UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 17, 2017 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 SUBJECT: BROWNS FERRY NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000259/2017405, 05000260/2017405 AND 05000296/2017405

Dear Mr. Shea:

On February 1, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Browns Ferry Nuclear Plant, Units 1, 2, and 3 and discussed the results of this inspection with Mr. Michael Durr and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-identified or self-revealing findings were identified during this inspection.

However, inspectors documented a licensee-identified violation which was determined to be of very low security significance. The NRC is treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within.

30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II, the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Browns Ferry Nuclear Plant.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 0 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii)

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68 Enclosure:

Inspection Report 05000259/2017405, 05000260/2017405 and 05000296/2017405 w/Attachment: Supplemental Information (OUO)

cc: (See page 3) cc:

Mr. D. L. Hughes General Manager Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN Decatur, AL 35609 Glen E. Pry Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2C-BFN Decatur, AL 35609 Mr. James L. Paul Director, Plant Support (Interim)

Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 NAB 1A-BFN Decatur, AL 35609 Mr. Steven M. Bono Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000, NAB 2A-BFN Decatur, AL 35609 Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801 Mr. P. L. Parker Senior Manager, Site Security Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 PAB 2G-BFN Athens, AL 35609 ___ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 DWS5 AJB3 SMS NAME P. Braaten D. Strickland A. Blamey S. Shaeffer DATE 3/15/2017 3/15/2017 3/15/2017 3/17/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO