October 26, 2020
SUBJECT:
BROWNS FERRY NUCLEAR PLANT - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000259/2020011, 05000260/2020011 AND 05000296/2020011
Dear Mr. Barstow:
On September 18, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Browns Ferry Nuclear Plant. On September 17, 2020 the NRC inspectors discussed the results of this inspection with Mr. Steven M. Bono and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspection team reviewed the stations corrective action program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for corrective action programs. Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.
Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
Finally the team reviewed the stations programs to establish and maintain a safety-conscious work environment, and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews the team found no evidence of challenges to your organizations safety-conscious work environment.
Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available.
No findings or violations of more than minor significance were identified during this inspection. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Thomas A. Stephen, Chief Reactor Projects Branch #5 Division of Reactor Projects
Docket Nos. 05000259, 05000260 and 05000296 License Nos. DPR-33, DPR-52 and DPR-68
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000259, 05000260 and 05000296
License Numbers:
Report Numbers:
05000259/2020011, 05000260/2020011 and 05000296/2020011
Enterprise Identifier: I-2020-011-0036
Licensee:
Tennessee Valley Authority
Facility:
Browns Ferry Nuclear Plant
Location:
Athens, Alabama
Inspection Dates:
August 24, 2020 to September 18, 2020
Inspectors:
J. Hamman, Reactor Inspector (Team Lead)
M. Kennard, Sr. Operations Engineer
S. Ninh, Senior Project Engineer
R. Rodriguez, Senior Project Engineer
J. Seat, Senior Resident Inspector
Approved By:
Thomas A. Stephen, Chief
Reactor Projects Branch #5
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at Browns Ferry Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19),inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
OTHER ACTIVITIES - BASELINE
71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 02.04)
- (1) The inspectors performed a biennial assessment of the licensees corrective action program, use of operating experience, self-assessments and audits, and safety conscious work environment.
- Corrective Action Program Effectiveness: The inspectors assessed the corrective action programs effectiveness in identifying, prioritizing, evaluating, and correcting problems. The inspectors also conducted a five-year review of equipment aging issues.
- Operating Experience, Self-Assessments and Audits: The inspectors assessed the effectiveness of the stations processes for use of operating experience, audits, and self-assessments.
- Safety-Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.
INSPECTION RESULTS
Assessment 71152B Based on the samples reviewed, the team determined that the licensees corrective action program (CAP) complied with regulatory requirements and self-imposed standards. The licensees implementation of the corrective action program adequately supported nuclear safety.
Problem Identification: The inspectors determined that the licensee was effective in identifying problems and entering them into the corrective action program and there was a low threshold for entering issues into the corrective action program. This conclusion was based on a review of the requirements for initiating Condition Reports (CRs) as described in licensee procedure NPG-SPP-22.300, Corrective Action Program, and managements expectation that employees were encouraged to initiate condition reports for any reason. Additionally, site management was actively involved in the corrective action program and focused appropriate attention on significant plant issues. Based on reviews and walkdowns of accessible portions of selected systems, the inspectors determined that deficiencies were being identified and placed in the CAP.
Problem Prioritization and Evaluation: Based on the review of CRs sampled by the inspection team during the onsite period, the inspectors concluded that problems were generally prioritized and evaluated in accordance with the CR significance determination guidance in procedure NPG-SPP-22.300. The inspectors determined that in general, adequate consideration was given to system or component operability and associated plant risk. The inspectors determined that plant personnel had conducted root cause and apparent cause analyses in compliance with the licensees CAP procedures and cause determinations were appropriate, and considered the significance of the issues being evaluated. A variety of formal causal-analysis techniques were used to evaluate CRs depending on the type and complexity of the issue consistent with the applicable cause evaluation procedures.
Corrective Actions: Based on a review of corrective action documents, interviews with licensee staff, and verification of completed corrective actions, the inspectors determined that overall, corrective actions were timely, commensurate with the safety significance of the issues, and effective, in that conditions adverse to quality were corrected. For significant conditions adverse to quality, the corrective actions directly addressed the cause and effectively prevented recurrence. The team reviewed performance indicators, CRs, and effectiveness reviews, as applicable, to verify that the significant conditions adverse to quality had not recurred. Effectiveness reviews for corrective actions to prevent recurrence (CAPRs)were sufficient to ensure corrective actions were properly implemented and were effective.
Assessment 71152B Based on the samples reviewed, the team determined that the stations processes for the use of industry and NRC operating experience information and for the performance of audits and self-assessments were effective and complied with all regulatory requirements and licensee standards. The implementation of these programs adequately supported nuclear safety. Overall, the team concluded that operating experience was adequately evaluated for applicability and that appropriate actions were implemented to address lessons learned as needed. In general, the inspectors determined that the licensee was effective at performing self-assessments and audits to identify issues at a low level, properly evaluated those issues, and resolved them commensurate with their safety significance.
Assessment 71152B Based on a sample size of 12 people interviewed from a cross-section of plant employees, as well as a review of condition reports and safety culture survey review, the team found no evidence of challenges to a safety-conscious work environment. Employees interviewed appeared willing to raise nuclear safety concerns through at least one of several means available.
The team reviewed the 2020 Browns Ferry Nuclear Plant Employee Concerns Program Feedback Survey results. Of 342 respondents, 89% responded that they felt free to contact the Employee Concerns Program and 82% responded that they would report an issue or concern to the TVA Ethics or Employee Concerns Program if necessary.
Minor Violation 71152B Minor Violation: 10CFR26.205(d)(3)(iii) states in part that (iii) Individuals who are working 12-hour shift schedules while performing the duties described in § 26.4(a)(1) through (a)(3) shall have at least 2.5 days off per week, averaged over the shift cycle. Contrary to this requirement, during the Spring 2019 outage one Licensed Unit Operator was found to have less than 2.5 days off per week. This was due to the individual incorrectly being placed on an "outage schedule" instead of an "online schedule". An outage schedule permits only one day off per week averaged over the shift cycle.
Screening: The inspectors determined the performance deficiency was minor. This performance deficiency was screened in accordance with Inspection Manual Chapter (IMC)0612 Appendix B, "Additional Screening Guidance," dated January 1, 2020, and was determined to be of minor significance because the failure to meet work hour requirements could not be reasonable viewed as a precursor to a significant event, would not have the potential to lead to a more significant safety concern if left uncorrected, and did not adversely affect a cornerstone objective. Specifically, this violation was a result of a unique staffing challenge during one outage and did not result in any adverse impact to the operation of the Browns Ferry Nuclear Plant.
Enforcement:
The licensee has taken actions to restore compliance under Condition Report 1638399. This failure to comply with 10CFR26 constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On September 17, 2020, the inspectors presented the biennial problem identification and resolution inspection results to Mr. Steven M. Bono and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
1338027, 1420413,
1439517, 1440055,
1446361, 1446381,
1446490, 1448155,
1448229, 1448706,
1449483, 1454252,
1458296, 1458428,
1459513, 1459887,
1461321, 1461612,
1464279, 1469920,
1470821, 1472978,
1475622, 1478349,
1478565, 1480744,
1480847, 1483014,
1485497, 1485501,
1488324, 1490266,
1491888, 1493698,
1494483, 1496991,
1496992, 1499735,
1501541, 1502592,
1510057, 1513132,
22304, 1523272,
25480, 1526205,
26597, 1526999,
1532860, 1535076,
1535806, 1536539,
1537101, 1539981,
1542143, 1545577,
1551628, 1554636,
1555154, 1561790,
1562911, 1565122,
1565969, 1567701,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1572797, 1575519,
1597225, 1603709,
1604736, 1606732,
1613461, 1619684,
1606581, 1597091,
1586526, 1586521,
1586511, 1584709,
1580336, 1570379,
1553492, 1552023,
1548927, 1548094,
1546756, 1541244,
1541037, 1532170,
21190, 1520850,
1518645, 1517630,
1517627, 1517625,
1511614, 1508356,
1499298, 1491946,
1491941, 1491940,
1486322, 1485219,
1478017, 1477311,
1475055, 1474520,
1467336, 1467325,
1464305, 1464303,
1460752, 1454001,
1453491, 1453164,
1452748, 1450856,
1450520, 1449225,
1438388, 1438384,
1438382, 1437895,
1434563, 1429497,
27962, 1423322,
1416743, 1410577,
1394604, 1383682,
1363100, 1354129,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
1352550, 1334534,
294336, 1286467,
252419, 1213567,
1157981, 1140454,
1139620, 1103676,
1094953, 1085977,
2223, 949751,
2409, 921980,
20424, 920418,
890649, 796578,
791685, 727710,
20569, 681667,
573054, 449110,
25949
27051, 1435845,
1436563, 1437476,
1443388, 1497448,
1501007,1511320,
1511475, 1511484,
1512662, 1513320,
23121, 1538409,
1544529, 1545860,
1552023, 1563633,
1582926, 1587546,
1603161, 1613626,
1942600
Corrective Action
Documents
Resulting from
Inspection
1633570
Quality Assurance (QA) Recommendation Condition
Report Resolution Gap Identified
08/27/2020
1634833
Corrective Action Program (CAP) Related Issues
Identified During Problem Identification and Resolution
Documentation Retrieval
09/20/2020
1637714
Problem Identification and Resolution Fatigue Rule
Issue of Concern
09/15/2020
1637750
NRC identified: 3A SLC pump pistons leaking less than
09/16/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
dpm
1638399
20 BFN NRC Problem Identification and Resolution
Inspection Minor Violation (MV) - 10 CFR 26.205
09/17/2020
1638400
20 BFN Problem Identification and Resolution
Observation - Clearance Related CRs
09/17/2020
1638401
20 BFN NRC Problem Identification and Resolution
Observation - CAP Feedback
09/17/2020
Engineering
Evaluations
0-XFA-031-CHCB XFMR Missing Bolts Access Panel
BFN Civil Design Evaluation
03/01/2019
ABB Case 20190301-
951296
ABB Tech Support for Medium Voltage Dry Transformer
03/01/2019
Miscellaneous
FSAR - 3.8 Standby Liquid Control System
TS Units 1, 2, and 3, 3.1 Reactivity Control Systems
General Design Document - BFN - 50-7063-Standby
Liquid Control System
Browns Ferry Nuclear Plant Employee Concerns
Program Feedback Survey
August 2020
E-mail, Jason Eggart (TVA) to Jeff Hamman (NRC)
providing status of Safety Conscious Work Environment
Related Condition Report Actions for the Radiation
Protection Department
08/27/2020
13331416, 1345191,
1345335
Preventive Maintenance Change Request
MCRD Spreadsheet
Excel sheet used to track the online and outage control
room deficiencies
Rev. 0
NPG-SPP-03.12
Technical Specifications/Licenses and Amendments
Rev. 0005
NPG-SPP-03.12
Technical Specifications/Licenses and Amendments
Rev. 0004
Operator Work Arounds List of all operator work arounds from 2018 to 2020
Rev. 0
PIC data
Performance indicator data from operations from Sept
2018 through July 2020. (30 records)
08/25/2020
Procedures
0-TI-346
Plant Health Committee and Plant Health Sub-
Committee
Rev. 0051
NPG-SPP-22.001
Effectiveness Reviews
Rev. 0001
0-TI-346
Maintenance Rule Performance Indicator Monitoring,
Rev. 0052
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Trending, and Reporting - 10CFR50.65
NEDP-22
Operability Determinations and Functional Evaluations
Rev. 0021
NPG-SPP-06.2
Preventive Maintenance
Rev. 0013
NPG-SPP-09.16.1
System, Component and Program Health
Rev. 0014
NPG-SPP-22.000
Performance Improvement Program
Rev. 0009
NPG-SPP-22.207
Procedure Use and Adherence
Rev. 0005
NPG-SPP-22.300
Corrective Action Program
Rev. 0019
NPG-SPP-22.300,
Corrective Action Program
Rev. 0012
NPG-SPP-22.300.1
Corrective Action Program (BFN Only),
Rev. 0002
NPG-SPP-22.300.1
Corrective Action Program (BFN Only)
Rev. 0003
NPG-SPP-22.500
Operating Experience Program
Rev. 0011
NPG-SPP-22.600
Issue Resolution
Rev. 0010
OPDP-8
Operability Determination Process and Limiting
Conditions for Operation Tracking
Rev.0024
Self-
Assessments
TVA BFN Work Management Self-Assessment
08/08/2019
Organizational Effectiveness Assessment
2/19/2019
BFN-OPS-SA-19-012
Self-Assessment for SOER 96-01, Control Room
Supervisors
07/12/2019
BFN-SEC-SA-20-001
NRC Baseline Inspection and QA Assessment
11/01/2019
CRP-OTH-FAS-18-001
Focused Self-Assessment Report
07/13/2018
SSA1808
Fire Protection, Browns Ferry Nuclear Plant (BFN)
08/24/2014
SSA1901
Corrective Action, Chattanooga Office Complex (COC),
Browns Ferry (BFN), Sequoyah (SQN) and Watts Bar
Nuclear Plants
01/18/2019
SSA1903
Security and Safeguard Information (SGI), Browns Ferry
Nuclear Plant (BFN)
01/17/2019
SSA1904
Independent Spent Fuel Storage Installation
Chattanooga Office Complex (COC), Browns Ferry
(BFN), Sequoyah (SQN), and Watts Bar (WBN)
03/28/2019
SSA1905
Site Audit Report Operations
05/17/2019
SSA1907
Radiation Protection Browns Ferry Nuclear Plant (BFN)
07/25/2019
SSA1908
Nuclear Fatigue Rule, Browns Ferry Nuclear Plant
09/12/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
(BFN)
SSA1911
Training & Staffing, Browns Ferry Nuclear Plant (BFN),
2/12/2019
SSA2003
Engineering Design Control, Browns Ferry Nuclear Plant
(BFN)
04/06/2020
SSA2004
Site Audit Report, Maintenance
06/06/2020
Work Orders
20260467,
20283885,
114255193,
20575833,
20575834,
119614171,
21019445,
21020922,
119614170,
119614171,120821075,
20592107,
20483130,
20425287,
20383328,
20383321,
20111701,
20009541,
119847417,
119779384,
119678167,
21294904,
21369978,
21369977,
21369979,
21369976,
21369980, 121369981