MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20207B2221999-05-20020 May 1999 Forwards Insp Rept 50-443/99-03 on 990308-0408.Violations Identified & Being Treated as non-cited Violations ML20206K1811999-05-0707 May 1999 Responds to Re Event Notification from North Atlantic Energy Service Co Indicating That One of Seabrook Two EDG May Have Been Inoperable Since June 1997. NRC Insp of Problem Not Yet Completed ML20206N6811999-04-23023 April 1999 Ack Receipt of ,Re Potential Inoperability of Two Emergency Diesel Generators Since June 1997 at Seabrook Nuclear Power Station.Issue Under Ongoing Insp & Review by NRC ML20205R1171999-04-20020 April 1999 Ack Receipt of Ltr Requesting Action Under 10CFR2.206 Re Enforcement Action Against Individuals Alleged to Have Unlawfully Discriminated Against Contract Electrician. Request to Attend Enforcement Conference Denied.Frn Encl ML20206B3451999-04-20020 April 1999 Forwards Insp Rept 50-443/99-01 on 990207-0321.Violations Identified Involving Failure to Properly Test Primary Auxiliary Building for Test Failures & Inadequate C/A to Prevent Recurrence of Repeated Pab for Test Failures ML20205P1871999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review ML20205N4991999-04-0808 April 1999 Responds to Requesting Copy of OI Rept 1-1998-005,or in Alternative Summary of Investigation Rept. Request for Copy of Investigation Rept,Denied at This Time, Because NRC Did Not Make Final Enforcement Decision ML20205C1891999-03-24024 March 1999 Refers to Naesco 981030 Request for Approval of Alternative Inservice Exam to That Specified by ASME BPV Code,Section XI,1983 edition/1983 Summer Addenda.Forwards SE Supporting Proposed Relief Request IR-8,Rev 1 ML20204E4191999-03-16016 March 1999 Informs of Results of Investigation Conducted at Seabrook Nuclear Generating Station by NRC OI & Requests Participation at Predecisional Enforcement Conference in King of Prussia,Pa Relative to Investigation 1-98-005 ML20204F3101999-03-16016 March 1999 Discusses Investigation Conducted at Plant by OI Field Ofc, Region 1.Purpose of Investigation to Determine Whether Certain Activities Conducted Per NRC Requirements.Synopsis of IO Investigation Rept 1-98-005 Encl ML20210U2281999-03-16016 March 1999 Refers to Apparent Violation of NRC Requirements Prohibiting Deliberate Misconduct by Individuals & Discrimination by Employers Against Employees Who Engage in Protected Activities,Investigation Rept 1-98-005 ML20207C2991999-02-26026 February 1999 Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As ML20203A2811999-01-28028 January 1999 Forwards Insp Rept 50-443/98-10 on 981115-1227.No Violations Noted.Operators Performed Well During Two Reactor start-ups & Response to Plant Trip on December 22.Radioactive Waste Mgt Program Properly Implemented ML20198Q7391998-12-21021 December 1998 Informs That Review of Licensee Response to GL 97-05, SG Tube Insp Techniques, Did Not Identify Any Concerns with SG Insp Techniques Employed at Seabrook That Would Indicate That Naesco Not in Compliance with Licensing Basis ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) ML20198D1341998-12-16016 December 1998 Forwrds Ltr from J Bean Transmitting Final Exercise Rept for 981020,MS-1,out of Sequence Drill for Elliot Hosp in Manchester,Nh.Assistance Being Requested to Offsite Officials to Address & Resolve Identified Arca Timely ML20198C1131998-12-11011 December 1998 Forwards Insp Rept 50-443/98-09 on 981004-1114 & Notice of Violation.Nrc Identified That Safety Equipment Removed from Service at Beginning of Forced Outage Without Appropriate Monitoring of Status of Equipment as Required ML20197K1931998-12-0909 December 1998 Forwards RAI Re Utilities Participation in WOG Response to GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. Response Requested within 90 Days of Submittal Date 1999-09-30
[Table view] |
Text
_ _ _ . __ _ = _ - _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ - - _ _ _ . --______________ ___ - _-__ _ _ ___-__-_
e .
.
.
August 27,1998 Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer Seabrook Station North Atlantic Energy Service Corporation c/o Mr. Terry L. Harpster P.O. Box 300 Seabrook, NH 03874 SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-443/ 98-01 AND NOTICE OF VIOLATION
Dear Mr.Feigenbaum:
This letter refers your May 27,1998 correspondence,in response to our April 27,1998 letter.
' Thank you for informing us of the corrective and preventive actions documented in your letters. Ti.::se actions will be examined during future inspections of your licensed program.
Your cooperation with us is appreciated.
Sincerely, Original Signed By:
Curtis J. Cowgill,111, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No. 50-443 cc w/o cy of Licensee Response Letter:
}i j B. D. Kenyon, President - Nuclear Group l J. S. Streeter, Recovery Officer - Nuclear Oversight -
} !
W. A. DiProfio, Station Director - Seabrook Station R. E. Hickok, Nuclear Training Manager - Seabrook Station D. E. Carriere, Director, Production Services .
L. M. Cuoco, Senior Nuclear Counsel !
!
l
-
J
.0 \
\
V
.
W
. 11@!%4 .
I'
L
_ ______--- . __
, .
.
.
Mr. Ted C. Feigenbaum 2 Seabrook cc w/cy of Licensee Response Letter:
W. Fogg, Director, New Hampshire Office of Emergency Management
.
D. McElhinney, RAC Chairman, FEMA RI, Boston, Mass R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency Management Agency F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power Corporation R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts Seacoast Anti-Pollution League D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States W. Meinert, Nuclear Engii.eer l
.
l
,
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ .____ __ _ - - - _ _
,. .
.
.
! ' Mr. Ted C. Feigenbaum 3 Seabrook Distribution w/cv of Licensee Response Letter:
Region I Docket Room (with concurrences)
PUBLIC Nuclear Safety Information Center (NSIC)
NRC Resident inspector j H. Miller, RA/W. Axelson, DRA C. Cowgill, DRP R. Summers, DRP C. O'Daniell, DRP B. McCabe, OEDO C. Thomas, PD l-3, NRR (COT)
'J. Harrison, PD l-3, NRR i
- R. Correia, NRR (RPC)
F. Talbot, NRR D. Screnci, PAO, ORA
I DOCUMENT NAME: G:\ BRANCH 5\RPLY-LTR\ SEA-RPY.898 Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure 'E' = Copy with attachment / enclosure "N"=
No copy l OFFICE Rl/DRP l Rl/DRPQ l / l lNAME CCowgill TLS-lDATE 08/18/98 08/pd98 I 08/ /98 08/ /98 08/ /98 OFFICIAL RECORD COPY
.
l l
_ - - _ _ - _ _ _ . - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - - _ - _ - _ _ _ - - _ _ _ - - _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _. . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ .
l *'
..
u ,,,,,1North North Atlantic Energy Service Corporation <
'
RO. Box 300 j.
' ,$y
Atlantic seabrook, NH 03874 (603) 474 9521 The Northeast Utilities System May 27,1998 NYN-98076 Ref: ACR 98-882 ACR 98-719 ACR 98-1409 AR#98008669 i
United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Seabrook Station Reply to Notices of Violation North Atlantic Energy Service Corporation (Nor*.h Atlantic) provides in the enclosure its response to the Notices of Violation described in Inspection Report 98-01.
Should you have any questions concerning this response, please contact Terry L.Harpster, Director of Licensing Services, at (603) 773-7765. i Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
g{~
pyy p_ "
'Ted C. Feigenbaum /
Executive Vice Presi8ent and
-
ChiefNuclear Officer cc: H$ Miller,NRC'Rehoni Administrator C. W. Sinith, NRC Project Manager, Project Directorate 1-3
.R. K. Lorson, NRC Senior Resident Inspector E
- U _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _
.., .!
REPLY TO NOTICES OF VIOLATION NRC Inspection Report 98-01 describes two violations. The first violation involves four individuals failing to comply with radiation work permits and posted instructions. The second violation addresses the adequacy of the instructions developed to assure that modifications installed to the ventilation systems for both residual heat removal pump rooms would not result in an unacceptable reduction of the ventilation system flow.
North Atlantic's response to these violations is presented below.
1. Description of the Violations:
The following are restatements of the violations:
A. Seabrook Technical Specification 6.10.1 requires that procedures for personnel radiation protection be prepared consistent with requirements of 10 CFR Part 20 and shall be adhered to for all operations involving personnel radiation exposure.
Seabrook procedure RP 9.1, "RCA Access / Egress Requirements," revision 12, requires, in part, that personnel perform work inside the radiation controlled area in accordance with the radiation work permit and posted instructions.
Contrary to the above, on March 13,1998, the inspector identified that four individuals performing work inside a posted contaminated area failed to comply l with their radiation work permits and the posted instructions. I This is a Severity Level IV violation (Supplement I).
B! 10 CFR 50 Appendix B Criterion III, Design Control, requires, in part, that measures shall be established to assure that the design basis is correctly translated into drawings, procedures, and instructions. These measures shall include provisions to assure that appropriate quality standards are specified and included in design documents and that deviations from such standards are controlled.
Contrary to the above, on March 28,1998, the inspector identified that adequate instructions were not developed to assure that modifications installed to the ventilation systems for both residual heat removal pump rooms would not result in an unacceptable reduction of the ventilation system flow. This resulted in an unintentional ventilation flow reduction of approximately 50% to each room. l
-
This is a Severity Level IV violation (Supplement I).
(
,
. . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
- - - - - - - - - - - -
, :
.,,-_ ..
2. Reply to the Notices of Violations:
i l A.
Failure to Adhere to Radiation Work Permit and Posted Instructions (VIO 98-01-03)
!
Reason for Violation i
. !
'
North Atlantic agrees with this violation. On March 13,1998, the personr_el sampling oil and performing corrective maintenance on a temperature sensing element on Containment Building Spray (CBS) pump CBS-P9B did not use protective clothing (i.e. gloves) when touching potentially contaminated surfaces of the pump. All personnel processed out of the Radiological Controlled Area (RCA) exit via whole body frisk booths. Neither the ;
'
plant personnel nor any of the tools used became contaminated as a result of this activity.
Health Physics performed followup surveys of the pump area and found no spread of contamination.
North Atlantic immediately initiated an adverse condition report, conducted ;
comprehensive interviews with the personnel involved, and performed a thorough eview of the radiological posting practices. The results of the interviews concluded that the plant personnel working in the vicinity of CBS-P9B did not clearly understand the i posting process and which portions of the pump and its base were potentially <
contaminated. Additionally, these individuals did not exercise a questioning attitude with l regard to where the contamination might be located and subsequently did not interrupt ,
their activities to consult with health physics personnel. North Atlantic concluded that i
the area around CBS-P9B was posted in accordance with the Radiation Protection Program. Health Physics personnel reviewed the existing radiological postings and bdrricades and determined that they were appropriate and adequate. In addition, the Radiation Worker training program was reviewed and verified that the use of radiological tape as a boundary for a contaminated area was adequately addressed.
Corrective Actions 1. The individuals involved were coached and counseled. This activity is complete. ;
2. The Radiation Protection Manager conducted meetings with Performance <
Engineering, the Fix-It-Now (FIN) team and Maintenance personnel to review and reinforce health physics expectations. This activity is complete.
Date When Compliance Will Be Achiered
-
North Atlantic is in compliance with Technical Specification 6.10.1 and Seabrook Station Procedure RP 9.1 " Radiation Control Area Access / Egress Requirements."
'
.., .f B. Failure to Implement Adequate Design Controls (VIO 98-01-02)
Reason for Violation North Atlantic agrees with the violation. In January 1998, Health Physics personnel I requested that Engineering provide a temporary means of diverting flow from the duct openings in both residual heat removal (RHR) pump rooms. Engineering provided an l
MA4.8 " Control of Temporary Equipment" evaluation that approved the diversion of the ventilation flow to minimize the potential spread of contamination from minor system i leakage through the bonnet studs of check valves RH-V4 and RH-V40. The MA4.8 evaluation did not provide details for the fabrication of the flow diverter. The flow diverter was emoved when the NRC questioned if the flow diverter restricted the air l flow. An Adverse Condition Report (ACR) was initiated after a preliminary review determined that the as installed flow diverter restricted air flo v. The reduction in cooling due to the flow diverter was analyzed and it was concluded that the small increase in room temperature would not adversely affect the environmentally qualified equipment in these areas. Interviews conducted with Engineering, Technical Support and Health Physics personnel as well as procedure reviews lead to the determination that this violation was caused 's a combination of failure to follow procedures and communication weaknesses.
The flow diverters were installed per Procedure MA4.8. This procedure provides a method for evaluating the potential damage to plant equipment from temporary equipment stored in the plant during a seismic event. The procedure states that it should not be used to bypass the Temporary Modification procedure (MA4.3) for operable systenu and equipment. MA4.8 was not the correct procedure to follow to implement this change. In MA4.3, examples ofitems that are temporary modifications are provided. One of the examples is a modification to ventilation that affects area air distribution supporting safety related equipment if not covered by an engineering evaluation. MA4.3 requires the preparation of a 10 CFR 50.59 evaluation in addition to a technical review sheet that requires the preparer to determine if the temporary modification will affect the environmental qualification of any safety related component.
Following the instructions in MA4.3 would have been the appropriate procedure to implement this change.
_
During the interview process, it became apparent that there was a communication weakness regarding the physical insta!!ation of the flow diverter. The flow diversion decision evolved over some time between members of Engineering, Technical Support
-
and Health Physics. A temporary modification, under the provisions of MA4.3 was considered and dismissed due to the perceived lack ofimpact on the operating system.
The engineering evaluation attached to the MA4.8 evaluation addressed the diversion of flow only. Again, additioni detail to enhance communication effectiveness, such as a sketch or description of the flow diversion, may have triggered a more in-depth evaluation focusing on the potential for adversely affecting the ventilation system functionality. Although MA4.8 has a program restriction "Do not use this procedure to L.______
- - . - - _ - - _ - - - - - - - - - - - - - _ - - - - - _ _ - - - - - -_ .
__
..., ..t l
.
bypass the temporary modification procedure (MA4.3) for operable systems or compone'nts", the personnel involved believed that diverting the flow would not adversely affect the operable system. The engineering evaluation did not discuss j reduction of flow since none was intended. !
Corrective Actions 1. The individuals involved were coached and counseled. This activity is complete.
2. The flow diverters were removed fmm the RHR pump rooms. This activity is ;
complete.
3. An analysis was performed that concluded the reduction in coolint due to the installation of the flow diverters has no safety significance. This activity is complete.
Date When Compliance Will Be Achieved North Atlantic is in compliance with 10 CFR 50. Appendix B Criterion III " Design Control."