ML20080B553

From kanterella
Revision as of 21:49, 26 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Provides Addl Info Re Status of Auxiliary Feedwater Sys Mods Implemented in Response to Generic Ltr 81-14.Last Remaining Mod Involves Replacement of Battery Rack Support Straps & Should Be Completed by Oct 1984
ML20080B553
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/31/1984
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
References
GL-81-14, TAC-43669, TAC-43670, NUDOCS 8402070186
Download: ML20080B553 (1)


Text

r -

O Wisconsin Electnc eowca couesur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 January 31, 1984 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 AUXILIARY FEEDWATER SYSTEM MODIFICATIONS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 This is to provide further information regarding the status of modifications to the Point Beach Nuclear Plant in response to NRC Generic Letter No. 81-14 last reported in our letter dated February 11, 1983. As of March 10, 1983, all modifications to electrical supports required as part of the program to enhance the seismic resistance of the auxiliary feedwater system at Point Beach were completed. As of June 8, 1983, all modifications to the piping and component supports as part of this same program were completed.

The last remaining modification required is to replace the existing support straps on the battery racks to improve the load carrying capability of the rack support rails when subjected to seismic loads applicable to the feedwater system design. This work is currently in progress and is expected to be completed by October 1984.

Final notification will be given upon completion of the battery rack strap replacement.

Very truly yours, 8402070186 840131 [ -

PDR ADOCK 05000266 [ ' 6 (, ng P PDR y Vice President-Nuclear Power C. W. Fay Copy to NRC Resident Inspector

/900/

IO l