ML20211M153
ML20211M153 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 02/10/1987 |
From: | Wenslawski F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
Shared Package | |
ML20211M160 | List: |
References | |
NUDOCS 8702270224 | |
Download: ML20211M153 (2) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212B1681999-09-13013 September 1999
[Table view]Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML16343A4801997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld 1999-09-13 Category:NRC TO UTILITY MONTHYEARML20058B5331990-10-22022 October 1990
[Table view]Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20246K4721989-08-28028 August 1989 Advises That 880419 Rev 2 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246E5321989-08-22022 August 1989 Forward Summary of Sys Engineering/Design Engineering Initiatives & ...Quarterly Sys Status Rept,2nd Quarter 1989.... Rept Demonstrates Depth,Scope & Usefulness of Walkdown as Tool for Assessing Sys Status,Problems & Trends IR 05000275/19890201989-07-31031 July 1989 Forwards Safeguards Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-14.No Violations Noted ML20245D9431989-04-18018 April 1989 Forwards Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted IR 05000275/19890071989-03-24024 March 1989 Forwards Safeguards Insp Repts 50-275/89-07 & 50-323/89-07 on 890227-0303.No Violations Noted.Repts Withheld (Ref 10CFR2.790(d) & 73.21) ML20151X2161988-08-18018 August 1988 Ack Receipt of Transmitting Scenario for Util 1988 Annual Emergency Preparedness Exercise ML20151U3741988-08-11011 August 1988 Informs of NRC Interpretation of 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20154P0741988-05-26026 May 1988 Forwards Notice of Consideration of Issuance of Amends to Licenses DPR-80 & DPR-82 in Response to 880520 Application to Revise Tech Specs Re Section 6.0, Administrative Controls ML20154F9191988-05-17017 May 1988 Advises That Portions of 880419 Rev 16 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Requests Resubmittal of Corrected Plan Pages as Necessary to Maintain Plan Continuity ML20151G1381988-04-14014 April 1988 Responds to FOIA Request for Documents Re ACRS Meeting on Plant.Forwards Dj Skovholt 750324 Memo to F Schroeder Concerning Plant pre-ACRS SER Suppls.Charges for Search, Review & Reproduction Provided ML20196D6091988-02-0101 February 1988 Forwards Exam Rept 50-275/OL-87-02 on 871208-17.Corrected Exam Keys Encl ML20235E1691987-09-21021 September 1987 Advises of Unauthorized Use of Health Physics Network (HPN) Emergency Communication Sys.Requests Review of Adequacy of Controls & Procedures Implemented at Facility to Ensure Only Govt Authorized Use of HPN ML20235D0021987-09-18018 September 1987 Advises That Written & Oral Operator & Senior Operator Licensing Exams Scheduled for 871208-17.Ref Matls Listed in Encl 1 Required by 871013.Requirements for Administration, Rules & Guidelines & Review Requirements Also Encl ML20239A4721987-09-0404 September 1987 Forwards Mgt Meeting Repts 50-275/87-32 & 50-323/87-32 on 870817.Communication of Mgt Expectations Addressed IR 05000275/19870231987-08-20020 August 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/87-23 & 50-323/87-22 ML20214Q2691987-05-22022 May 1987 Forwards Info Re Loss of RHR While in mid-loop Operation on 870410.Info Provides Guidance for Any Operating Procedure Rewriting Which May Be in Progress & for Incorporation Into Operator Training Program ML20214J8671987-05-0808 May 1987 Forwards Insp Repts 50-275/87-18 & 50-323/87-15 on 870420- 24.No Deviations or Violations Noted ML20204E2331987-03-20020 March 1987 Forwards Insp Repts 50-275/86-33 & 50-323/86-31 on 861215-19 & Potential Enforcement/Unresolved Items.Four Deficiencies Will Be Referred to Region V for Further Action.Corrective Actions Should Be Not Be Delayed ML20204B8521987-03-19019 March 1987 Advises That 861121 Rev 15 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20207S7321987-03-13013 March 1987 Ack Receipt of in Response to 870204 Notice of Violation ML20207S8571987-03-13013 March 1987 Extends Invitation to Attend 870414 Meeting in Denver,Co to Discuss 10CFR50.55 Change.Proposed Agenda Encl ML20205D7121987-03-11011 March 1987 Forwards Insp Repts 50-275/87-09 & 50-323/87-08 on 870223- 27.No Violations Noted ML20212M1131987-02-23023 February 1987 Forwards Insp Repts 50-275/87-04 & 50-323/87-04 on 861228- 870207.No Violations Noted ML20211M8581987-02-19019 February 1987 Confirms 870306 Mgt Meeting W/Util at Plant to Discuss 870102 & 10 Events & Insp Findings.Meeting Agenda Encl ML20211B1511987-02-13013 February 1987 Advises That Bolt SAE J429K,Grades 8 & 8.2 Did Not Satisfy Vendor Program Branch Fastener Evaluation Program.Bolt Did Not Pass Tensile Strength Requirement.Info Re Actions on Nonconforming Condition & Bolt Insp Practices Requested ML20212A1871987-02-12012 February 1987 Forwards Insp Repts 50-275/87-07 & 50-323/87-06 on 870202-06.No Violations Identified ML20211C8971987-02-12012 February 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in ML20211M1531987-02-10010 February 1987 Forwards Insp Rept 50-275/87-06 on 870112-13 & Notice of Violation.Nonemergency Telephone Calls Directed to Control Room During 870102 Event Had Negative Impact on Handling of Emergency IR 05000275/19870021987-02-0404 February 1987 Forwards Safeguards Insp Repts 50-275/87-02 & 50-323/87-02 on 870112-16 & Notice of Violation.Insp Repts & Notice of Violation Withheld (Ref 10CFR2.790) ML20210E9591987-02-0404 February 1987 Advises of 870311 Workshop on NRC Incident Investigation Program (Iip) in Walnut Creek,Ca to Provide Info Re NRC Process for Investigating Potential Significant Incidents. Agenda Encl.W/O Iip Procedures ML20210R0741987-01-30030 January 1987 Forwards Insp Repts 50-275/86-32 & 50-323/86-30 on 861109- 1227 & 870116.No Violations Noted ML20210R2341987-01-30030 January 1987 Forwards Insp Repts 50-275/87-03 & 50-323/87-03 on 870112- 16.No Violations Noted ML20210R9821987-01-29029 January 1987 Forwards Insp Repts 50-275/87-05 & 50-323/87-05 on 870112- 16.No Violations Noted ML20210B3081987-01-22022 January 1987 Forwards Exam Rept 50-275/OL-86-02 of Exams Administered on 861202-04.Exam & Answer Key & Power Plant Exam Results Summary Also Encl ML20212B2191986-12-23023 December 1986 Advises That 860821 Rev 14 Drawings to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20212A5771986-12-18018 December 1986 Informs That Emergency Plan SOP III.25 Will Be Placed in PDR Due to Document Not Meeting 10CFR2.790(a)(7)(vi) Withholding Provisions.Document May Be Withdrawn If Requested within 30 Days IR 05000275/19860291986-12-0909 December 1986 Discusses Insp Rept 50-275/86-29 on 860928-1108 & Mgt Meeting Rept 50-275/86-34 on 861124 & Forwards Notice of Violation ML20214U6031986-12-0303 December 1986 Confirms 861215-19 Equipment Qualification Insp at Facility. Insp Will Include Review of Implementation of 10CFR50.49 Program ML20215M9001986-10-16016 October 1986 Forwards SALP Repts 50-275/86-22 & 50-323/86-22 for Aug 1985 - Jul 1986.Mgt Meeting Not Required,But May Be Requested within 10 Days of Ltr Date IR 05000275/19860241986-10-0303 October 1986 Forwards Safeguards Insp Repts 50-275/86-24 & 50-323/86-24 on 860825-0903.No Violations Noted.Encl Withheld (Ref 10CFR73.21) ML20206T9351986-09-17017 September 1986 Forwards Insp Rept 50-275/86-25 on 860825-29.No Violations Noted ML20206R4271986-09-0202 September 1986 Forwards Exam Rept 50-275/OL-86-01 of Exam Administered on 860715-23 for Units 1 & 2 ML20205C2791986-08-0606 August 1986 Grants 860715 Request to Delay Calibr of Reactor Coolant Pressure wide-range Instruments to No Later than 860919.If Reactor Taken Subcritical Prior to Expiration of Relief, Enforcement Discretion No Longer Applicable IR 05000275/19860111986-06-16016 June 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/86-11 & 50-323/86-12 ML20206G1171986-06-16016 June 1986 Forwards Safety Insp Rept 50-275/86-15 on 860428-0502.No Violations Noted.Unresolved Item Identified Re Determination of Sys Operability During Corrective Maint Situation Will Be Examined in Future Insps IR 05000275/19860091986-06-0505 June 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-275/86-09 ML20198R5831986-06-0404 June 1986 Ack Receipt of 860602 Revised Scenario Manual for 860610 Emergency Preparedness Exercise.Scenario Package Adequate IR 05000275/19860021986-06-0303 June 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/86-02 & 50-323/86-02 1990-06-13 Category:OUTGOING CORRESPONDENCE MONTHYEARML20212B1681999-09-13013 September 1999
[Table view]Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright ML20149H8171994-12-23023 December 1994 Advises That 941010 & 1102 Changes 4 & 5 to Rev 18 of Physical Security Plan,Respectively Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20059L5031994-01-28028 January 1994 Extends Invitation to Participate in Workshop Re Emergency Preparedness & Incident Response on 940222 in Arlington,Tx ML20058A1211993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld IR 05000275/19930211993-08-27027 August 1993 Forwards Insp Repts 50-275/93-21 & 50-323/93-21 on 930726-30.Non-cited Violations Identified.Insp Repts Withheld in Entirety Ref 10CFR73.21 ML20057B3241993-05-0404 May 1993 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App Q Which Are Being Made Available at Pdr.Documents Listed in App R Are Partially Withheld (Ref FOIA Exemption 5) ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20056C2811993-01-29029 January 1993 Ltr Contract,Mod 1 to Task Order 5,providing Incremental Funding of Listed Amount,To IPE Reviews,Internal Events Back-End-Only ML20127F1091993-01-13013 January 1993 Extends Invitation to Participate as Breakout Session Facilitator on 930217-18 at Workshop Hosted by Regions IV & V in Arlington,Tx to Discuss Operability/Degraded Equipment as Specified in GL 91-18.Record Copy IR 05000275/19920321992-12-11011 December 1992 Forwards Insp Repts 50-275/92-32 & 50-323/92-32 on 921116-19 & Notice of Violation.Violation Noted Re Failure to Withdraw Security Safeguards Access List.Encls Withheld (Ref 10CFR73.21) IR 05000275/19920281992-12-0202 December 1992 Forwards Insp Repts 50-275/92-28 & 50-323/92-28 on 921005-09.No Violations Noted.Encl Withheld (Ref 10CFR73.21) ML20058B5331990-10-22022 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML20058N8501990-08-10010 August 1990 Responds to Forwarding Correspondence from Bl Boxer & Le Panetta Re Seismic Safety of Plant.Nrc Will Complete Review of Plant Seismic Reevaluation Program & Will Document Findings in SER DD-90-03, Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc1990-07-27027 July 1990 Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20246K4721989-08-28028 August 1989 Advises That 880419 Rev 2 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246E5321989-08-22022 August 1989 Forward Summary of Sys Engineering/Design Engineering Initiatives & ...Quarterly Sys Status Rept,2nd Quarter 1989.... Rept Demonstrates Depth,Scope & Usefulness of Walkdown as Tool for Assessing Sys Status,Problems & Trends IR 05000275/19890201989-07-31031 July 1989 Forwards Safeguards Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-14.No Violations Noted ML20245D9431989-04-18018 April 1989 Forwards Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted IR 05000275/19890071989-03-24024 March 1989 Forwards Safeguards Insp Repts 50-275/89-07 & 50-323/89-07 on 890227-0303.No Violations Noted.Repts Withheld (Ref 10CFR2.790(d) & 73.21) ML20235W2621989-03-0101 March 1989 Final Response to FOIA Request for Transcripts Re Facility. Forwards App H Documents.App H Documents Also Available in Pdr.App I Documents Partially Withheld Per Sunshine Act ML20205R1641988-10-18018 October 1988 Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5) IA-88-102, Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5)1988-10-18018 October 1988 Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5) ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR IA-88-455, Final Response to FOIA Request for Documents.App a Documents Available in PDR1988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20155F8691988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20153H6121988-08-18018 August 1988 Final Response to FOIA Request.Forwards App E Documents.Apps D & E Documents Available in Pdr.Charges for Search, Duplication & Postage Listed ML20151X2161988-08-18018 August 1988 Ack Receipt of Transmitting Scenario for Util 1988 Annual Emergency Preparedness Exercise ML20153G9331988-08-15015 August 1988 Partial Response to FOIA Request for Documents.Forwards App C Document.Documents Available in PDR ML20153H1821988-08-12012 August 1988 Responds to 880505 Appeal of Denial of Documents & Portions of Documents Identified on Encl Apps E & F in 880425 Response to FOIA 87-444.Documents or Portions of Documents Continue to Be Withheld (Ref FOIA Exemption 5) ML20151U3741988-08-11011 August 1988 Informs of NRC Interpretation of 10CFR50.74(a) Re Changes in Operator or Senior Operator Status 1999-09-13 |
See also: IR 05000275/1987006
Text
- .
,
.
.
,
FEBi0N8i
Docket No. 50-275
Pacific Gas and Electric Company =
77 Beale Street ,
4
Room 1451.
San Francisco, California 94106'
' Attention: Mr. J. D. Shiffer, Vice President
Nuclear Power Production
Gentlemen: -
Subject: NRC Inspection
This refers to the special inspection conducted by Ms. G. M. Good of this
office on January 12 and 13, 1987,.of activities authorized by NRC License No.
DPR-80 and to the discussions of our findings held by Ms. Good with
Mr. R. Thornberry and other members of your staff at the conclusion of this
inspection.
This inspection was conducted to evaluate the implementation of your Emergency
Plan (EP) during the Unusual Event which was declared on January 2, 1987. The
inspection consisted of selective examinations of procedures and ,
representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears _that one of your actions
was not conducted in full compliance with NRC regulations, as set forth in the
Notice of Violation enclosed herewith as Appendix A. Your response to this
office is to be submitted in accordance with the provisions of 10 CFR 2.201 as
stated in Appendix'A, Notice of Violation.
Comments obtained during this inspection indicate that non-emergency telephone
calls directed to the Control Room during this event had a negative impact on
the handling of the emergency. The possibility of such a negative impact was
identified during our June 1985 Emergency Response Facilities Appraisal (see
,
Section 1.3.1 of inspection report no. 50-275/85-24). It is our belief that
coping with this situation'cannot be adequately addressed by additional
training only. Therefore, we suggest you consider other ways of handling the
non-emergency calls when the staff is responding to an emergency.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter (and the accompanying Notice) are not
-
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
0702270224 070210 _- '/l
PDR ADOCK 05000275 7' / //
G PDR f F
- l
f,
.
-
e n $
e . .
.
f
'
-2-
FEB 10 libi
.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincere,1y, -
Cri&O)8/S/URECf
Frank A. Wenslawski, Chief
Emergency Preparedness and Radiological
Protection Branch
Enclosures:
A. Notice of Violation
B. Inspection Report No. 50-275/87-06
cc w/ enclosures:
S. Elkins, FEMA, Region IX
S.- M. Skidmore, PG&E
R. C. Thornberry, PG&E (Diablo Canyon)
P. A. Crane, PG&E
D. Taggart, PG&E (Diablo Canyon)
R. Weinberg, PG&E (Diablo Canyon)
W. Fujimoto, PG&E
State of CA
bec w/ enclosures:
RSB/ Document Control Desk (RIDS)
D. Matthews, EPB, IE
Project Inspector
Resident Inspector
G. Cook
B. Faulkenberry
J. Martin
docket file
bec w/o enclosure B:
M. Smith
LFMB
bcc enclosure B only:
Sandra Silver
1
REGION V
GGood/ dot RFish
a
- on
AJohh)
(8kf
FWensuwski
8 7
2/]/37 2/IO/87
RE EST COPY ] REQUEST COPY ] REQUEST Y ] REQUEST COPY ]
/ N0 ] YES / N0 ] YES / 0
]QE5// N0 ]
D TO PDR ]
YES / NO ]
v
I