MONTHYEARIR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 IR 05000259/20234022023-06-12012 June 2023 Material Control and Accounting Program Inspection Report 05000259 2023402, 05000260 2023402 and 05000296 2023402 IR 05000259/20230912023-05-0808 May 2023 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter; NRC Inspection Report 05000259/2023091 IR 05000259/20230012023-05-0303 May 2023 Integrated Inspection Report 05000259/2023001, 05000260/2023001 and 05000296/2023001 IR 05000259/20234402023-03-23023 March 2023 Special Inspection Supplemental Report 05000259 2023440 and 05000260 2023440 and 05000296 2023440 Cover Letter IR 05000259/20234012023-03-0808 March 2023 Security Baseline Inspection Report 05000259 2023401 and 05000260/2023401 and 05000296/2023401 IR 05000259/20230902023-03-0202 March 2023 NRC Inspection Report 05000259/2023090 and 05000260 2023090 and Preliminary White Finding and Apparent Violation IR 05000259/20220062023-03-0101 March 2023 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022006, 05000260/2022006 and 05000296/2022006 IR 05000259/20220042023-02-0707 February 2023 Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004 IR 05000259/20220032022-11-0909 November 2022 Browns Perry Nuclear Plant - Integrated Inspection Report 05000259/2022003, 05000260/2022003 and 05000296/2022003 IR 05000259/20220122022-09-20020 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000259 2022012, 05000260 2022012 and 05000296 2022012 IR 05000259/20220112022-09-16016 September 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000259/2022011 and 05000260/2022011 and 05000296/2022011 IR 05000259/20224022022-09-0606 September 2022 Security Baseline Inspection Report 05000259/2022402 and 05000260/2022402 and 05000296/2022402 Cover Letter IR 05000259/20220052022-08-30030 August 2022 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022005, 05000260/2022005 and 05000296/2022005 IR 05000259/20220022022-08-0808 August 2022 Integrated Inspection Report 05000259/2022002, 05000260/2022002 and 05000296/2022002 IR 05000259/20224202022-07-19019 July 2022 Security Baseline Inspection Report 05000259/2022420, 05000260/2022420 and 05000296/2022420 ML22181A9562022-06-29029 June 2022 Bf Report 2022-401 Base Public Cover Letter ML22173A1622022-06-21021 June 2022 Replacement Steam Dryer Visual Inspection Results (U3R20) IR 05000259/20220012022-05-12012 May 2022 Integrated Inspection Report 05000259/2022001, 05000260/2022001, 05000296/2022001 and Exercise of Enforcement Discretion IR 05000259/20220102022-03-30030 March 2022 Triennial Fire Protection Inspection Report 05000259/2022010 and 05000260/2022010 and 05000296/2022010 and Apparent Violation IR 05000259/20224012022-03-0808 March 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000259/2022401; 05000260/2022401; 05000296/2022401 IR 05000259/20210062022-03-0202 March 2022 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 (Report No. 05000259/2021006, 05000260/2021006 and 05000296/2021006 IR 05000259/20210042022-01-31031 January 2022 Integrated Inspection Report 05000259/2021004, 05000260/2021004 and 05000296/2021004 IR 05000259/20214032022-01-19019 January 2022 NRC Inspection Report 05000259/2021403, 05000260/2021403 and 05000296/2021403 IR 05000259/20214022022-01-18018 January 2022 Brows Ferry Nuclear Plant - Security Baseline Inspection Report 05000259/2021402 and 05000260/2021402 and 05000296/2021402 IR 05000259/20210032021-11-0909 November 2021 Integrated Inspection Report 05000259/2021003, 05000260/2021003, 05000296/2021003 and 07200052/2021001 IR 05000259/20214012021-08-31031 August 2021 Security Baseline Inspection Report 05000259/2021401 and 05000260/2021401 and 05000296/2021401 IR 05000259/20210112021-08-24024 August 2021 Temporary Instruction 2515/TI-193 Inspection Report 05000259/2021011, 05000260/2021011, and 05000296/2021011 IR 05000259/20210052021-08-23023 August 2021 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2, and 3- Report Nos. 05000259/2021005, 05000260/2021005 and 5000296/2021005 ML21217A2832021-08-0505 August 2021 Resident Integrated Inspection Report 2021-002 IR 05000259/20213012021-07-28028 July 2021 NRC Operator License Examination Report Nos. 05000259/2021301, 05000260/2021301, 05000296/2021301 IR 05000259/20210102021-07-26026 July 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000259/2021010 and 05000260/2021010 and 05000296/2021010 IR 05000259/20204012021-05-26026 May 2021 Security Baseline Inspection Report 05000259/2020401 and 05000260/2020401 and 05000296/2020401(U) IR 05000259/20210012021-04-28028 April 2021 Integrated Inspection Report 05000259/2021001, 05000260/2021001 and 05000296/2021001 IR 05000259/20200062021-03-0303 March 2021 Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020006, 05000260/2020006 and 05000296/2020006 IR 05000259/20200042021-01-28028 January 2021 Integrated Inspection Report 05000259/2020004, 05000260/2020004, 05000296/2020004, 07200052/2020002 and Exercise of Enforcement Discretion IR 05000259/20204022021-01-0808 January 2021 Material Control and Accounting Program Inspection Report 05000259/2020402, 05000260/2020402 and 05000296/2020402 IR 05000259/20200032020-11-10010 November 2020 Integrated Inspection Report 05000259/2020003, 05000260/2020003 and 05000296/2020003 IR 05000254/20200032020-11-0909 November 2020 Integrated Inspection Report 05000254/2020003; 05000265/2020003 and 07200053/2020001 IR 05000259/20200112020-10-26026 October 2020 Biennial Problem Identification and Resolution Inspection Report 05000259/2020011, 05000260/2020011 and 05000296/2020011 IR 05000259/20204042020-09-29029 September 2020 NRC Security Inspection Report 05000259/2020404 and 05000260/2020404 and 05000296/2020404 and Apparent Violation (U) IR 05000259/20200052020-08-18018 August 2020 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020005, 05000260/2020005, and 05000296/2020005 IR 05000259/20200022020-08-0606 August 2020 Brown Ferry Nuclear Plant Integrated Inspection Report 05000259/2020002, 05000260/2020002, 05000296/2020002, and 07200052/2020001 IR 05000259/20200102020-06-19019 June 2020 Triennial Inspection of Evaluation of Changes, Test and Experiments Baseline Inspection Report 0500259/2020010 and 05000260/2020010 and 05000296/2020010 IR 05000259/20200012020-05-0707 May 2020 Integrated Inspection Report 05000259/2020001, 05000260/2020001, and 05000296/2020001 2023-08-29
[Table view] Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
UNITED STATES une 5, 2014
SUBJECT:
BROWNS FERRY NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000259/2014301, 05000260/2014301, AND 05000296/2014301
Dear Mr. Shea:
During the period April 28 - May 1, 2014, the Nuclear Regulatory Commission (NRC)
administered operating tests to employees of your company who had applied for licenses to operate the Browns Ferry Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on May 9, 2014.
All applicants passed both the operating test and written examination. There were no post examination comments. A Simulator Fidelity Report is included in this report as Enclosure 2.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662
Sincerely,
/RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos: 50-259, 50-260, 50-296 License Nos: DPR-33, DPR-52, DPR-68
Enclosures:
1. Report Details 2. Simulator Fidelity Report
REGION II==
Docket No.: 50-259, 50-260, and 50-296 License No.: DPR-33, DPR-52, and DPR-68 Report No.: 05000259/2014301, 05000260/2014301, and 05000296/2014301 Licensee: Tennessee Valley Authority (TVA), LLC Facility: Browns Ferry Nuclear Plant, Units 1, 2, and 3 Location: Athens, AL 35611 Dates: Operating Test - April 28 - May 1, 2014 Written Examination - May 9, 2014 Examiners: Bruno Caballero, Chief Examiner, Senior Operations Engineer David Lanyi, Operations Engineer Gerard Laska, Senior Operations Examiner Joseph Viera, Examiner in training Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS ER 05000259/2014301, 05000260/2014301, 05000296/2014301; operating test April 28 - May 1, 2014 & written exam May 9, 2014; Browns Ferry Nuclear Plant, Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Browns Ferry Nuclear Plant staff developed both the operating tests and the written examination.
The NRC administered the operating tests during the period April 28 - May 1, 2014. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on May 9, 2014. All applicants passed the operating test and/or written examination, as applicable. All applicants were issued licenses commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope The NRC evaluated the submitted operating test by combining the scenario events and Job Performance Measures (JPMs) in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (Reactor Operator (RO) and Senior Reactor Operator (SRO) questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved Knowledge/Ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria in Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the operating tests during the period April 28 - May 1, 2014.
The NRC examiners evaluated five RO applicants and two SRO applicants using the guidelines contained in NUREG-1021. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on May 9, 2014. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Browns Ferry Nuclear Plant, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance or fidelity of the simulation facility during the preparation or conduct of the operating tests.
b. Findings No findings were identified.
Members of the Browns Ferry Nuclear Plant training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials. The NRC determined, using the acceptance criteria in NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
No issues related to examination security were identified during preparation and administration of the examination.
Five RO applicants and two SRO applicants passed both the operating test and written examination. Two SRO applicants, who previously passed an operating test, passed the written examination. Five RO applicants and four SRO applicants were issued licenses.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee did not submit any post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than May 5, 2016, in the ADAMS system (ADAMS Accession Number(s)
ML14141A519 and ML14142A161.
4OA6 Meetings, Including Exit Exit Meeting Summary On May 1, 2014, the NRC examination team discussed generic issues associated with the operating test with Daniel L. Hughes, Senior Operations Manager, and members of the Browns Ferry Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT Licensee personnel Daniel L. Hughes, Senior Manager, Operations Steve Austin, Site Licensing Engineer Eric Bates, Site Licensing Engineer Chris Vaughn, Operations Training Manager Donald C. Binkley, Jr., Operations Initial Training Supervisor Douglas Hakenewerth, Operations Facility Representative NRC personnel None
SIMULATOR FIDELITY REPORT Facility Licensee: Browns Ferry Nuclear Plant Facility Docket No.: 50-259, 50-260, 50-296 Operating Test Administered: April 28 - May 1, 2014 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, examiners observed the following:
Item Description PER 846183 The Unit 3 simulator lighting was darker than the actual Unit 3 control room lighting.
DCR B1529 The LPCI MG Set Removal Modification was not incorporated on the Unit 3 simulator; e.g., simulator annunciator window 9-8C, W24 (480 V RMOV Bd 3B or 3E Transfer) was not applicable to the actual Unit 3 control room.
PER 879775 PIP-02-03 (BFN Electrical Distribution Diagram) was included in both simulators even though the diagram did not reflect the LPCI MG Set Removal modification.
Enclosure 2