Notifies That Installation of Low Suction Pressure Automatic Trips on Auxiliary Feedwater Pumps Expected to Be Completed by 860131,in Response to NRC Request for Commitment Date
ML20116D298
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/22/1985
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
References
TAC-43669, TAC-43670, NUDOCS 8504290362
Download: ML20116D298 (1)


Text

r-O insconsin Electnc eowca coursur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 April 22, 1985

. Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:

~

DOCKET NOS. 50-266 AND 50-301 AUXILIARY FEEDWATER PUMP LOW SUCTION PRESSURE TRIP POINT ~ BEACH NUCLEAR PLANT, UNITS 1 AND 2 During a recent meeting with your staff on a separate but related matter regarding the auxiliary feedwater system at Point Beach Nuclear Plant, the Staff requested commitment dates for completion of installatioil of low suction pressure automatic trips on the auxiliary feedwater pumps.

Control room indication of pump suction pressure has been installed and operators have been instructed to manually trip auxiliary feedwater pumps on low suction pressure. We expect to provide automatic trip features by January 31, 1986 for both units.

Should you have any questions, please contact us.

Very truly yours, y'-

h!

Vice Pres'ide~nt-Nuclear Power C. W. Fay Copy to NhC Resident Inspector

)

8504290362 850422 PDR O ADOCK 05000266 PDR \,O