Forwards Partially Withheld Insp Repts 50-010/93-02, 50-237/93-19 & 50-249/93-19 on 930607-10
ML20045H405
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/13/1993
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20045H406 List:
References
NUDOCS 9307200177
Download: ML20045H405 (3)


See also: IR 05000010/1993002

Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

bc b /csc6

-

-

Jul.131993

Docket No. 50-10

Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATTN: Mr. L. O. DelGeorge, Vice President

Nuclear Oversight and

Regulatory Services

Executive Towers West III

1400 Opus Place, Suite 300

Downers Grove, IL 60515

Dear Mr. DelGeorge:

SUBJECT:

DRESDEN PHYSICAL SECURITY INSPECTION AND NOTICE OF VIOLATION

This refers to the inspection conducted by Mr. T. J. Madeda of this office on

l

June 7-10, 1993.

The inspection included a review of activities authorized

l

for your Dresden Nuclear Power Station, Units 1, 2, and 3.

At the conclusion

of the inspection, the findings were discussed with those members cf your

staff identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

This violation had minimal safeguards consequences and, subsequent to our

discussion with Mr. Saunders of your staff on June 22, 1993, we considered

applying enforcement discretion in this case. We concluded that it was not

warranted because specific training regarding this barrier and the

implementing procedure did not specifically prohibit this violation.

Recent

program changes placed reliance on training and procedures.

Although Section 2.201 provides for a written statement of explanation to this

of fice within 20 days of your receipt of this Notice, we note that this

violation had been corrected and those actions, including your root cause

analysis, were reviewed during this inspection.

Therefore, no response with

respect to this matter is required.

Encipe wa Cu.t.aina

-

-

.

... . ..

SAFMilLRDS Ih70RETION

./

.w,.

. ~-

Upm Soparation Th.ie

9307200177 930713

T'.o Is De ntrolled

PDR

ADOCK 05000010

11

G

ppg

(

__

J_ d - 1

___- -___

_ _ _

. _ _ _

.

t

.

.

b

1

5

.ji 1 ' B93

Commonwealth Edison Company

2

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the

material will not be placed in the Public Document Room.

Sincerely,

Original Singed By

William Snell

Bruce L. Jorgensen, Acting Chief

Reactor Support Programs Branch

Enclosures:

1.

Notice of Violation

2.

Inspection Reports

-

No. 50-10/93002(DRSS);

No. 50-237/93019(DRSS);

No. 50-249/93019(DRSS)

t

SAFEGUARDS INFORMATION

See Attached Distribution

,

!

!

7l

,

RIII

RII

$

RIII

RIII

4V

)

wW

Pd

i

Hiland

Madeda/dg

ecd

ofglensen

7/13{1 3

07/)l93

lY 0 Ddgl

t)l))

Enolpeuru contains

SAFBGUARDS INTOEMATION-

Upon Soparation This

hga In Decontrolled

,

i

l

____

.

__

_

,

'

,

. , .

1

JUL 131993

-

,

Commonwealth Edison Company

3

Distribution

,

cc w/ enclosures:

M. D. Lyster, Site Vice President

C. Schroeder, Station Manager

J. Shields, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory

Services Manager

NRR/DRIS/RSGB9D

NMSS/HIGDON/4E4

OE Director

,

.

cc w/ enclosures, w/o

SAFEGUARDS INFORMATION:

OC/LFDCB

Resident Inspectors LaSalle,

Dresden, Quad Cities

Richard Hubbard

,

J. W. McCaffrey, Chief, Public

'

Utilities Division

Robert Newmann, Office of Public

Counsel

Licensing Project Manager, NRR

State Liaison Officer

Chairman, Illinois Commerce

Commission

H. J. Miller, RIII

T. O. Martin, RIII

J. E. Dyer, NRR

M. L. Jordan, RIII

C. D. Pederson, RIII

'

S. Stasek, SRI, Davis-Besse

,

bcc w/ enclosures, w/o

SAFEGUARDS INFORMATION:

!

D. Funk, RIII

PUBLIC

,

1

Enclamtvo Contains

SAFMUARDS INFORXATION

'

Upon Separation This

Page Is Deoontrolled

,