MONTHYEARML19350D3491981-04-0909 April 1981 Responds to 810127 Request for Response to Unresolved Items Identified in Safety Evaluation for Auxiliary Feedwater Sys, Including short-term Recommendation GS-1 Re Tech Specs & Recommendation Re Redundant Level Indications Project stage: Request ML20009C7371981-07-16016 July 1981 Forwards Response to Generic Ltr 81-14 Re Seismic Qualification of Auxiliary Feedwater Sys.Sys Is Adequately Protected for Seismic Event Project stage: Other ML20040G4761982-01-25025 January 1982 Forwards Request for Addl Info Re Response to Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys Project stage: RAI ML20052F2161982-05-0404 May 1982 Forwards Addl Response to Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys. Major Mechanical Components Seismically Qualified Except Condensate Storage Tanks Project stage: Other ML20028A7531982-11-12012 November 1982 Requests Encl Contractor Technical Evaluation Rept Re Seismic Qualification of Auxiliary Feedwater Sys Be Reviewed & Comments Provided by 821220 Project stage: Other ML20067D6311982-12-15015 December 1982 Comments on Technical Evaluation Rept Re Seismic Qualification of Auxiliary Feedwater Sys,Per 821112 Request. Recommendation to Acquire Complete SSE Level of Seismic Capacity Constitutes Unnecessary & Expensive Backfit Project stage: Other ML20064L8991983-02-11011 February 1983 Advises That Installation of Addl Supports for Auxiliary Feedwater Sys Piping & Components Rescheduled to June 1983, Due to Conflicts W/Other Plant Mods Project stage: Other ML20080B5531984-01-31031 January 1984 Provides Addl Info Re Status of Auxiliary Feedwater Sys Mods Implemented in Response to Generic Ltr 81-14.Last Remaining Mod Involves Replacement of Battery Rack Support Straps & Should Be Completed by Oct 1984 Project stage: Other ML20091J8581984-05-23023 May 1984 Emergency Operating Procedure Validation Procedure Project stage: Other ML20100J0891984-12-0404 December 1984 Provides Final Responses to Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys. Support Straps on Battery Racks Replaced as Scheduled in Project stage: Other ML20116D2981985-04-22022 April 1985 Notifies That Installation of Low Suction Pressure Automatic Trips on Auxiliary Feedwater Pumps Expected to Be Completed by 860131,in Response to NRC Request for Commitment Date Project stage: Request ML20206S7491986-05-31031 May 1986 Evaluation of Structural Aspects Re Point Beach Plant Project stage: Other ML20206S7091986-09-16016 September 1986 Safety Evaluation on Util 850426 Response to Open Items Re Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys (Afws). Reasonable Assurance Exists That Afws Will Perform Required Safety Function Following SSE Project stage: Approval ML20206S6861986-09-16016 September 1986 Forwards Safety Evaluation & Technical Evaluation Rept on Util 850426 Response to Open Items Re Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys. Addl Info Requested Re Diesel Generator Room Flooding Project stage: Approval ML20215N8401986-10-31031 October 1986 Advises of Features & Mods to Diesel Generator Room Air Exhaust Duct Louvers & Diesel Generator Voltage Regulator Cabinets in Response to Concerns Expressed in 860916 Safety Evaluation Re Util Compliance W/Generic Ltr 81-14 Project stage: Other ML20209H2971987-01-21021 January 1987 Advises That Mods to Protect Diesel Generator Voltage Regulator Cabinets from Fire Protection Sprinkler Operation Adequately Address NRC Concerns Identified in 860916 Safety Evaluation,Per Util Project stage: Approval 1984-01-31
[Table View] |
Text
r-O insconsin Electnc eowca coursur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 April 22, 1985 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Attention:
Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:
DOCKET NOS. 50-266 AND 50-301
~
AUXILIARY FEEDWATER PUMP LOW SUCTION PRESSURE TRIP POINT ~ BEACH NUCLEAR PLANT, UNITS 1 AND 2 During a recent meeting with your staff on a separate but related matter regarding the auxiliary feedwater system at Point Beach Nuclear Plant, the Staff requested commitment dates for completion of installatioil of low suction pressure automatic trips on the auxiliary feedwater pumps.
Control room indication of pump suction pressure has been installed and operators have been instructed to manually trip auxiliary feedwater pumps on low suction pressure.
We expect to provide automatic trip features by January 31, 1986 for both units.
Should you have any questions, please contact us.
Very truly yours, h!
y'-
Vice Pres'ide~nt-Nuclear Power C. W. Fay Copy to NhC Resident Inspector
)