IR 05000259/2020402
| ML21011A105 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 01/08/2021 |
| From: | Tom Stephen NRC/RGN-II/DRP/RPB5 |
| To: | Jim Barstow Tennessee Valley Authority |
| References | |
| IR 2020402 | |
| Download: ML21011A105 (3) | |
Text
January 8, 2021
SUBJECT:
BROWNS FERRY NUCLEAR PLANT - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000259/2020402, 05000260/2020402 AND 05000296/2020402
Dear Mr. Barstow:
On December 10, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Browns Ferry Nuclear Plant. On December 15, 2020, the NRC inspectors discussed the results of this inspection with Mr. Christopher D. Dunn and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Thomas A. Stephen, Chief Reactor Projects Branch #5 Division of Reactor Projects
Docket Nos. 05000259, 05000260 and 05000296 License Nos. DPR-33, DPR-52 and DPR-68 Enclosure:
As stated
cc w/o encl: Distribution via LISTSERV
ML21011A105____________ (Cover letter)
Cover Letter Only:
x SUNSI Review x Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RII/DRP/RPB5 RII/DRP/RPB5 RII/DRP/RPB5
NAME S. Ninh M. Kirk T. Stephens
DATE 01/07/2021 01/07/2021 01/07/2021