion
Excess Flow Check Valve
Operability Determination
Maintenance Rule Program
Fatigue Rule
Downpower
IR 05000260/201320130 July 201307/24/2013 Summary of Public Conference Meeting With Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater Than Green Finding Associated with One Apparent Violation Documented in NRC Inspection Report 05000260
IR 05000259/201330123 July 2013Er 05000259/13-301, 05000260/13-301 and 05000296/13-301, Operating Test June 3-7, 2013, & Written Exam June 28, 2013, Browns Ferry Nuclear Plant, Operator License Examinations, Units 1, 2, and 3Job Performance Measure
Fatigue Rule
IR 05000259/201340517 July 2013IR 05000259-13-405, 05000260-13-405 and 05000296-13-405, Browns Ferry, Special Inspection - Cover LetterAffidavit
IR 05000259/201350327 June 2013IR 05000259, 05000260, 05000296-13-503, on 06/03/2013, 06/07/2013, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Exercise and Baseline Inspection
IR 05000259/201300725 June 2013IR 05000259-13-007, 05000260-13-007, 05000296-13-007, 05000259-13-404, 05000260-13-404, 05000296-13-404; Tnv; 01/28/2013 - 02/28/2013; Browns Ferry Plant Units 1, 2, and 3, Component Design Bases Inspection ReportSafe Shutdown
Unanalyzed Condition
Probabilistic Risk Assessment
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Operability Determination
Time Critical Operator Action
Reasonable doubt of operability
Weak link
Affidavit
IR 05000260/201301211 June 2013IR 05000260-13-012, on 06-11-2013, Browns Ferry, Preliminary White Finding LetterSignificance Determination Process
Preliminary White Finding
IR 05000259/201301211 June 2013IR 05000260-13-012, on 06-11-2013, Browns Ferry, Preliminary White Finding LetterSignificance Determination Process
Preliminary White Finding
IR 05000259/201300214 May 2013IR 05000259-13-002, 05000260-13-002, 05000296-13-002; 01/01/2013 - 03/31/2013; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Operability Evaluations and Follow-up of EventsSafe Shutdown
Non-Destructive Examination
Fire Barrier
Internal Flooding
Past operability
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Large early release frequency
Excess Flow Check Valve
Operability Determination
Severe Accident Management Guideline
Liquid penetrant
Downpower
IR 05000260/201300825 April 2013IR 05000260-13-008; April 1 - 4, 2013; Browns Ferry Nuclear Plant Unit 2; Post-Approval Site Inspection for License RenewalCoatings
Nondestructive Examination
Aging Management
Moisture barrier
License Renewal
Maintenance Rule Program
IR 05000259/201300825 April 2013IR 05000260-13-008; April 1 - 4, 2013; Browns Ferry Nuclear Plant Unit 2; Post-Approval Site Inspection for License RenewalCoatings
Nondestructive Examination
Aging Management
Moisture barrier
License Renewal
Maintenance Rule Program
IR 05000259/20120014 March 2013Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 & 3 (IR 05000259-12-001, 05000260-12-001, and 05000296-12-001)License Renewal
IR 05000259/201340311 February 2013IR 05000259-13-403, 05000260-13-403, and 05000296-13-403; on 01/11/2013; Browns Ferry; NRC Security Inspection Report (Cover Letter)Affidavit
ML13039A3218 February 2013IR 05000259-12-005, 05000260-12-005, 05000296-12-005; 10/01/2012 - 12/31/2012; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Event Follow-up and Identification and Resolution of ProblemsPacking leak
Half scram
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Stroke time
Past operability
Anchor Darling
Corrosion bonding
Fukushima Dai-Ichi
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Operability Determination
Scaffolding
Power change
Downpower
IR 05000259/20124036 December 2012IR 05000259-12-403; 05000304-12-403, 11/6/2012 Zion Nuclear Power Station (Permanently Shut Down)Nrc Security, Material Control and Accounting Program Inspection Report - Cover Letter
IR 05000259/201201630 November 2012Inspection Report 05000296-12-016, on November 13 - 16, 2012, Browns Ferry Nuclear Plant, Unit 3, Inspection Procedure 95001, Supplemental Inspection - Inspection Procedure (IP) 95001Safe Shutdown
Half scram
IR 05000296/201201630 November 2012Inspection Report 05000296-12-016, on November 13 - 16, 2012, Browns Ferry Nuclear Plant, Unit 3, Inspection Procedure 95001, Supplemental Inspection - Inspection Procedure (IP) 95001Safe Shutdown
Half scram
IR 05000259/201201530 November 2012IR 05000259-12-015, on 10/15/2012 - 10/17/2012, Browns Ferry Nuclear Plant, Unit 1, Supplemental Inspection - Inspection Procedure (IP) 95001Operability Determination
IR 05000259/201201129 November 2012NRC Post-Approval Site Inspection for License Renewal, Inspection Report 05000259-12-011Aging Management
License Renewal
IR 05000259/201201423 November 2012IR 05000259-12-014, 05000260-12-014, 05000296-12-014; 10/08/2012 - 10/11/2012; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Supplemental Inspection - Inspection Procedure (IP) 95001Safe Shutdown
Fire Protection Program
IR 05000259/201200319 November 2012Errata for Browns Ferry Nuclear Plant - NRC Integrated Inspection Report, 05000259-12-003, 05000260-12-003, 05000296-12-003, 05000259-12-502, 05000260-12-502, and 05000296-12-502
IR 05000259/201200413 November 2012IR 05000259-12-004, 05000260-12-004, 05000296-12-004, on 07/01/2012 - 09/30/2012, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Identification and Resolution of Problems, and Event Follow-upHot Short
Safe Shutdown
Unanalyzed Condition
Time of Discovery
Packing leak
Mission time
Fire Barrier
Internal Flooding
Past operability
Enforcement Discretion
Operating Basis Earthquake
Operator Manual Action
Multiple Spurious Operation
Fukushima Dai-Ichi
Significance Determination Process
Large early release frequency
Fire Protection Program
Downpower
Power Uprate
IR 05000259/20120064 September 2012Browns Ferry 2012 Mid Cycle
ML12227A71114 August 2012IR 05000259-12-003, 05000260-12-003, 05000296-12-003, 05000259/2012502, 05000260/2012502, 05000296/2012502; 04/01/2012 -06/30/2012; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Operability Evaluations, Radioactive Solid Waste Processing anHigh Radiation Area
Half scram
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Past operability
Probabilistic Risk Assessment
Coatings
Locked High Radiation Area
Tornado Generated Missile
Significance Determination Process
Foreign Material Exclusion
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Fire Watch
Downpower
Reverse polarity
IR 05000259/201201313 August 2012Browns Ferry Final Significance Determination of White Finding and Notice of Violation Follow-Up Assessment LetterSafe Shutdown
Significance Determination Process
Preliminary White Finding
IR 05000259/201230116 July 2012Er 05000259-12-301, 05000260-12-301 & 05000296-12-301; 05/17 - 18/2012 & Written Exam 05/18/2012; Browns Ferry Nuclear Plant, Operator License Examinations
ML12174A26522 June 2012IR 05000259-12-403, 05000260-12-403, and 05000296-12-403, on 25/2012, Brown Ferry, NRC Security Inspection ReportSignificance Determination Process
IR 05000259/201201222 June 2012Browns Ferry Choice Letter 2012012, Preliminary White FindingSafe Shutdown
Probabilistic Risk Assessment
Significance Determination Process
Preliminary White Finding
IR 05000259/201200728 May 2012IR 05000259-12-007, 05000260-12-007; 05000296-12-007, 02/06/2012 - 03/01/2012; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Identification and Resolution of ProblemsHot Short
Safe Shutdown
Unanalyzed Condition
Time of Discovery
Fire Barrier
Enforcement Discretion
Operator Manual Action
Multiple Spurious Operation
Condition Adverse to Quality
Significance Determination Process
Fatigue Rule
Continuous fire watch
Fire Protection Program
Scaffolding
IR 05000259/201200227 April 2012IR 05000259-12-002, 05000260-12-002, 05000296-12-002, 07200052-12-001, on 01/01/2012 -03/31/2012, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Fire Protection, Event Follow-up, Other ActivitiesSafe Shutdown
Mission time
Fire Barrier
Internal Flooding
Past operability
Fire impairment
Significance Determination Process
Operability Determination
Severe Accident Management Guideline
Fuel cladding
Continuous fire watch
Fire Protection Program
Grace period
Downpower
IR 05000259/20115025 March 2012NRC Emergency Preparedness Annual Inspection 05000259/2011502; 05000260/2011502; 05000296/2011502
IR 05000259/201101228 February 2012IR 05000259-11-012, 05000260-11-012 & 05000296-11-012, Browns Ferry Nuclear Plant, Units 1, 2, and 3, 10/1/2011 - 12/31/2011, Supplemental Inspection - Inspection Procedure (IP) 95003Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
License Renewal
Scaffolding
IR 05000259/201100513 February 2012IR 05000259-11-005, 05000260-11-005, 05000296-11-005; 10/01/2011 -12/31/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Event Follow-upSafe Shutdown
Time of Discovery
Packing leak
Mission time
Fire Barrier
Past operability
Temporary Modification
Tornado Generated Missile
Significance Determination Process
Grace period
Power change
Downpower
Unidentified leakage
IR 05000259/201201023 January 2012IR 05000259-12-010, 05000260-12-010 & 05000296-12-010 and Notice of Violation on 09/23/11, Browns Ferry
IR 05000259/20115016 January 2012IR 05000259-11-501, 05000260-11-501 and 05000296-11-501, on 12/05/2011 - 12/09/2011, for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Exercise and Baseline Inspection
IR 05000259/201101117 November 2011EA-11-018, EA-11-252, IR 05000259-11-011, 05000260-11-011, 05000296-11-011, Browns Ferry Nuclear Plant, Units 1, 2, & 3, 09/12/2011- 09/23/2011, Supplemental Inspection - Inspection Procedure (IP) 95003Condition Adverse to Quality
Significance Determination Process
Cold shutdown justification
IR 05000259/201100414 November 2011IR 05000259-11-004, 05000260-11-004, 05000296-11-004; on 07/01/2011 - 09/30/2011, Browns Ferry, Units 1, 2, and 3; Integrated Inspection ReportSafe Shutdown
Reactor Vessel Water Level
Mission time
Fire Barrier
Time to boil
Internal Flooding
Fire impairment
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Scram Discharge Volume
Fire Protection Program
Fire Watch
Hourly Fire Watch
Downpower
Flow Induced Vibration
Power Uprate
IR 05000296/201130212 October 2011Operator Licensing Written Examination Approval 05000296, 270, 287/2011302
IR 05000259/201130219 September 2011Er 05000259-11-302, 05000260-11-302, and 05000296-11-302, Operating Test August 8 - 12, 2011 & Written Exam August 19, 2011; Browns Ferry Nuclear Plant, Operator License ExaminationsJob Performance Measure
Hardened vent
IR 05000259/201140314 September 2011IR 05000259-11-403, 05000260-11-403, 05000296-11-403, on 08/18/2011, Brown Ferry Nuclear Plant, NRC Security Inspection ReportAffidavit
IR 05000259/201101016 August 2011
IR 05000259/20110038 August 2011IR 05000259-11-003, 05000260-11-003, 05000296-11-003; 04/01/2011 - 06/30/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Annual Heat Sink Performance, Operability EvaluationsReactor Vessel Water Level
Fire Barrier
Post Accident Monitoring
Hydrostatic
Past operability
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
B.5.b
Corrosion bonding
Significance Determination Process
Scram Discharge Volume
Excess Flow Check Valve
Operability Determination
Severe Accident Management Guideline
Downpower
IR 05000259/201140220 May 2011IR 05000259-11-402, IR 0500260-11-402, and IR 05000296-11-402, on 02/18/2011, (Corporate Office) & 04/21/2011, (K.Polson & Members Staff at Plant), Browns Ferry Nuclear Plant, NRC Security InspectionSignificance Determination Process
Affidavit
IR 05000259/201100213 May 2011IR 05000259-11-002, 05000260-11-002, 05000296-11-002 & 07200052-11-002, on 01/01/2011 - 03/31/2011, Browns Ferry, Units 1, 2 & 3, NRC Integrated Inspection and Notice of ViolationSafe Shutdown
Time of Discovery
Packing leak
High Radiation Area
Mission time
Fire Barrier
Weld Overlay
Post Accident Monitoring
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Operator Manual Action
Cyber Security
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Severe Accident Management Guideline
Liquid penetrant
Fatigue Rule
Scaffolding
Grace period
Downpower
Flow Induced Vibration
Weak link
Power Uprate
IR 05000259/201100913 May 2011NRC Temporary Instruction 2515/183 Inspection Report 05000259/2011009, 05000260/2011009, 05000296/2011009Internal Flooding
B.5.b
Seismically rugged
Severe Accident Management Guideline
Earthquake
IR 05000259/20100058 April 2011Summary of Meeting with Browns Ferry to Discuss One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-10-005, 05000260-10-005, and 05000296-10-005Safe Shutdown
Fire Barrier
Stroke time
Probabilistic Risk Assessment
Operator Manual Action
Finite Element Analysis
Significance Determination Process
IR 05000259/20113014 April 2011Er 05000259-11-301, 05000260-11-301, and 05000296-11-301; 02/07/2011 - 02/16/2011; Browns Ferry Nuclear Plant, Units 1, 2, and 3 Operator License Examinations
IR 05000259/200100521 March 2011Notice of Meeting with Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-01-005, 05000260-10-
IR 05000259/20105029 March 2011
ML1106106412 March 2011NRC Report 05000259/2010005, 05000260/2010005, and 05000296/2010005; Preliminary Greater than Green Finding Browns Ferry Nuclear PlantSafe Shutdown
Reactor Vessel Water Level
Mission time
Fire Barrier
Weld Overlay
Internal Flooding
Past operability
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Tornado Generated Missile
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Liquid penetrant
Fire Watch
Power change
Downpower
ML1104004319 February 2011Inspection Report 2010-005 and Notice of ViolationSafe Shutdown
Reactor Vessel Water Level
Mission time
Fire Barrier
Weld Overlay
Internal Flooding
Past operability
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Tornado Generated Missile
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Opportunity to foresee and correct
Liquid penetrant
Fire Watch
Power change
Downpower
IR 05000259/20102014 February 2011IR 05000259-10-201, 05000260-10-201, and 05000296-10-201, 12/17/2010, Brows Ferry Nuclear Plant; Security Inspection (Cover Letter)Affidavit
IR 05000259/20103012 February 2011Operator Licensing Written Examination Approval 05000259-10-301, 05000260-10-301 and 05000296-10-301
IR 05000259/20100083 December 2010Safe Shutdown
Fitness for Duty
Offsite Dose Calculation Manual
Fire Barrier
Commercial Grade Dedication
Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
B.5.b
Significance Determination Process
Safeguards Contingency Plan
Maintenance Rule Program
Fire Protection Program
IR 05000259/20100068 November 2010IR 05000259-10-006, 05000260-10-006, 05000296-10-006; on 8/30/2010 - 9/24/2010; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Identification and Resolution of ProblemsPacking leak
Mission time
Condition Adverse to Quality
Significance Determination Process
Maintenance Rule Program
IR 05000259/201000429 October 2010IR 05000259-10-004, 05000260-10-004, 05000296-10-004 & 07200052-10-003, and Notice of Violation, 07/01/10 - 09/30/10, Browns Ferry, Integrated ReportSafe Shutdown
Packing leak
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Squib
Significance Determination Process
Excess Flow Check Valve
Incremental Core Damage Probability Deficit
Downpower
Power Uprate
IR 05000259/201000330 July 2010IR 0500259-10-003, 05000260-10-003, 05000296-10-003, 0500259-10-501, 05000260-10-501, 05000296-10-501 and 07200052-10-002 on 04/01/2010 - 06/30/2010 for Browns Ferry Plant, Integrated InspectionSignificance Determination Process
IR 05000259/201040219 May 2010IR 05000259-10-402, IR 05000260-10-402, and IR 05000296-10-402, for Browns Ferry, Units 1, 2 & 3, Security
IR 05000259/201000230 April 2010IR 05000259-10-002, 05000260-10-002 and 05000296-10-002 on 01/01/2010- 03/31/2010 for Browns Ferry, Units 1, 2, and 3, Integrated Inspection ReportSafe Shutdown
High Radiation Area
Non-Destructive Examination
Fire Barrier
Internal Flooding
Hydrostatic
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Earthquake
Scaffolding
Substantial potential for overexposure
Downpower
Overexposure
ML1006209783 March 2010Inspection/Activity Plan, 03/01/2010-06/30/2010, Enclosure - Report 22
IR 05000259/20090089 February 20100500259-09-008, 05000260-09-008, and 05000296-09-008; on 10/19/09 - 12/28/09; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Component Design Basis InspectionProbabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Large early release frequency
Power Uprate
IR 05000002/19600109 February 2010Notification of Licensed Operator Initial Examination - 05000259-10-301, 05000260-10-0301, 05000296-10-301
IR 05000259/20090052 February 2010IR 05000259-09-005, 05000260-09-005, and 05000296-09-005; 10/01/2009 - 12/31/2009; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Event Follow-UpTime of Discovery
Reactor Vessel Water Level
Half scram
Mission time
Fire Barrier
Tornado Generated Missile
Significance Determination Process
Scram Discharge Volume
Power change
Downpower
Power Uprate
IR 05000259/200900920 January 2010IR 05000259-09-009, 05000260-09-009, 05000296-09-009; 09/21/2009 - 09/25/2009; Browns Ferry Nuclear Plant, Units 1, 2, & 3; Triennial Fire Protection InspectionHot Short
Safe Shutdown
Reactor Vessel Water Level
Fire Barrier
Enforcement Discretion
Operator Manual Action
Emergency Lighting
Functionality Assessment
Significance Determination Process
Large early release frequency
Operability Determination
Exemption Request
Fire Protection Program
Backfit
Power Uprate
IR 05000259/200950119 November 2009
IR 05000259/200900430 October 2009IR 05000259-09-004, IR 05000260-09-004, IR 05000296-09-004, on 07/01/09 - 09/31/09, Browns Ferry, Units 1, 2, and 3Reactor Vessel Water Level
Mission time
Fire Barrier
Internal Flooding
Hydrostatic
Past operability
Corrosion bonding
Significance Determination Process
Operability Determination
Through-Wall Leak
Downpower
IR 05000259/20093019 September 2009Er 05000259-09-301, 05000260-09-301, 05000296-09-301, 07/13-17/2009 & 07/22/2009, Browns Ferry Nuclear Plant, Operator License Examinations
IR 05000259/20094032 September 2009NRC Security Inspection Report 05000259-09-403, 05000260-09-403 & 05000296-09-403Affidavit
IR 05000259/200900621 August 2009IR 05000259-09-006, 05000260-09-006 and 05000296-09-006; 5/29/2009 - 6/17/2009; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Biennial Inspection of the Identification and Resolution of ProblemsTemporary Modification
Significance Determination Process
IR 05000259/200900330 July 2009IR 05000259-09-003, 05000260-09-003 and 05000296-09-003, on 04/01/2009 - 06/30/2009, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Maintenance Risk Assessment, Access Control to Radiologically Significant Areas, and Event FollowupPacking leak
High Radiation Area
Non-Destructive Examination
Fire Barrier
Time to boil
Coatings
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Process Control Program
EVT-1
Liquid penetrant
Scaffolding
Substantial potential for overexposure
Downpower
Power Uprate
Overexposure
IR 05000259/200900714 July 2009IR 05000259-09-007, 05000260-09-007 and 05000296-09-007; 04/20 - 24/2009; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Focused Fire Protection Baseline InspectionSafe Shutdown
Enforcement Discretion
Operator Manual Action
Emergency Lighting
Job Performance Measure
Exemption Request
Fire Protection Program
Backfit
Power Uprate
IR 05000259/200900230 April 2009IR 05000259-09-002, 05000260-09-002 and 05000296-09-002, on 01/01/2009 - 03/31/2009, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Surveillance Testing, Identification and Resolution of Problems, and Event Follow-upSafe Shutdown
Reactor Vessel Water Level
Packing leak
Fire Barrier
Weld Overlay
Nondestructive Examination
Condition Adverse to Quality
Corrosion bonding
Significance Determination Process
Pressure boundary leak
Through Wall Leak
Downpower
Unidentified leakage
IR 05000259/200940227 April 2009NRC Security Inspection Report 05000259/2009402, 05000260/2009402 & 05000296/2009402Affidavit
IR 05000259/200800530 January 2009IR 05000259-08-005, 05000260-08-005 and 05000296-08-005, on 10/01/2008 - 12/31/2008, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Licensed Operator Requalification ProgramReactor Vessel Water Level
Non-Destructive Examination
Fire Barrier
Internal Flooding
Nondestructive Examination
VT-2
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Maintenance Rule Program
EVT-1
Power change
Downpower
IR 05000259/200830229 January 2009Er 05000259-08-302, Er 05000260-08-302 and Er 05000296-08-302, on 12/8 - 11, 2008 & 12/18, 2008, Browns Ferry Nuclear Plant, Units 1, 2 & 3, Licensed Operator Examinations
IR 05000259/200801016 January 2009IR 05000259-08-010 on 12/01/2008 - 12/05/2008 for Browns Ferry, Unit 1, Supplemental Inspection IP 95002 for Degraded Initiating Events Cornerstone
IR 05000259/200800722 December 2008IR 05000259-08-07, 05000260-08-007 and 05000296-08-007 on 9/29/2008 - 10/24/2008, Browns Ferry Nuclear Plant, Units 1, 2 and 3, Biennial Inspection of the Identification and Resolution of ProblemsAnchor Darling
Significance Determination Process
Operability Determination
IR 05000259/200800429 October 2008IR 05000259-08-004, 05000260-08-004 & 05000296-08-004; Tennessee Valley Authority; 07/01/2008 - 09/30/2008; Browns Ferry Nuclear Plant, Units 1, 2, and 3; NRC Integrated Inspection ReportFire Barrier
Probabilistic Risk Assessment
Temporary Modification
Tornado Generated Missile
Corrosion bonding
Scram Discharge Volume
Downpower