Forwards Insp Repts 50-237/99-12 & 50-249/99-12 on 990625-0812.Violations Noted:Nrc Determined That Violation Warranted for Failure to Follow Work Instructions That Caused Isolation,Violations Being Treated as non-cited
ML17191B442
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/10/1999
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML17191B443 List:
References
50-237-99-12, 50-249-99-12, NUDOCS 9909170043
Download: ML17191B442 (3)


See also: IR 05000237/1999012

Text

'*

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West Ill

1400 Opus Place, Suite 500

Downers Grove, IL 60515

September 10, 1999

SUBJECT:

DRESDEN INSPECTION REPORT 50-237/99012(DRP); 50-249/99012(DRP)

. '

Dear Mr. Kingsley:

On June 25 through August 12, 1999, the NRC performed an inspection at your Dresden

Nuclear Power Station. The enclosed report presents the results of this inspection.

During the inspection period, the conduct of activities at the Dresden facility was generally

characterized by safety-conscious operations, engineering and maintenance practices, and

careful radiological work controls .

Equipment failures continued to challenge smooth full-power operations. The station had to

enter unplanned shutdown limiting conditions for operation due to degraded or failed

equipment. The station had to perform single recirculation loop operations and enter the

drywell while the reactor was still critical to perform repairs on the isolation condenser.

Although the repair efforts for the isolation condenser were well orchestrated, your subsequent

investigation into the failure of the isolation condenser showed that the failure was related to

inadequate maintenance performed during the refueling outage. The NRC has also determined

that a violation is warranted for the failure to follow work instructions that caused the isolation

condenser to become inoperable. This violation is being treated as a Non-Cited Violation,

consistent with Appendix C of the Enforcement Policy.

The inspectors reviewed six older licensee event reports during this inspection period. Based

on the results of these reviews, the NRC has determined that two additional violations of NRC

requirements occurred. These violations are being treated as Non-Cited Violations, consistent

with Appendix C of the Enforcement Policy and are described in the subjeCt inspection report.

However, the two violations resulting from the review of the six older licensee reports are not

described iri the Executive Summary and will not be entered into the Plant Issues Matrix

because they are greater than 2 years old.

If you contest the violations or severity level of these Non-Cited Violations, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to

the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.

20555-0001, with copies to the Regional Administrator, Region Ill, and the Director, Office of

Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001.

9909170043 990910

PDR

ADOCK 05000237

G

PDR

. .

0. Kingsley.

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

Document Room.

Sincerely,

Mark A. Ring, Chief

Reactor Projects Branch 1

Docket Nos. 50-237; 50-249

license Nos. DPR-19; DPR-25

Enclosure:

Inspection Report 50~~37/99012(DRP);

50-249/99012(DRP)

cc w/encl:

O. Helwig, Senior Vice Pr~sident, Nuclear Services

C. Crane, Senior Vice President, Nuclear Operations

H. Stanley; Vice President, Nuclear Operations

R. Krich, Vice President, Regulatory Services

DCD - licensing

  • M. Heffley, Site Vice Presidem

P. Swafford, Station Manager

  • D. Ambler, RegulatoryAssurance Manager

M. Aguilar, Assistant Attorney General

State liaison Officer

.

Chairman, Illinois Commerce Commission *

DOCUMENT NAME: G:\\Dres\\dre99012 drp.wpd

To receive a coc v of this document, Indicate In the box *c* ~ Coov w/o attach/encl *e* = Copy w/attach/encl ~N* = No coov

OFFICE

Rlll:DRP

1,J Rlll:DRP

I~

I

NAME

Rlerch/co /1t *IL/

MRinaL~

DATE

09//0/99

09/lc/99

OFFICIAL RECORD COPY

I

0. Kingsley

  • Distribution:

AJM (E-Mail)

RPC (E-Mail)

LWR (Project Mgr.) (E-Mail)

J. Caldwell, Rill w/encl

B. Clayton, Rill w/encl

SRI Dresden w/encl

DRP w/encl

DRS w/encl

  • Rill PRR w/encl

PUBLIC IE-01 w/encl

Docket File w/encl

GREENS'

IEO (E-Mail)

DOCDESK (E-Mail)

-3-