ML17191A933
| ML17191A933 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Byron, Braidwood, Quad Cities, LaSalle |
| Issue date: | 10/13/1998 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 9810230151 | |
| Download: ML17191A933 (5) | |
Text
.. -
UNITED STATES A
~UCLEAR REGULATORY COMMISSIO~
. REGION Ill Mr. Oliver D.* Kingsley President, Nuclear Generation Group Commonwealth Edison Company A TIN.: Regulatory Services Executive Towers West Ill 1400 Opus Place, Suite 5'00 Downers Grove, IL 60515.
801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 October 13, 1998
SUBJECT:
- STATUS MEETING ON THE PERFORMANCE OF COMMONWEALTH EDISON COMPANY'S NUCLEAR GENERATION GROUP.
Dear Mr. Kingsley:
This refers t~ the meeting conducted at the NRC Region Ill Office in Lisle, Illinois, on September 14, 1998. The purpose of this meeting was to discuss Commonwealth Edison Company (ComEd) Nuclear Generation. Group's (NGG's) performance as it relates to actions ComEd has* taken in response to the NRC's 10 CFR 50.54(f) letter, dated January 27, 1997, regarding safety performance at ComEd's nuclear facilities. Attendees at the meeting are listed in En<?losure 1. Enclosure 2 is a copy of ComEd's presentation materials.
The ComEd presentation included the status of the Strategic Reform Initiatives (SRls) NGG-2, "Upgrade Operations Leadership Role in Ensuring Excellence," and NGG-3, "Ensure Excellence in Plant Material Condition." ComEd concluded that the SRls are addressing real plant issues, the SRI action plans are supplemented as required to address lessons learned, the SR ls are long-term govemir.g principles for the NGG, and achieving SRI objectives is a continuing goal.
I The NRC discussed the benchmarking inspection conducted at the ComEd corporate office to verify whether ComEd is meeting its SRI implementation target dates identified in its February 17, 1998, submittal. Enclosure 3 is a copy of the NRC report. Deviations were identified regarding the initial implementation of the program, where ComEd was slow to complete early commitments. Since that time, ComEd appeared to be meeting established target dates. In the future, ComEd wilLnotify the NRC in writing when SRI action item packages are ready for NRC review.
ComEd will provide its performance indicators to the NRC on a monthly basis and will.also discuss how it uses the performance indicators at the next status meeting.
The next status meeting will be conducted on November 17, 1998, at 1 :00 p.m. A subsequent status me~ting will be scheduled during the week of January 4, 1999.
In accordance with Section 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure~ will be placed in the NRC's Public Document Room.
9a102ao1s1 981013
~DR ADO~K 05000237 PDR
-* J
- o. Kingsley If you have any questions regarding this meeting or if our understanding of actions ComEd is taking, as discussed above, differs from yours, please contact me at (630) 829-9657.
Sincerely, G. E. Grant for James L Caldwell Acting Regional Administrator Docket Nos.:
50-4~; 50-467; _5Q-4~;
50-485; 50-231( 50-2~9; 50-37.3; 50-314; 50-2~;
50-265
Enclosures:
- 1.
Attendance List Licensee Presentation
- 2.
- 3.
Corporate Benchmarking Inspection See Attached Distribution DOCUMENT NAME: G:\\COMED\\COM9148.WPD To receive a co of this document indicate in the box "C"
- OFFICE Riii f_
Riii NAME DATE 10/i /98 10/ Cf /98 OFFICIAL RECORD COPY
£ 1e 1~D)'\\
f<c~
&-* o~d'-*
Riii JCald 10/\\~ I
ATTENDANCE AT THE SEPTEMBER 14, 1998 MEETING BETWEEN THE NRC AND COMED COMED ATTENDEES
- 0. Kingsley, Jr.
D. Helwig S. Perry H. Stanley T. Tulon K. Graesser J. Dimmette, Jr.
F. Dacimo D. Sager V. Brown J.Benjamin R. Krich W. BohJke D. Jenkins S. Clark J. Lewand K.Kociuba T. Broccolo J. Giuffre M. Riegel T. Schuster B. Levis D. Winchester K. Giadrosich B. Ritter D. Smith D. Eisenhut D. Chrzanowski D. Green T. O'Connor P. Swafford D. Farr S. Barrett R. Wegner T. Gierich G. Schwartz M. Stevens President and Chief Nuclear Officer Senior Vice President BWR Vice President PWR Vice President Braidwood Site Vice President Byron Site Vice President Quad Cities Site Vice President LaSalle Site Vice President Vice President, Generation Support Vice President, Nuclear Human Resources Vice President, Nuclear Oversight Vice President, Regulatory Services Vice President, Engineering Senior Counsel PWR/BWR Vice President Executive Assistant Licensing Administrator Executive Assistant - 0. Kingsley Independent Assessment Manager - Nuclear Oversight Maintenance Lead Assessor Braidwood Nuclear Oversight Manager Byron Nuclear Oversight Manager Byron Station Manager Dresden Nuclear Oversight Manager Quad Cities Nuclear Oversight Manager LaSalle Nuclear Communications NSRB Chairman Nuclear Licensing Nuclear Licensing LaSalle Station Manger Dresden Station Manager LaSalle Operations Manager Dresden Operations Manager Braidwood Operations Manager Byron Operations Manager Braidwood Station Manager Quad Cities Maintenance Manager
_\\.
NRC ATTENDEES J. Caldwell E. Adensam S. Richards G. Grant S. Reynolds M. Ring P. Pelke M. Jordan G. Dick M. Parker D. Hills R. Lanksbury OTHER ATTENDEES A. Settles H. Moate Acting Regional Administrator Acting Director, Division of Reactor Projects, NRR Director, Project Directorate 111-2, NRA Director, Division of Reactor Projects (DRP), Region Ill Deputy Director, Division of Reactor Safety, Region Ill Chief, Projects Branch 1, DRP, Region Ill Reactor Engineer, Projects Branch 5, DRP, Region Ill Chief, Projects Branch 3, DRP, Region Ill Licensing* Project Manager, NRR SRA, DRP, Region 111 Acting Chief, Projects Branch 2, DRP, Region 111
- Chief, Projects Branch 5, DRP, Region Ill Division Chief, Illinois Department of Nuclear Safety Bechtel Project Engineer 2
I
.:_Jt,
- 0. Kingsley
- Distribution:
J. Callan, EDO w/encls H. Thompson, DEDR w/encls T. Hiltz, OEDO w/encls S. Collins, NRR w/encls F. Miraglia, NRR w/encls
- 8. Boger, NRRw/encls T. Martin, NRR w/encls
- E. Adensam, NRR w/encls PM, NRR w/enCls G. Dick, NRR w/o encls L. Gerke, OCA w/encls J. Caldwell, Riil w/o encls C. Pederson, Riii w/encls J. Grobe, Riii w/o encls M. Ring, Riii w/o encls M. Jordan, Riii w/o encls B. Clayton, Riii w/encls
- R. Lanksbury, Riii w/o encl~
(
Docket F~*1es /encls
-< * \\ ~ ":)
PUBLIC 1 w/encls
~
"'\\
TSS, Riii /o ehcls DRP, Riii w/o encls Riii PRR w/encls SRI LaSalle, Dresden, Quad Cities,
- Braidwood, Byron w/o encls DRS (2) w/o encls Greens w/o encls.
23CC05