IR 05000443/2013001

From kanterella
Jump to navigation Jump to search
ROP-14 2013 Seabrook Station Unit 1 Annual Assessment Letter, Report 05000443/2013001, and Inspection Plan
ML14062A021
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/04/2014
From: Michael Scott
Division Reactor Projects I
To: Walsh K
NextEra Energy Seabrook
DENTEL, GT
References
IR-13-001 IR-13-001
Download: ML14062A021 (5)


Text

UNITED STATES rch 4, 2014

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2013001)

Dear Mr. Walsh:

On February 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Seabrook Station, Unit No. 1 (Seabrook). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2013 through December 31, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Seabrook operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Seabrook during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green). On January 24, 2013, the NRC completed a supplemental inspection for a White finding that involved the failure of Seabrook Station personnel to adequately critique the performance of an evaluated emergency preparedness exercise. The NRC determined that Seabrook appropriately addressed the root and contributing causes, extent of condition and corrective actions. The White finding was removed from the assessment process at the end of the first quarter of 2013, resulting in Seabrook transitioning from the Regulatory Response Column to the Licensee Response Column of the NRC's Action Matrix. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

By letter dated October 9, 2013 (ADAMS Accession No. ML13274A670)1, the NRC closed the Confirmatory Action Letter (CAL) 1-2012-002 issued to you on May 16, 2012 (ADAMS Accession No. ML12125A1721)1 regarding actions taken and planned by NextEra to address the Alkali Silica Reaction (ASR) impacting safety-related reinforced concrete structures at Seabrook. Although NRC review of the CAL is complete, we will maintain a focused oversight

The NRCs Agencywide Document Access and Management System (ADAMS) accession number for the referenced document. The document is publicly available and retrievable through the ADAMS hyperlink provided at the end of this letter using this number. of NextEras actions to address this non-conforming condition through scheduled six-month inspection activities at Seabrook Station and the Ferguson Structural Engineering Laboratory at the University of Texas at Austin using Inspection Procedure 71152, Problem Identification and Resolution Inspection, annual sampling guidance. These inspection activities have been included in the attachment (Report 22) to this letter.

The enclosed inspection plan lists the inspections scheduled through June 30, 2015. Routine inspections performed by the resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction (TI) 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, and Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year (CY) 2014 will reflect this revision to Inspection Manual Chapter (IMC) 0310. The CY 2013 end-of-cycle assessments were conducted using the IMC 0310 guidance in effect in CY 2013 (dated October 28, 2011). Cross-cutting aspects identified in 2013 using the 2013 terminology will be converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Glenn Dentel at 610-337-5233 with any questions you have regarding this letter.

Sincerely,

/RA Eric J. Benner Acting for/

Michael L. Scott, Acting Director Division of Reactor Projects Docket No.: 50-443 License No.: NPF-86 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML14062A021 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME mmt MDraxton/GTD for via email GDentel/ GTD MScott/ EJB for DATE 02/26/14 02/28/14 02/28/14 Distribution w/encl:

W. Dean, RA D. Lew, DRA M. Scott, DRP E. Benner, DRP R. Lorson, DRS J. Trapp, DRS J. Clifford, DNMS J. Marshall, DNMS Actg G. Dentel, DRP R. Barkley, DRP M. Draxton, DRP B. Reyes, DRP P. Catalso, DRP C. Newport, DRP A. Cass, DRP D. Screnci, PAO N. Sheehan, PAO D. Schroeder, DRP A. Burritt, DRP G. Dentel, DRP F. Bower, DRP R. McKinley, DRP K. Mangan, DRP R. Powell, DRP A. Dimitriadis, DRS J. Noggle, DRS M. Gray, DRS P. Krohn, DRS J. Rogge, DRS D. Jackson, DRS E. Quinones, RI OEDO C. ODaniell, ORA L. Pinkham, DRP K. Heater, DRS T. Haverkamp, DNMS RidsNrrPMSeabrook Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource RidsNrrDirslpab Resource ROPAssessmentResource

Page 1 of 2 Seabrook 02/27/2014 13:55:57 Inspection / Activity Plan Report 22 01/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD HAZARD & ALARA 1 1 03/03/2014 03/07/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/03/2014 03/07/2014 IP 71124.02 Occupational ALARA Planning and Controls ASR - PI&R SAMPLE - ASR MONITORING 2 1 03/10/2014 03/14/2014 IP 71152 Problem Identification and Resolution TI 182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 1 03/17/2014 03/21/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 7111108P - INSERVICE INSPECTION 1 1 04/07/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP INSPECTION IP 71124.01, 02, 03 & 04 1 1 04/14/2014 04/18/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/14/2014 04/18/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 04/14/2014 04/18/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/14/2014 04/18/2014 IP 71124.04 Occupational Dose Assessment 71124 - RAD MONITORING INSTRUMENTATION 1 1 05/19/2014 05/23/2014 IP 71124.05 Radiation Monitoring Instrumentation TRI FI - TRIENNIAL FIRE PROTECTION 4 1 06/23/2014 06/27/2014 IP 7111105T Fire Protection [Triennial]

1 07/07/2014 07/11/2014 IP 7111105T Fire Protection [Triennial]

71152B - PI&R BIENNIAL 2 1 10/06/2014 10/10/2014 IP 71152B Problem Identification and Resolution 1 10/20/2014 10/24/2014 IP 71152B Problem Identification and Resolution 71124.08 - RADWASTE 1 1 08/18/2014 08/22/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ASR - PI&R SAMPLE - ASR MONITORING 2 1 09/15/2014 09/19/2014 IP 71152 Problem Identification and Resolution EP EXER - EP EXERCISE INSPECTION 2 1 11/03/2014 11/07/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 323EXAM - SEABROOK INITIAL EXAM 3 1 02/23/2015 03/27/2015 U01915 FY15-SEABROOK INITIAL OPERATOR LICENSING EXAM 1 03/23/2015 04/04/2015 U01915 FY15-SEABROOK INITIAL OPERATOR LICENSING EXAM 71151 - 71151PI VERIFY71124.01,.02,.03,.04 CLEAN 1 1 12/08/2014 12/12/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Seabrook 02/27/2014 13:55:57 Inspection / Activity Plan Report 22 01/01/2014 - 06/30/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71151 - 71151PI VERIFY71124.01,.02,.03,.04 CLEAN 1 1 12/08/2014 12/12/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 12/08/2014 12/12/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 12/08/2014 12/12/2014 IP 71124.04 Occupational Dose Assessment 1 12/08/2014 12/12/2014 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 12/08/2014 12/12/2014 IP 71151-PR01 RETS/ODCM Radiological Effluent ASR - PI&R SAMPLE - ASR MONITORING 2 1 03/02/2015 03/06/2015 IP 71152 Problem Identification and Resolution MODS - PERMANENT PLANT MODIFICATIONS 3 1 03/02/2015 03/06/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1 03/16/2015 03/20/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ISFSI - ISFSI OPERATION INSPECTION 1 1 04/13/2015 04/17/2015 IP 60855 Operation Of An ISFSI 1 04/13/2015 04/17/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 - RAD EFFLUENT CONTROL RETS 1 1 04/20/2015 04/23/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111107T - TRIENNIAL HEAT SINK 1 1 06/01/2015 06/05/2015 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.