ML20100J089

From kanterella
Jump to navigation Jump to search

Provides Final Responses to Generic Ltr 81-14, Seismic Qualification of Auxiliary Feedwater Sys. Support Straps on Battery Racks Replaced as Scheduled in
ML20100J089
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/04/1984
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
References
GL-81-14, TAC-43669, TAC-43670, NUDOCS 8412100210
Download: ML20100J089 (1)


Text

._

O Msconsin Electnc am cwar 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 December 4, 1984 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. J. R. Miller, Chief Operating Reactors, Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 FINAL RESPONSE TO GENERIC LETTER 81-14 SEISMIC QUALIFICATION OF AUXILIARY FEEDWATER SYSTEM POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Our letter dated January 31, 1984 provided the status of the modifications performed at the Point Beach Nuclear Plant in response to Generic Letter 81-14, " Seismic Qualification of Auxiliary Feedwater Systems".

We have since replaced the support straps on the battery racks as scheduled in the January 31 letter. This was the final modification required to complete our action in response to Generic Letter 81-14 and completes our response to that letter.

Very truly yours, Vice President-Nuclear Power C. W. Fay Copy to NRC Resident Inspector OochO66 PDR ,pt