Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08
[Table view] Category:NRC TO U.S. CONGRESS
MONTHYEARML20059N6551990-09-12012 September 1990 Forwards Responses to H Myers Requests of 900719,0806,13 & 16 Re Seabrook Welds ML20059F5091990-08-17017 August 1990 Forwards Responses to H Myers 900716 Requests Re Pipe Welding Problems.Confidentiality of NRC Alleger Requested Through Restricting Access & Use to Members & Staff of Committee ML20059F4101990-08-0808 August 1990 Forwards Responses to H Myers 900713 Request Re Pipe Weld Repair ML20059F1001990-08-0202 August 1990 Forwards Responses to H Myers 900607 & 0706 Requests Re Plant Welds ML20058N4881990-07-16016 July 1990 Forwards Response to H Myers 900625 & 0703 Requests Re Plant Welds ML20058N5091990-07-16016 July 1990 Forwards Responses to H Myers 900614,19 & 26 Requests Re Plant Welds ML20058N7341990-07-0505 July 1990 Forwards Responses to H Myers 900614 & 19 Requests Re Plant Welds ML20055D0361990-06-29029 June 1990 Forwards Responses to H Myers 900607 & 08 Requests Re Plant welds.Pullman-Higgins Initiated Secondary Review of Radiographs in Response to Insp Rept 50-443/82-06 ML20055D0431990-06-26026 June 1990 Forwards Response to H Myers 900601 Request for Info Re Welds.Nrc Review of Pipe Welding & NDE Issues Did Not Specifically Address Deficiency Repts 469 & 497.Rept, Documenting NRC Review,Scheduled for Issuance in Jul 1990 ML20055D0591990-06-21021 June 1990 Forwards Response to H Meyers 900522,29 & 0606 Requests Re Plant Welds.Allegations That Deficiencies Exist Re Radiographic Record of Cooling Tower Piping Welds Unsubstantiated ML20055D0701990-06-18018 June 1990 Forwards Response to Containing a Robinson & L Bruner Comments on Facility,Including Availability of INPO Safety Repts & Unsafe & Unsatisfactory Emergency Plan ML20055D0751990-06-13013 June 1990 Responds to 900601 Request for Meeting W/Nrc During Wk of 900618 Re Plant Weld Program.Suggests Meeting Following Completion of Insp Team Insp/Assessment Rept Targeted for Issuance in Early Jul ML20055C6661990-05-23023 May 1990 Forwards Documents Re Facility QA Procedures During 1982 Through 1985 Concerning plant.W/41 Proprietary Oversize Encls.Encls Withheld ML20055C5921990-05-18018 May 1990 Forwards Responses to Requesting Details on NRC Handling of INPO Repts Re Plant.Evaluations of Plant by INPO & NRC Generally Compatible & Complementary Assessments of Plant ML20246B6591989-08-18018 August 1989 Forwards 40th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants from Apr-June 1989. Lilco Shareholders Voted to Accept Terms That Provide for Sale of Plant to State of Ny ML20246E1941989-07-0707 July 1989 Responds to ,On Behalf of Constituent,Re Concerns W/Plant Startup.No Decision Made on Full Power License as Reviews & Hearing Process Incomplete ML20247C0111989-05-12012 May 1989 Forwards NRC Quarterly Status Rept to Congress Covering First Quarter 1989.On 890303,NRC Dismissed Shoreham Intervenors from Licensing Proceeding for Misconduct During Proceeding.W/O Encl ML20247C2081989-05-12012 May 1989 Responds to 890508 Questions Re Status of TMI Action Plan Requirements at Plant.Nrc Determined That Operation of Control Room,W/O Mods to Control Room Ventilation Sys, Adequate for Operation Up to 5% Rated Power ML20246L3271989-05-0404 May 1989 Forwards Questions & Answers Re Status of TMI Action Plan Requirements at Plant,Per 890323 Request ML20236D4761989-03-0909 March 1989 Forwards NRC 38th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1988 ML20195G8521988-11-10010 November 1988 Forwards Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Jul-Sept 1988.Inability of Commission to Forecast Licensing Schedule for Shoreham & Seabrook Noted ML20154P3891988-09-28028 September 1988 Responds to Re Concern Over Adequacy of Evacuation Plan Prepared by Util for Plant.Public Hearing Will Be Held to Adjudicate Admitted Contentions Raised by Parties to Litigation Re Plant Graded Exercise ML20154P8561988-09-19019 September 1988 Responds to to Chairman Zech Re Concern Over Adequacy of Facility Evacuation Plan.Nrc Determination of Adequacy of Facility Offsite Plans & Preparedness Will Include Review of FEMA Findings & Graded Exercise ML20245D6391988-09-12012 September 1988 Forwards Response to Mavroules Questions Re Adequacy of Plant Emergency Plan ML20245D5811988-08-22022 August 1988 Forwards 36th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants Covering Apr-June 1988.Licensing Schedule Cannot Be Realistically Forecast Due to Unresolved Emergency Preparedness Issues ML20245D5281988-07-19019 July 1988 Forwards Commission Responses to Questions Submitted by Congressman Mavroules for Record of 880426 Hearing,Per ML20150D3141988-07-0101 July 1988 Responds to Urging NRC to Delay Seabrook Low Power Operation Until Emergency Planning & Financial Qualification Issues Resolved ML20195E4971988-06-14014 June 1988 Responds to Re Use of Carbon Steel Piping at Plant.Nrc Examining Addl Documentation at Suppliers & Issued NRC Bulletin 88-005 Alerting of Problems W/Matls. Investigation of Falsified Test Reports Being Conducted ML20154N3871988-05-24024 May 1988 Responds to Recipient Re Proposed Change to Proposed Rule 10CFR50 Re Emergency Planning Requirements for Fuel Loading & Initial Low Power Operations.Served on 880525 ML20154M9011988-05-24024 May 1988 Responds to Recipient Re Proposed Rule 10CFR50 Changes Re Emergency Planning Requirements for Fuel Loading & Initial Low Power Operations.Comment Period Extended 15 Days.Served on 880525 ML20154J9341988-05-19019 May 1988 Responds to Forwarding W Steele Expressing Frustration at Inability to Obtain Info Re Specific Date for Public Hearing to Render Decision on Licensing of Plant.Hearings Re State of Nh Issues Underway ML20151W5611988-04-25025 April 1988 Responds to Requesting Investigation of Drug & alcohol-related Matters at Plant.Nrc Expects Licensees to Have Vigorous fitness-for-duty Program & to Strive for Drug Free Work Site ML20196G6371988-03-0202 March 1988 Responds to & Investigative Rept on Drug & Alcohol Abuse at Plant.Commission Believes That Existing fitness-for-duty Programs Are as Effective as Those Which Would Have Been Established by Earlier Proposal.Rept Encl ML20196G9691988-02-29029 February 1988 Forwards 34th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1987. Commission Unable to Forecast Licensing Schedule for Shoreham & Seabrook Because of Unresolved Issues ML20148E0961988-02-29029 February 1988 Forwards Quarterly Rept Covering Fourth Quarter of 1987,in Response to House Rept 97-850 ML20149M0861988-02-19019 February 1988 Responds to Comments in to Zech Re Emergency Evacuation Plans for Plant.Zech Responding Separately to Proposal Re Legislation to Prevent Future Controversies Over Emergency Planning for Nuclear Plants ML20149M5181988-02-11011 February 1988 Responds to Urging Commission to Reinstate NRC Stay on Issuance of License for Low Power Operations at Facility in Light of Voluntary Bankruptcy Filing by Util. Status of Proceeding Discussed ML20195J0871988-01-20020 January 1988 Ack Receipt of Mm Murphy as Forwarded by Rc Smith & Advises That Concerns Set Out in Ltr Subj of Extensive Testimony to ASLB on 871020.Ltr Will Be Made Matter of Public Record.Served on 880120 ML20237F1531987-12-11011 December 1987 Responds to Urging That Commission Not Grant License for Low Power Testing at Plant.Commission Primary Consideration Will Be Protecting Public Health & Safety ML20238C4191987-12-11011 December 1987 Responds to Re Reaffirmed Opposition to Granting of Low Power License for Up to 5% Operation at Plant.Ltr Will Be Served on Parties of Commission Adjudicatory Proceeding ML20236W2711987-12-0202 December 1987 Responds to Expressing View on Commission Decision to Issue License for Low Power Testing at Plant. Commission Decision Will Be Rendered on Formal Record of Plant Proceeding ML20236X0551987-12-0202 December 1987 Responds to Re NRC Issuing Low Power Testing License for Plant.Nrc Decision Will Be Based on Consideration of Public Health & Safety Rendered on Format Record of Plant Proceeding ML20236V0111987-12-0101 December 1987 Responds to Urging Commission to Defer Granting Low Power License to Plant Until FEMA Determines That Adequate & Workable Evacuation Plans in Place ML20236U9831987-12-0101 December 1987 Responds to Urging NRC Not to Approve OL for Plant Until Matter of State & Local Govt Participation in Emergency Planning Can Be Addressed.Served on 871202 ML20236U9941987-12-0101 December 1987 Responds to Urging Commission to Defer Granting of Low Power License to Plant Until FEMA Determined That Adequate & Workable Evacuation Plans in Place.Served on 871202 ML20236V0031987-12-0101 December 1987 Responds to Urging Commission to Defer Granting Low Power License for Plant Until FEMA Determines That Adequate & Workable Evacuation Plans in Place ML20236V0191987-12-0101 December 1987 Responds to Urging Commission to Defer Granting Low Power License to Plant Until FEMA Determines That Adequate & Workable Evacuation Plans in Place ML20236T2121987-11-24024 November 1987 Responds to Recipient Urging Commission to Deny License for Low Power Testing Until Certain Critical Issues Resolved.Issue Raised Before Commission in Adjudicatory Proceeding ML20236K8821987-11-0303 November 1987 Responds to Recipient Expressing Concerns Re Public Feelings of Exclusion from Plant Hearing Process & Effectiveness of Util Offsite Emergency Plans ML20236L1721987-11-0202 November 1987 Responds to Re Ta Pelosi Request That NRC Address Concerns of City Council of Haverhill,Ma Re Feasibility of Developing & Implementing Evacuation Plan for Area Impacted by Facility.Nrc Primarily Responsible for Onsite Plan 1990-09-12
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20207B2221999-05-20020 May 1999 Forwards Insp Rept 50-443/99-03 on 990308-0408.Violations Identified & Being Treated as non-cited Violations ML20206K1811999-05-0707 May 1999 Responds to Re Event Notification from North Atlantic Energy Service Co Indicating That One of Seabrook Two EDG May Have Been Inoperable Since June 1997. NRC Insp of Problem Not Yet Completed ML20206N6811999-04-23023 April 1999 Ack Receipt of ,Re Potential Inoperability of Two Emergency Diesel Generators Since June 1997 at Seabrook Nuclear Power Station.Issue Under Ongoing Insp & Review by NRC ML20205R1171999-04-20020 April 1999 Ack Receipt of Ltr Requesting Action Under 10CFR2.206 Re Enforcement Action Against Individuals Alleged to Have Unlawfully Discriminated Against Contract Electrician. Request to Attend Enforcement Conference Denied.Frn Encl ML20206B3451999-04-20020 April 1999 Forwards Insp Rept 50-443/99-01 on 990207-0321.Violations Identified Involving Failure to Properly Test Primary Auxiliary Building for Test Failures & Inadequate C/A to Prevent Recurrence of Repeated Pab for Test Failures ML20205P1871999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review ML20205N4991999-04-0808 April 1999 Responds to Requesting Copy of OI Rept 1-1998-005,or in Alternative Summary of Investigation Rept. Request for Copy of Investigation Rept,Denied at This Time, Because NRC Did Not Make Final Enforcement Decision ML20205C1891999-03-24024 March 1999 Refers to Naesco 981030 Request for Approval of Alternative Inservice Exam to That Specified by ASME BPV Code,Section XI,1983 edition/1983 Summer Addenda.Forwards SE Supporting Proposed Relief Request IR-8,Rev 1 ML20204E4191999-03-16016 March 1999 Informs of Results of Investigation Conducted at Seabrook Nuclear Generating Station by NRC OI & Requests Participation at Predecisional Enforcement Conference in King of Prussia,Pa Relative to Investigation 1-98-005 ML20204F3101999-03-16016 March 1999 Discusses Investigation Conducted at Plant by OI Field Ofc, Region 1.Purpose of Investigation to Determine Whether Certain Activities Conducted Per NRC Requirements.Synopsis of IO Investigation Rept 1-98-005 Encl ML20210U2281999-03-16016 March 1999 Refers to Apparent Violation of NRC Requirements Prohibiting Deliberate Misconduct by Individuals & Discrimination by Employers Against Employees Who Engage in Protected Activities,Investigation Rept 1-98-005 ML20207C2991999-02-26026 February 1999 Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As ML20203A2811999-01-28028 January 1999 Forwards Insp Rept 50-443/98-10 on 981115-1227.No Violations Noted.Operators Performed Well During Two Reactor start-ups & Response to Plant Trip on December 22.Radioactive Waste Mgt Program Properly Implemented ML20198Q7391998-12-21021 December 1998 Informs That Review of Licensee Response to GL 97-05, SG Tube Insp Techniques, Did Not Identify Any Concerns with SG Insp Techniques Employed at Seabrook That Would Indicate That Naesco Not in Compliance with Licensing Basis ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) ML20198D1341998-12-16016 December 1998 Forwrds Ltr from J Bean Transmitting Final Exercise Rept for 981020,MS-1,out of Sequence Drill for Elliot Hosp in Manchester,Nh.Assistance Being Requested to Offsite Officials to Address & Resolve Identified Arca Timely ML20198C1131998-12-11011 December 1998 Forwards Insp Rept 50-443/98-09 on 981004-1114 & Notice of Violation.Nrc Identified That Safety Equipment Removed from Service at Beginning of Forced Outage Without Appropriate Monitoring of Status of Equipment as Required ML20197K1931998-12-0909 December 1998 Forwards RAI Re Utilities Participation in WOG Response to GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. Response Requested within 90 Days of Submittal Date 1999-09-30
[Table view] |
Text
_ _ _
[
kI ,
/ h usi.g'g UNITsD sTATss
[ .'- '
fj NUCLEAR REGULATORY COMMISSION t ; ;,/ t WASHINGT*N, D C. 20666 !
y f.g e[
July 16,1990 i
L The Honorable Morris K. Udall, Chairman Committee on Interior and Insular Affairs United States House nf Representatives Washington, DC 205H
Dear Mr. Chairman:
Enclosed, at the request of Dr. Henry Myers of your staff, are responses to his request of June 14, 19, and 26, 1990, concerning Seabrook welds.
Sincetely, .
/< -
f
./
i ll Dennis K. Rdhbun, Director Congressional Affairs Office of Governmental and Public Affairs inclost.res:
As Stated cc The Honorable Don Young FULLTErr ASCllSCAN 0$Y l
9003140173 900716 DR ADOCK0500gg3
ATTACHMENT RESPONSE TO OR. H. MYERS' RE0 VEST OF JUNE 14,19, AND 26,1990 Request 1 (entire request of June 14,1990):
(para >hrased) A listin with Pullman-Higgins (gsign-ott P-H) of several datesreactor and alsocoolant (RC) system with nonconformance welds, correlate report (NCR) numbers and NCR issuance dates, has been provided. The following three questions apply to this listing:
- 1. Will the ongoing NRC inspection make a comparison, which is similar to I that leading to the foregoing list, based on a review of other welds in the RC system and other safety-related piping systems such as the Safety injection System? If not, why not?
- 2. Which of the foregoing NCRs resulted from YALC reviews? To the extent r these NCRs resulted from YAEC reviews, what YAtc deficiency reports or other records document such YAEC findings?
- 3. Will the ongoing NRC inspection review the foregoing NCRs to assess, with respect to deficiencies leading to these NCRs, the adequacy of determina-tions of root cause, the adequacy of determinations of generic applicabil-ity and the adequacy of corrective action? If not, why not? ;
Response
! Response to questions 1 and 3 above have been provided separately.
With regard to question 2, NRC review of the nonconformance reports listed above '
reveals no evidence that any of these NCRs resulted from YAEC reviews. One NCR i
(No. 8006) was initiated as a result of a review of a field weld package by the
( Authorized Nuclear Inspector (ANI). However, the remainder of the NCRs appear j
tohavebeeninitiatedasaresultofPullman-Higgins(P-H)identificationof the documented nonconforming conditions.
l Two of the above NCRs (Nos. 6109&6509) were voided after internal P-H review.
The remainder of the NCRs appear to represent problems identified during the P-H records review process. This impression is substantiated by the documented oescription of each nonconformance, and by the tact that fifteen of the above NLRs were initiated by the P-H QA Records Supervisor. The others were initi-ated by other P-H personnel, but pertain to discrepancies similar to the ones identified by the Records Supervisor. Also, all of the listed NCRs were initi-ated in 1984, prior to the major turnover et QA records to YAEC for review. A general discussion of the program for records review and document control rela-tive to the P-H welding /NDE processes and N-5 program is documented in NRC in-spectionreport(IR) 50-443/90-0/, a copy of which has already been provided.
l l
s !
it appears that, with the exception of the one AN1-identified process sheet discrepancy, the remainder of the problems identified on the NCRs listed above i were found and addressed by the Pullman-Higgins QA/QC program.
P l
3 Request 2 (questions 1. 2 & 3 of June 19,1990):
- 1. (paraphrased) In my May 29 memorandum I requested that i be provided the procedures that, prior to implementation of Procedure #5 in May 1984, governed the YAEC 100% radiograph review. The May 29 request encompassed procedures that mandated the review.
Whether or not a specific procedure governed the YAEC 100% review prior to May 1984, I assume the ongoing NRC inspection will provide information:
(Several questions tollow)
Response
Response to questions la through if and 2 have been provided separately.
Questions lg & 3 19 A statement as to the approximate date on which the NRC learned of the TALC 100% review and a discussion as to whether and during what time period the NRC assessed the adequacy of this review.
- 3. As of this date, I am unable to locate an NRC document, issued prior to IR 90-80 on February 7,1990, which refers to a YAEC 1001 review.
It the NRC staff knows of any such reference, please provide it to me prior to COB, Friday, June 22.
Response
NRC Region I was aware in December 1983 of the licensee's intent to review 100% of the radiographs transmitted to the document control vault as qual-ity records. This date is based upon documentation in a January 4,1984 Region I memorandum (previously provided) documenting NPC awareness of the YAEC 1001 radiographic review and upon reference in the resident inspector SALP office files to Deficiency Report (DK) 527 issued pn December 7 1983 with the supporting "YAEC RT INTERPRETATION" listing. Itispossible that the NRC knew betore Deceder 1983 that YAEC was reviewing all film as it was received. However, we have not found any record of NRC cognizance of the 100% review prior to December 1983.
An NRC assessment of the adequacy of the YAEC review program was performed curingtheSystematicAssessmentofLicenseePerformance(SALP) conducted for piping systems and supports on February 14, 1984. This is documented in the fina) SALP report issued on May 17, 1984 as a YAEC " customer re-view" of ASME final code accepted radiographic film. Furthermore, the NRC Lonstruction Appraisal Team (CAT) inspection conducted over the period I
April 23 - May 25,198a reviewed several radiographic film packages, the CAT inspection report, 50-443/84-07, issued on July 18, 1984 documents the following:
"No significant problems were ioentified involving film that was re-viewed by the 6pp11 cant's NDE organization. However, several irregu-larities were icentified involving film that had not Lyet] been re-
- viewed by the applicant."
If the film in which the irregularities were identified by the CAT inspec-tors had been accepted final radiographs, enforcement actions would have been pursued. Instead, the CAT recognized that the licensee's program required the noted YAEC review of all safety-related vendor and site gene-rated radiographs. In documenting the ditterence between the radiographic film which had been reviewed by the applicant and that which had not, the CAT inspectors specifically high11gnted the fact that the radiographic review process would have represented a regulatt?y concern had it not been for the applicant's review process. Hence, this area of inspection was not listed as one where eitier potential enforcement actions or signifi-cant weaknesses were identified. Such inspection logic and the resulting tindings and conclusions represent an additional NRC assessment of the adequacy of the YAEC 100% radiographic review program.
Additional documentation of an NRC assessment of the YAEC radiographic review process can be found in other NRC inspection reports (irs). As an example, IR 50-443/83-19 for inspection conducted f rom November 28 -
December 1, 1983 included a review c' the reactor pressure vessel (RPV) safe end radiographs. The NRC inspector reviewed radiographs that had been rejected by YAEC despite a differing position tendered by Westinghouse as the RPV supplier, and the NRC concurred with the YAEC findings. Other component radiographs were also reviewed, resulting in additional assess-ment of the quality of tile YAEC review. An example is IR 50-443/85 31 tor an inspection conducted from October - December 1986. Documented in this AR is the statement tnat:
"lo date, the licensee has perforined an overview of virtually all vendor suppliec radiographic film. Where problems were found, such as geometric unsharpness failing to meet the ASME code, radiography was re-performed on site and repairs were made, it necessary W inspector reviewed a sample of film during this inspection, which also provided a measure of the NRC assessment of the YAEC radiographic review program.
OtherNRCinspections(e.g.,IR 50-443/85-19 conducted in July 1985) used tne NRC NDE Van to independentfy radiograph welds. Such inspections vert-tied the adequacy of the licensee's radiographic program and compared site file film to NRC radiographs in an assessment of the licensee's overall NDE quality control program.
L r
Another assessment of licensee performance in this area was conducted during the SALP appraisal on February 19, 1985. In the SALP report, issued on May 28, 1985, the following evaluation was documentec:
"It is noted, however, that with regard to completed and finally in-spected hardware, very few problems were identified. In fact, in the welding and NDL areas, independent examinations by NRC inspectors l revealed generally high quality work and effective licensee overivew of the final radiographic film packages."
In assessing the overall performance in the area of piping during this ,
January 1 - December 31, 1984 SALP )eriod, it was noted that significant improvement had been achieved and t1at the licensee had demonstrated "ade-quate control over their self-identified construction problems." One of the areas evidencing such licensee control was the YAEC 1001 radiographic review process.
Further, in the previously mentioned Region I internal memorandum of January 4,1984, it was noted that:
"A key operation in providing assurance of QC field activities is the YAEC surveillance program. Specifically YAEC NDE personnel had been and still do conduct 2001 review of contractor accepted radiographs."
t this memorandum not only arovides the requested reference to an NRC docu-ment acknowledging the YAEC 1001 radiographic review effort, but also assesses this program in the context of NRC followup of the previously -
reportedNDEfalsificationproblem,(i.e.,the"Padovano" case). It should be noted that the above quote discusses the 100% review in reference to the "YAEC surveillance program." As has been discussed in previous re-sponses to Dr. Nyers' requests, prior to the im)1ementation of the YAEC :
- NDE Review Group procedure No. 5 in May 1984, tie YAEC radiographic review process was controlled as a surveillance activity. Thus, even though sur-veillances were not normally 100% inspection efforts the above NRC quota-tion illustrates the YAEC intent to conduct such fil reviews on a 100%
basis some time before the existence of the procedur ' requirement to do 50.
The inspection reports identified in the response to this request have l.
been provided previously, l
l l
~
, i HeQuest 3 (question 4 of June 19.1990):
(excerpted) On May 22, I asked that you provide prior to COB, Wednesday, May 30 the Radiographic Inspection Reports for the cooling tower welds where the main "T" connects to the spray headers and for the six welds closest to this connec-tion. As of this date, I have not received the requested Radiographic inspec-tion Reports; please provide them prior to COB, Friday, June 22 or, in the event such documents are not available, an explanation as to why they are not available.
Response
In response to Dr. Myers' request of May 22, 1990 on the allegation concerning deficiencies in the radiographic record of the cooling tower piping welds, Nonconformance Report UE&C NCH $66, enclosing the requested Radiographic In-spection Reports, was forwarded separately. Attachment 2 to a June 26, 1990 NRC memorandum responding to subsequent requests from Dr. Myers also was for-warded to convey supplemental information relative to the NRC follow-up on this issue.
e AO
l
[
c Request 4 (entire request XXV of June 26. 1990):
(excerpted) Your June 26 response to Seabrook Welds XV states that Revision 2 of NCR 6781 addresseh the 2b1 review item. While Revision 2 does in fact address the item with a statement to the effect that the 25% review had been initiated and was approximately 80% complete, it does not, as far as I can de-tect, include the review required by NRC 5781, Revision 1. In fact, Revision 2 (issued on May 24, 1984, more than two months after the due date of the 25%
review) indicates that the review had not been completed as of the date of issuance of Revision 2.
If the NRC staff has located document (s) describing the 25% review required by '
NCR 5781, please provice me such documents (s) prior to COB, Friday, June 29, or in the event you cannot provide the document (s) by this date, please inform me of the reasons for the inability to do so.
Response
\
Revision 2 of NRC 5781 documents the following:
" Item 3: This NRBKt item requested a review of 25% of the Process Sheets for the KC system that were processed during the same time frame as RC-049, t0103.
P-H QA Records has initiated a review of all Process Sheets for the RC '
primary loop. This task is approximate 1yT1 complete."
WhiletheNonconformanceReviewBoardResponseForm(NRBRF)forNCR5781,Re-vision 1, required a review of 25% of the process sheets for the RC system.
Pullr'an-Higgins (P-H) QA personnel initiated a review of all process sheets.
(The underlined emphasis was part of the exact NCR wording"7 NCR 5781, Revision 2, was issued on April 12, 1984 at which time the pages containing the above quotation were provided. Dr. Myers' reference to a May 24, 1984 date is the date the Nonconformance Review Board accepted the disposition of this NCR. A review of the signature blocks on NCR 5781, Revision 2, indicates that the Engineering / Construction and QA/QC representatives on the review board actually signed off on the disposition on April 12, 1984, showing that they had for the1r review and consideration the quoted status of the P-H review process.
Therefore, what is documented in NCR 5781, Revision 2, is a statement that, as of April 12, 1984 P-H QA personnel had reviewed 80% (i.e., more than three times what was required) of all RC loop process sheets. Included with this statement is the chronological report of activities concerning field weld RC-49-01, F0103 as directed by the NRBRF disposition of Revision 1 of the NCR.
The last chronological entry for final RT acceptance by the P-H NDE Level 111 technician was dated April 11, 1984. Since Revision 2 to the NCR was issued on the following day, it appears that P-H waited for this final RT acceptance prior to 1ssuing Revision 2 to the NCR so that it would be included in the
i l
chronological report. That would explain why the supplemental information, to i include the process sheet review status, was not submitted as requested by l March 16, 1984 I Furthermore, while concerning
" report of activities the NCR 5781, Revision 1,fteld weld, it required Pullman-disposi the noted Higgins to "teview 25% of the process sheets f or the RC system." No require-ment for a " report" of this review effort is discussed. Such a provision calling for a document " review" without a rewiting formal " report" would not i be unusuel. This is because any discrepanci w or deficiencies identified as a '
result of such a rnview would be required, by ?.h3 P-H deficiency /nonconfortnance program, to be addressed and corrected on a e.se-by case basis.
The disposition to Nevision 1 to NCR 5781 specified that the P-H review of the RC system process sheets include as a minimum a review of: ;
i A. Minimum wall requirements B. Original WPS for the weld joint ,
C. Repair WPd for the weld joint While a definitive statement of the results of such a review would have assisted the current understanding of what occurred in that time trame in 1984, a report ;
of the type requested by Dr. Myers was not required and it was not expected that one would be prepared. Pullman-Higgins was conducting a records review (the scope of which was. delineated as noted ahve in Revision 1 to NCR 5781) to search for discrepancits similar to the ones identified on the >rocess sheet for Field Weld RC-49-01, F0103. This fact was sufficient for tie Nonconformance Review Board to accept the di: position to Revision 2 of the NCR because any ,
discrepancies identified woulo have to be 6ddressed and corrected.
It should also be noted that, in the NRC followup of an allegation documented in IR 50-443/85-17, the fiele weld process records for RC-49-01 F0103 were reviewed. Atthesametime,NRCreviewofNCR5781toincludedevision2was conducted. No deficiencies were identified as a result of this review. Also, subsequentNRCVaninspection(reference: IR50-443/85-19) included radiography .
of F1 eld Weld RC-49-01, F0103, and identified no problems. This weld was specit1ca11y selected for independent van inspection by the NRC because of the problems documented with this field weld in NCR 5781 and its revisions.
The above inspection report ref erences have been previously provided.
--- ~