UNITED STATES January 14, 2019

SUBJECT:

BROWNS FERRY NUCLEAR PLANT - NUCLEAR REGULATORY COMMISSION TEAM INSPECTION REPORT 05000259/2018011, 05000260/2018011, AND 05000296/2018011

Dear Mr. Shea:

On December 12, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Browns Ferry Nuclear Plant, Units 1, 2, and 3. The NRC inspectors discussed the results of this inspection with Mr. D. L. Hughes, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

The inspection examined activities conducted under your license as they relate to the implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders (EA-12-049 and EA-12-051) and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. If you have any questions, please contact me at 404-997-4513.

Sincerely,

/RA/

Shane R. Sandal, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68

Enclosure:

IR 05000259/2018011, 05000260/2018011 and 05000296/2018011

Inspection Report

Docket Numbers: 50-259, 50-260, and 50-296 License Numbers: DPR-33, DPR-52, and DPR-68 Report Numbers: 05000259/2018011, 05000260/2018011, and 05000296/2018011 Enterprise Identifier: I-2018-011-0043 Licensee: Tennessee Valley Authority (TVA)

Facility: Browns Ferry Nuclear Plant, Units 1, 2, and 3 Location: Athens, Alabama Inspection Dates: December 3 - 12, 2018 Inspectors: R. Rodriguez, Senior Project Engineer (Team Leader)

S. Freeman, Senior Reactor Analyst S. Ninh, Senior Project Engineer B. Bishop, Project Engineer Approved By: S. Sandal, Chief Reactor Projects Branch 6 Division of Reactor Projects Enclosure

SUMMARY

The NRC continued monitoring licensees performance by conducting Temporary Instruction (TI) 2515/191, Implementation of Mitigation Strategies and Spent Fuel Pool (SFP)

Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, inspection (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18191B074) at Browns Ferry Nuclear Plant, Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items Type Issue number Title Report Status Section TI TI 2515/191 Inspection of the Implementation of Other Closed Mitigation Strategies and Spent Fuel Activities Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans

TABLE OF CONTENTS

INSPECTION SCOPE

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

INSPECTION RESULTS

..............................................................................................................

EXIT MEETINGS AND DEBRIEFS

............................................................................................ 6

DOCUMENTS REVIEWED

.......................................................................................................... 7

INSPECTION SCOPE

Inspections were conducted using the appropriate portions of Temporary Instruction (TI)

procedure 2515/191, Implementation of Mitigation Strategies and Spent Fuel Pool (SFP)

Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose

Assessment Plans, (ADAMS Accession No. ML18191B074). Documents reviewed by

inspectors are listed in the documents reviewed section of this report. The inspectors reviewed

selected procedures and records, observed activities, and interviewed personnel to assess

licensee performance and compliance with Commission rules and regulations, license

conditions, site procedures, and standards.

OTHER ACTIVITIES - TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

TI 2515/191 - Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool

Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose

Assessment Plans

Inspectors verified plans for complying with NRC Orders EA-12-049, Order Modifying

Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis

External Events, (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML12056A045) and EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation, (ML12054A679) were in place and were being

implemented by the licensee. Additionally, the inspection verified implementation of staffing and

communications information provided in response to the March 12, 2012, request for

information letter (ML12053A340) and dose assessment information provided per COMSECY-

13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons

Learned, dated March 27, 2013 (ML12339A262).

(1) Based on samples selected for review, the inspectors verified that the licensee

satisfactorily implemented appropriate elements of the Diverse and Flexible Coping

Strategies (FLEX) as described in the plant-specific submittals and the associated safety

evaluation (ML18236A331) and determined that the licensee is in compliance with NRC

Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation

Strategies for Beyond-Design-Basis External Events (ML12056A045). The inspectors

verified the licensee satisfactorily:

a) developed and issued FLEX Support Guidelines (FSGs) to implement the FLEX

strategies for postulated external events;

b) integrated their FSGs into their existing plant procedures such that entry into and

departure from the FSGs were clear when using existing plant procedures;

c) protected FLEX equipment from site-specific hazards;

d) developed and implemented adequate testing and maintenance of FLEX equipment

to ensure their availability and capability;

e) trained their staff to ensure personnel proficiency in the mitigation of

beyond-design basis events; and

f) developed the means to ensure the necessary off-site FLEX equipment would be

available from off-site locations.

(2) Based on samples selected for review, the inspectors verified that the licensee

satisfactorily implemented appropriate elements of the FLEX strategy as described in the

plant specific submittals and the associated safety evaluation (ML18236A331) and

determined that the licensee was in compliance with NRC Order NRC Order EA-12-

051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool

Instrumentation (ML12054A679). The inspectors verified that the licensee satisfactorily:

a) installed the spent fuel pool (SFP) instrumentation sensors, cabling and power

supplies to provide physical and electrical separation as described in the plant

specific submittals and safety evaluation;

b) installed the SFP instrumentation display in the location, environmental conditions

and accessibility as described in the plant specific submittals;

c) trained their staff to assure personnel proficiency with the maintenance, testing, and

use of the SFP instrumentation; and

d) developed and issued procedures for maintenance, testing and use of the reliable

SFP instrumentation.

(3) The inspectors reviewed information provided in the licensees dose submittal and in

response to the NRCs March 12, 2012, request for information letter (ML12053A340),

and verified that the licensee satisfactorily implemented enhancements pertaining to

Near-Term Task Force (NTTF) Recommendation 9.3 response to a large-scale natural

emergency event that results in an extended loss of all alternating current (ac) power

(ELAP) to all site units and impedes access to the site The inspectors verified the

following:

a) the licensee satisfactorily implemented required staffing changes to support a

ELAP scenario;

b) emergency preparedness (EP) communications equipment and facilities are

sufficient for dealing with a ELAP scenario; and

c) the licensee implemented dose assessment capabilities (including releases from

SFPs) using the licensees site-specific dose assessment software and approach.

The inspectors verified that noncompliances with requirements, and standards identified during

the inspection were entered into the licensee's corrective action program as appropriate.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

No proprietary information was retained by the inspectors or documented in this report.

On December 12, 2018, the inspectors presented the inspection results to Mr.

D. L. Hughes,

Site Vice President, and other members of the licensees staff.

DOCUMENTS REVIEWED

Condition Reports Initiated as a Result of the Inspection

1449049- This CR is to document an issue identified during fulfillment of 1RFI-10 for the FLEX

Inspection scheduled for December 2018.

CR 1470881 -The failure of the Turbine Marine Generator needs to be reviewed for applicability

at BFN.

CR 1470889- During a FLEX peer team call an industry issue with FLEX Pumps freezing while

in stand-by mode during staging activities was identified.

CR 1473014 - The NRC identified several electrical components referenced in the electrical

strategy that did not have FLEX labelling.

CR 1473074- A revision of EPIP-12 Attachment 1 is needed to add a functional check of the

portable satellite phones in the Technical Support Center (TSC).

CR 1474419 - NRC Identified: During FLEX Inspection NRC questioned placement of Step 3.0

in 0-FSI-3C, Attachment 6.

Procedures

0-AOI-57-1A, Station Blackout Flow Chart, Rev. 105

0-FSI-1, Flex Response, Rev. 2

0-FSI-2A FPS1 Setup and Operation (EECW Manifold), Rev. 1

0-FSI-2A, CILRT FLEX Pump System, Rev. 2

0-FSI-2B, FPS2 Setup and Operation (RHRSW B Manifold), Rev. 0

0-FSI-2C FPS3 Setup and Operation (RHRSW D Manifold), Rev. 1

0-FSI-2E FLEX Mechanical Hose Connections from EECW, Rev. 2

0-FSI-2F FLEX Mechanical Hose Connections from CILRT, Rev. 2

0-FSI-3A, 480V FLEX Generator Setup and Operation, Rev. 4

0-FSI-3C, 4KV FLEX Generator Setup and Operation, Rev. 5

0-FSI-3F, Load Shed of 250V Main Bank Battery 1, 2, 3, Rev. 2

0-FSI-4A, Control Bay/Reactor Building Lighting and Ventilation during ELAP Rev. 3

0-FSI-4B FLEX Communication System Operation, Rev. 0

0-FSI-6A, Damage Assessment, Rev. 1

0-FSI-6B, FLEX Long Term Fueling Operations, Rev. 0

0-FSI-6E FLEX Strategies during Severe Environments, Rev. 2

0-FSI-8C FLEX Tools and Equipment Inventory Checklist, Rev. 2

0-FSI-8D, BFN FLEX Implementation During Shutdown Modes, Rev. 0

0-FSI-8E BFN FLEX Equipment and Connection Administrative Instruction, Rev. 0

1-AOI-78-1, Fuel Pool Cleanup System Failure, Rev. 25

1-EOI Appendix-13 Emergency Venting Primary Containment Rev. 3

1-EOI, Appendix-20G Spent Fuel Pool Makeup/Spray using FLEX Pump System (EECW),

Rev. 0

2-EOI Appendix-13 Emergency Venting Primary Containment, Rev. 8

2-EOI-3, Secondary Containment Control, Rev. 16

3-EOI Appendix-13, Emergency Venting Primary Containment, Rev. 5

3-EOI-1, RPV Control Unit 3 Browns Ferry Nuclear Plant Unit 3, Rev. 13

3-EOI-2, Primary Containment Control, Rev. 13

BFN-ODM-4.2, Radiological Emergency Plan (REP) Assignments, Rev. 5

CECC EPIP-17, Central Emergency Control Center Meteorologist Procedures, Rev. 23

CECC EPIP-6, CECC Plant Assessment Staff Control Center Procedure for Alert, Site

Emergency Plan Area Emergency, and Implementing General Emergency, Rev. 42

CECC EPIP-8, Dose Assessment Staff Activities Control Center during Nuclear Plant

Emergency Plan Radiological Emergencies, Rev. 47

EPIP-12, BFN UNIT 0 Emergency Equipment and Supplies, Rev. 20

EPIP-13, Dose Assessment, Rev. 24

OPDP-8, Operability Determination Process and Limiting Conditions for Operation Tracking,

Rev. 21

Drawings

0-45E701-1, Wiring Diagram, Battery Board 1, Panels 1-7, Single Line, Rev. 69

0-45E702-1, Wiring Diagram, Battery Board 2, Panels 1-7, Single Line, Rev. 65

0-45E703-1, Wiring Diagram, Battery Board 3, Panels 1-7, Single Line, Rev. 53

1-45E712-1, Wiring Diagram, 250V Reactor MOV Board 1A, Single Line, Rev. 39

1-45E712-2, Wiring Diagram, 250V Reactor MOV Board 1B, Single Line, Rev. 43

1-45E712-3, Wiring Diagram, 250V Reactor MOV Board 1C, Single Line, Rev. 18

2-45E712-1, Wiring Diagram, 250V Reactor MOV Board 2A, Single Line, Rev. 40

2-45E712-2, Wiring Diagram, 250V Reactor MOV Board 2B, Single Line, Rev. 34

2-45E712-3, Wiring Diagram, 250V Reactor MOV Board 2C, Single Line, Rev. 23

3-45E712-1, Wiring Diagram, 250V Reactor MOV Board 3A, Single Line, Rev. 31

3-45E712-2, Wiring Diagram, 250V Reactor MOV Board 3B, Single Line, Rev. 44

3-45E712-3, Wiring Diagram, 250V Reactor MOV Board 3C, Single Line, Rev. 19

3-45E670-25, Wiring Diagram, ECCS Division I Analog Trip Units Schematic Diagram, Rev. 11

3-45E670-31, Wiring Diagram, ECCS Division II Analog Trip Units Schematic Diagram, Rev. 7

3-45E614-20, Wiring Diagram, 120V AC/250V DC Valves & Miscellaneous Schematic Diagram,

Rev. 14

3-730E933-1, Elementary Diagram, Primary Containment Instrumentation System, Rev. 37

3-730E938-11, Elementary Diagram, Residual Heat Removal System, Rev. 47

PIP-02-03, AC Electrical Distribution System, Browns Ferry Nuclear Plant

PIP-15-008, FESB Door Operation, Rev. 0

PIP-15-11, 480V Flex Portable Generator Alignment, Browns Ferry Nuclear Plant, Page 1

PIP-15-11, 480V Flex Portable Generator Alignment, Browns Ferry Nuclear Plant, Page 2

PIP-15-10, Spent Fuel Pool Levels, Rev. 5

Calculations

EDQ0009992013000202, 250V DC Unit Batteries 1, 2, & 3 Evaluation for Beyond Design Basis

External Event (BDBEE) Extended Loss of AC Power (ELAP), Rev. 6

Design Changes

DCN 71162A, Fukushima Battery Backed Power to Initial Coping Equipment-Unit 1

DCN 70745, Flex Equipment Storage Building

Condition Reports

1169435 1376974

1184214 1426238

201447 1433400

216091 1449049

20088 1457721

231022 1470881

1308903 1470889

1350052 1473074

1373017

Other

Preventive Maintenance Vendor Data, dated September 24, 2018

Preventive Maintenance Vendor Data, Turbine Marine Inc, dated September 28, 2018

Preventive Maintenance Vendor Data, Turbine Marine Inc, dated January 12, 2016

Browns Ferry Mitigating Strategies Final Integrated Plan (FIP)

0-TPP-ENG-632 (Bases) Diverse and Flexible Coping Strategies (FLEX) Program Bases

Document, Rev. 2

Flex Strategy Validation Report for BFN Units 1, 2, 3 Implementation, dated March 22, 2018

BFN- Mitigation Strategies for Beyond Design- Basis External Events - Final Integrated Plan,

Dated 4/25/2018

CDQ0003602013000135, Flex Equipment Storage Building Civil Design Basis and Criteria,

Rev. 0

0-TPP-ENG-632, (Bases) Diverse and Flexible Coping Strategies (FLEX) Program Bases

Document, Rev. 4

NEI 12-01 Phase 2 Extended Loss of AC Power (ELAP) ERO Staffing Analysis Report, Rev. 1

BFN-50-7360, Browns Ferry Nuclear Plant Flex Mitigation System, Rev. 7

BFN-50-715, Browns Ferry Nuclear Plant Environmental Design, Rev. 12

FSAR, Section 2.3, Meteorology

Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Response Regarding Phase 2 Staffing

Submittal Associated With Near -Term Task Force Recommendation 9.3 Related to The

Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC NO

S. MF5689, MF5690 AND

MF5691), Dated August 11, 2015

Simulator Exercise Guide (SEG), SEG # OPL173S359, Station Blackout and Extended Loss of

AC Power (SBO/ELAP) Coping Strategies. NRC Order EA-12-049, Revision 2

OT-FLEX-001, BFN FLEX Overview, Rev. 0

OT-Flex-003, Flex Implementation, Rev. 0

OT-Flex-SBO-ELAP-001, SBO/ELAP 0-AOI-57-1A, Station Blackout Flow Chart

9