IR 05000443/1998008

From kanterella
Jump to navigation Jump to search
Insp Rept 50-443/98-08 on 980921-25.No Violations Noted. Major Areas Inspected:Long Term MOV Program Under GL 89-10 Program at Seabrook Station & Will Review long-term MOV Program Under GL 96-05
ML20154Q999
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/16/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20154Q984 List:
References
50-443-98-08, 50-443-98-8, GL-89-10, GL-96-05, GL-96-5, NUDOCS 9810260132
Download: ML20154Q999 (14)


Text

.. . . _ . . _ ._. . . . _ _ _ _ _ _ _ . . _ . _ . . _ _ . -

l l .

l

.

U.S. NUCLEAR REGULATORY COMMISSION i I

l L REGION I .

(~

!

Docket No.: 50-443

,

License No.: NPF-86 l l l Report No.: 50-443/98-08 I l

Licensee: North Atlantic Energy Service Corporation l

Facility: Seabrook Generating Station, Unit 1 Location: Post Office Box 300 l Seabrook, New Hampshire 03874 l

l \

Inspection Period: September 21-25,1998 I

l l Inspectors: L. James, Reactor Engineer i

- Additional Participants: T. Scarbrough, Senior Mechanical Engineer l Mechanical Engineering Branch, NRR -  ;

M. Kotzalas, Mechanical Engineer

.

Mechanical Engineering Branch, NRR

!

l Approved by: Eugene M. Kelly, Chief, Division of Reactor Safety, Systems -

Engineering Branch l

l l

l l

'

i 9810260132 981016 -

! PDR ADOCK 05000443 G PDR <

.

i

_ . . _ . _ . .

. _-. -- . . .- -, __ _ . .- ...

~

.

EXECUTIVE SUMMARY Seabrook Generating Station, Unit 1 NRC inspection Report 50-443/98-08 The NRC is closing its review of North Atlantic Energy Service Corporation (NAESC)

Motor-Operated Valve (MOV) Generic Letter 89-10 program at the Seabrook Station and I will review the long-term MOV program under GL 96-05," Periodic Verification of Design- l Basis Capability of Safety-Related Motor-Operated Valves."

  • NAESC has demonstrated the design-basis capability of its safety-related MOVs, provided adequate justification for its assumptions of valve factor, stem friction !

coefficient, and rate of loading in its GL 89-10 program, and undertaken significant margin-improvement modifications to strengthen of their program.

  • NAESC implemented an effective tracking and trending program that had been visibly utilized to improve valve performance and reduce valvo failures. The scope and use of the tracking and trending program is considered a strength of the MOV Program.
  • NAESC's use of up-to-date industry test data to establish more conservative motor actuator capabilities was a notable engineering strength of the GL 89-10 program.

l l

l

1 11 l

. .. _ .. - . .- ._. -- - .- . .

.

.

TABLE OF CONTENTS PAGE TABLE O F C O NTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii E1 Motor-Operated Valve Program Review (Tl 2 515/10 9) . . . . . . . . . . . . . . . . . . . 1 E1.1 MOV Program Scope - (Closed) IFl 96-311-02, Scope Change for Thermal Barrier Cooling Valves ....................................1 E1.2 Technical Assumptions - (Closed) IFl 96-11-03, Justify Technical Assumptions Regarding Valve Factor, Stem Friction Coefficient, and Rate of Loading...............................................2 E1.3 MOV Performance Trending ................................4 '

E7 Quality Assurance in Engineering Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 E7.1 Independent Assessment ..................................5 E8 Miscellaneous Engineering issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 E8.1 (Closed) P2150-443/93-051 & 93-061 ........................5 E8.2 (Closed) P21 50-443/93-060. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 E8.3 Degraded Voltage Update . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 E8.4 Generic Letter 96-05," Periodic Verification of Design-basis Capability of Safety-Related Motor-Operated Valves" . . . . . . . . . . . . . . . . . . . . . . . . 6 E8.5 Generic Letter 95-07, " Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves" . . . . . . . . . . . . . . . . . . . . . . . . . 7 E8.6 MOV implementation Programs Year 2000 (Y2K) Readiness . . . . . . . . . . 8 E8.7 Fa cility Walkdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 V. M anagem ent Meeting s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 X1 Ex i t M e e t i n g . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 iii

- .- -- .- ~ . - ~ - . - - - - - . . . - - . - . -. - - . -

' l

. ,

Report Details Ill. Engineering l

E1 Motor-Operated Valve Program Review (Tl 2515/109) l l

l l

Backaround 1 On June 28,1989, the NRC issued Generic Letter (GL) 89-10, " Safety-Related Motor-Operated Valve Testing and Surveillance," requesting licensees to establish a - l program to ensure that switch settings for safety-related motor-operated valves (MOVs) were selected, set, and maintained properly. Seven supplements to the GL have been issued to provide additional guidance and clarification. NRC inspections of licensee actions implementing the provisions of the GL and its supplements have been conducted based on the guidance provided in NRC Temporary Instruction l 2515/109," Inspection Requirements for Generic Letter 89-10," which is divided into Part 1, " Program Review," Part 2, " Verification of Program implementation," .

and art 3, " Verification of Program Completion." I l

The NRC completed the Part 1 and 2 inspections in December 1991 as documented in NRC inspection Report (IR) 91-81 and in May 1994 as documented in NRC 1R ,

94-11, respectively. The Part 3 inspection (IR 96-11), conducted in the Fall 1996, l was unable to closecut the review of Seabrook's GL 89-10 program due to j concerns in the justifications for specific assumptions. This inspection was to I complete the verification of the Seabrook Station MOV program and to resolve remaining MOV open items.

E1.1 MOV Proaram Scope - (Closed) IFI 96-011-02, Scoce Chanae for Thermal Barrier '

Coolina Valves a. Insoection Scoce (2515-109/92701)

l l

The inspectors reviewed the justification for the removal of the reactor coolant '

pump thermal barrier component cooling water MOVs (3-inch 1500#, Velan flex-  ;

wedge gate valves) from the Seabrook GL 08-10 program. (IFl 50-443/96-11-02.)

b. Observations and Findinas l l

'

The reactor coolant pump thermal barrier component cooling water isolation valves were removed from the GL 89-10 program through Commitment Change Request 96-04. Since Seabrook has a unique cooling system design with an independent loop located inside the containment, the updated final safety analysis report (UFSAR) indicated that these valves are nonsafety-related and not credited in any accident analyses. Further, they do not provide a barrier for radiological release to the environment and are maintained deenergized during normal operation, with their breakers open at the respective motor control centers. Since these valves do not perform an active safety function, they are not required to be included in the GL 89-10 Program.

!

l

. , _ .

l

_ . ._____ _ _ _ _ _____ _______ _ ._ _ _ _ _.

..

e'

c. Conclusion

!

l The inspectors did not identify any concerns with the removal of the reactor coolant l pump thermal barrier component cooling water isolation valves from the GL 89-10 ;

l program. l

E1.2 Technical Assumotions - (Closed) IFl 96-11-03 Justifv Technical Assumptions Reaardina Valve Factor. Stem Friction Coefficient, and Rate of Loadina

!

8. InsDection Scooe  !

IR 96-11 documented concerns regarding the design-basis capability of some untestable MOVs based on insufficiently justified assumptions for valve factor, load sensitive behavior, and stem friction coefficient. The inspectors assessed North

! . Atlantic's justifications for assumptions used in MOV thrust calculations that form the basis for determining the design-basis requirements.

b. Observations and Findinas Valve Factors In response to the inspection findings in IR 96-11, NAESC prepared Engineering Evaluation (EE) EE-98-028," Update Of Valve Set Up Adequacy For Rising Stem Motor-Operated Valves That Are impractical To Dynamically Test," to evaluate the acceptability of technical assumptions for MOVs that are not practical to be dynamically tested under design basis conditions. This evaluation adjusted many valve factors to reflect test data from Seabrook and other sources. NAESC initiated an action report (AR 98-017657)to update EE SS-EV-960019," Valve Set Up Adequacy For Motor-Operated Valves That Are Impractical To Dynamically Test," to reflect the basis for the adjusted valve factors identified in EE-98-028.

NAESC indicated that the Electric Power Research Institute (EPRI) MOV Performance Prediction Methodology (PPM) will be applied to 10 untestable MOVs to provide additional support for thrust prediction and performance, including blowdown conditions where applicable. The MOVs to be evaluated using the EPRI PPM are:

  • RC-V122 and V124 - pressurizer power-operated relief valve (PORV) block valves;

-* CBS-V8 and V14 - containment sump isolation valves to the containment building spray (CBS) and residual heat removal (RHR) pumps;

  • CS-LCV112D and E - suction isolation valves from the refueling water l

~

storage tank (RWST) to the charging pumps; and

, _ , _ _ _ _. _,,

. . _ _ . _ . _ _ _ _ _ _ _ _ ____ _ __ _._ ._ __

.

-

!

3 i Stem Friction Coefficient

Based upon the evaluation of dynamic and static test data, NAESC increased its

stem friction coefficient assumption to 0.20 with the following two exceptions: j

,

.

(1)' the emergency feedwater (EFW) flow control valves use a stem friction l coefficient of 0.15 based on dynamic testing of Rotork actuator valves (2) RHR cold leg isolation valve to RCS loops 3 and 4 uses a stem friction coefficient greater than 0.20 based on actual test data Further, NAESC contracted an independent verification of its test data (Foreign Print 24863, issue 01, dated 10/6/98). The inspectors found the evaluation and independent verification to be sound and the stem friction coefficient assumptions I to be acceptable. I In response to concerns raised in IR 96-11, NAESC has justified its initial preventive maintenance and lubrication intervals of 2 refueling outages or 3 years (whichever is-longer) with provisions for reducing these intervals as necessary in Engineering Evaluation EE-98-030," Evaluation of MOV Preventative Maintenance Frequency for Actuator inspections." The inspectors concluded that NAESC adequately justified the preventative maintenance and lubrication intervals.

Rate of Loadina Foreign Print (FP) 24859,"MOV Rate of Loading Evaiuation," documents the basis for the evaluation of test data supporting the rate of loading assumptions. The rate of loading assumption for all untestable valves that close under torque switch l controlis increased by 5% for bias uncertainty and 20% for random uncertainty.

The stem friction coefficient of 0.20 (which bounds dynamic test data) accounts for load sensitive behavior in the opening direction and for limit control in the close

'

direction. An exception was the use of a reduced assumption for rate of loading for the EFW flow control valves which is based on specific test data, as described 1 above. Additional dynamic testing to provide further support for the rate of loading assumptions is planned for Refueling Outage 06. The inspectors considered the rate of loading assumptions to be acceptable.

Marain The inspectors reviewed EE-98-028, which identified the margin and available valve

- factor for gate and globe valves not dynamically tested in their safety direction, sample dynamic test information, which demonstrated the capability of dynamically tested gate and globe valves at Seabrook, and EE-98-029," Evaluation of NRC Generic Letter 89-10 Motor Operated Butterfly Valve Capability," which NAESC's demonstrates margin based on dynamic test data from 23 out of 28 butterfly valves. The inspectors considered NAESC's demonstration of margin for its GL 89-10 MOVs to be acceptable.

.

. _,,m +m"

. . . _ _ _ _ . ._ _ _ _ . _. _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ . _

lL

.

-4 in IR 96-11, the NRC noted the licensee's commitment to dynamically test 15 additional MOVs in order to obtain more site-specific performance data. The l inspectors found the licensee to be implementing those testing plans. Dynamic l MOV tests were conducted during RFO5 and additional tests are scheduled for RFO6. In addition to testing, NAESC has implemented modification to improve the design basis capabilities of several MOVs. Descriptions of the modifications are documented in Design Change Request (DCR)97-021,"RF05 Motor-Operated Valve Design Changes," and DCR 98-0009,"RFO6 Motor-Operated Valve Design l Changes."

c. Conclusions The inspectors concluded that NAESC has demonstrated the design-basis capability of its safety-related MOVs and provided adequate justification for its assumptions of l valve factor, stem friction coefficient, and rate of loading in its GL 89-10 program.

Inspection Follow-up item 50-443/96-11-03is closed. NAESC has undertaken significant margin-improvement modifications to strengthen of their MOV Program.

l E1.3 MOV Performance Trendina a. Insoection Scope

,

The inspectors reviewed Section 3.10 " Trending" of procedure ES 1850.003, l " Motor Operated Valve Performance Monitoring," to assess NAESC's program for tracking and trending of MOV failures and performance.

b. Observations and Findinas Procedure ES 1850.003 required both failure trending and performance trending of GL 89-10 MOVs. Specifically, Section 3.10.1, "MOV Failure Analysis Trending,"

required MOV failures that result in declaring the component inoperable be evaluated and documented in accordance with the Seabrook Station Operating Experience Manual. These failures are trended on an annual basis and documented in systems' annual performance reports. MOV failure trending data had been collected since 1988 and has shown significant improvement in demand failures of safety-related MOVs, re lucing the number of failures from 18 per year in 1988 to one in 1998.

The purpose of MOV performance trending, as documented in Section 3.10.6 of procedure ES 1850.003,is to ensure that switch settings remain adequate throughout the life of the plant. The scope of the trending program has been adequate ta detect meaningful trends in valve performance. The running load data gathered on the Fisher Controls batterfly valves was used to justify replacing the packing gland followers during RF03 and the running load data gathered since the l

'

replacement has shown marked improvement.

i l

,

i I

> , .--

-_ _ _ _ - _ _ _ _ ._.

_ . . - . - . - . - . - . - . - . , ~ - - -

. - - - - - . - - . . . - - . - - . - - .. - ..

,

'l l I

c. Conclusions L NAESC implemented an effective tracking and trending program that had been -

'

visibly utilized to improve valve performance and reduce valve failures. The scope and use of the tracking and trending program is considered a strength of the MOV Program.

E7' Ouality Assurance in Engineering Activities

_

, . E7.1. Indeoendent Assessment The inspectors reviewed the results of independent assessments conducted by the Nu?. lear Safety and Oversight Group during Seabrook's RFO4 and RFOS, and the act.ons taken to address issues identified. The review included the following d0cuments and associated findings followup: i

!

  • . ' Quality Assurance Surveillance Report lQASR) #95-00059, Engineering Activities completed in support of RFO4
  • - QASR # 97-0028, Perform Surveillance of MOV Differential Pressure Test Analysis process in support of RFOS
  • " Review of Modification Package DCR 97-021," dated May 22,-1997 The inspectors concluded that the Nuclear Safety and Oversight Group's assessment was technically detailed and the MOV personnel provided adequate follow-up.

E8- Miscellaneous Engineering issues E8.1 (Closed) P2150-443/93-051 & 93-061: Limitoraue Declutch System Anomalv The inspectors reviewed NAESC's response to the 10 CFR Part 21 notification submitted by the Limitorque Corporation on December 7,1992. Limitorque tested i the actuators under acceleration conditions of 7.6,4.6, and 4.8 g and discovered that a potential exists for a declutching malfunction to occur during sine dwell tests in the vertical axis of the operator, covering the range of frequencies between 10 and 21 Hertz. Washington Public Power Supply System performed additional seismic testing on the actuators which indicated that the declutching threshold is 4.8 p. No declutching occurred at multi frequency tests (in the range of 10 to 21 i Hertz) below 4.8 p.

, The safe shutdown earthquake for the Seabrook Station had a peak acceleration l. level of 0.25 p. The peak acceleration level for the operating basis earthquake was l 0.13 p. The magnitude of the seismic event required to produce the declutching l anomaly is greater-than the qualification magnitude of the earthquake conditions

! established for the Seabrook Station. The inspectors concluded that NAESC ( appropriately determined that this Part 21 notification did not apply at Seabrook.

!'

,

I 'h,

[-

l. - - , _ ._. _ - . , , ,_. ~ ._. _ _. -- .. . _ _ . - - ~ _

_

-

.

.

E8.2 (Closed) P2150-443/93-060: Limitoraue Housina Cover Screws The inspectors reviewed the 10 CFR Part 21 notifications dated October 1992, and November 23,1992, regarding Limitorque SBD-1 housing covers and mounting bolts. By letter dated November 23,1992, Limitorque excluded the SB-1 actuators.

Thread engagement of the screws for the housing cover only allowed for an overload factor of the actuator of 2.24 times the thrust rating, while Limitorque permitted a stall thrust of 2.5 times the Limitorque rating for one time only.- The recommended corrective action was for licensees to determine if SBD-1 actuators could develop stall thrusts above the 2.24 times rating in particular applications and, if so, replace the existing 6.5 inch screws with screws 7.0 inch screws.

NAESC determined that there were no affected SBD-1 actuators at Unit 1 and any actuator in storage or in the unfinished portions of Unit 2 will be reviewed under procedure PMS.4, " Obtaining U2 Materials," which establishes guidance governing the pre.ctice of obtaining materials from Unit 2 nr use in Unit 1. After reviewing the unit 1 valve list and Procedure PM5.4, the inspectors concluded that NAESC ;

appropriately determined that this Part 21 notification of potential defective housing '

cover mounting screws for Limitorque size SBD 1 motor operators did not affect the MOVs in use at Seabrook.

E8.3 Dearaded Voltaae Uodate NAESC re-evaluated the degraded valtage capability of its safety-related MOVs beginning at the degraded grid relay setpoint and revised Calculation 9763 3-ED-00-02-F (Revision 6,' February 20,1998), " Voltage Regulation," which performed I voltage drop studies for safety-related MOVs at the degraded bus voltage setpoints. !

NAESC justified the degraded voltage evaluation for specific MOVs in EE-98-028. l The inspectors reviewed the calculation and evaluation and concluded the actions ;

taken were appropriate and the degraded voltage calculations were acceptable.

E8.4 Generic Letter 96-05 " Periodic Verification of Desian-basis Caoability of Safetv-Related Motor-Ocerated Valves" In a letter dated April 8,1998, NAESC updated its response to GL 96-05, " Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves." j As discussed in that letter, NAESC is participating in the Joint Owners Group (JOG) '

Program on MOV Periodic Verification. NAESC is following the JOG program i described in the Westinghouse Owners Group Topical Report MPR-1807 (Revision '

2, July 1997), " Joint BWR, Westinghouse and Combustion Engineering Owners'

Group Program on Motor-Operated Valve (MOV) Periodic Verification," and the NRC safety evaluation on the JOG program dated October 30,1997.

The scope of NAESC's long-term MOV program is consistent with the I recommendations of GL 96-05. As described in an internal NAESC memorandum dated October 1,1998, NAESC performed risk ranking of its safety-related MOVs

"'

and evaluated its method to ensure consistency with the methodology described in Westinghouse Owners Group Engineering Report V-EC-1658, " Risk Ranking

. . . ._- . .. . - - _ _ . _ _ _ . _ _ _ _ _ _ . _ _ _ . _ . _ _ . _ . . _ _ . _ _ . . _ _ _

.

l

.

i i. Approach for Motor-Operated Valves in Response to Generic Letter 96-05," and the j limitations and conditions in the NRC Safety Evaluation dated April 14,1998. The i inspectors discussed the MOV risk ranking methodology applied at Seabrook with NAESC and NRR probabilistic risk assessment (PRA) staff. The inspectors noted that NAESC had lowered the risk ranking of the pressurizer PORV block valves MOVs RC-V122 and V124 from the Medium to the Low risk category based on the improvements in MOV performance resulting from implementation of the GL 89-10 program.

NAESC has established a program for trending of motor actuator output and has incorporated the guidance in Limitorque Technical Update 98-01 and its Supplement 1 by applying a Commonwealth Edison Company (Comed) methodology to evaluate MOV motor actuator output. NAESC indicated that any changes to the Comed '

methodology resulting from the new guidance on motor actuator output will be addressed in its MOV program. - NAESC's use of up-to-date industry test data to establish more conservative motor actuator capabilities was a notable engineering strength of the GL 89-10 program.

Within the scope of the review performed on site, the inspectors concluded that the actions to date by NAESC were appropriate, and no technical concerns were identified. The NRC Office of Nuclear Reactor Regulation (NRR) will use this

information in prepanng a safety evaluation on NAESC's response to GL 96-05. j

'

l E8.5. ' Generic Letter 95-07. " Pressure Lockina and Thermal Bindina of Safetv-Related Power-Operated Gate Valves" The inspectors reviewed NAESC's actions to address pressure locking and thermal

binding of safety-related gate valves. The following documents were reviewed

i

  • Operations procedure OX1406.02," Containment Spray Pump and Valve Quarterly Operability & 18 Month Position Indication Testing"
  • Operations procedure OS1000.04," Plant Cooldown from Hot Standby to Cold Shutdown"
  • DCR 95-023," Valve Modifications to Prevent Pressure Locking"
  • MMOD 95-509,"CBS Sump Isolation Valve Modifications" An engineering evaluation performed by NAESC identified 14 valves that were subject to pressure locking and/or thermal binding. Modifications were performed on 10 valves to alleviate the potential for problems. For the remaining four valves, operating procedures were revised.

NAESC determined that valves RC-V22N23N87N88,RH-V32N70, and SI-V77N102 were potentially subject to liquid entrapment pressure locking. Valves RC-V22N23N87N88,and RH-V32N70 were also potentially subject to differential l

j pressure locking. The design changes described in DCR 95-023 provide a vent path

! from the bonnet cavity of these valves back to the process fluid line, via the valve j. stem leakoff connection.

. . ._ _ ._ .. -. . _ _ _

- - - . - .- . .-. . . . - .- . . . - . - . - - - , - - - ~ . . . .- --

'

!

l'

l i

l Containment sump isolation valves CBS-V8 and CBS-V14 had also been identified by NAESC as susceptible to pressure locking. It was postulated that if liquid became entrapped in the valve bonnet and was subsequerdy heated due to the-

! increased temperature following a loss of coolant accident, the valve could be prevented from opening due to excessive bonnet pressure. Modification MMOD 95-509 provided a vent path for the bonnet pressure to the upstream piping to ensure the continued capability of these valves.

Operation procedure OX1406.02 noted that valve CBS-V11 had been identified as

,

being susceptible to pressure locking and thermal binding. Operators were directed

!

in the procedure to cycle the valve followinq a containment building sump pump run j to eliminated the potential for the phenomena to occur.

Precaution 3.19 of operating procedure OS1000.04 warns the operators that the 4 power operated relief valve (PORV) block valves, RC-V122 and RC-V124, are  !

susceptible to thermal binding. It states that if a PORV block valve is closed at

'

l . temperature and a subsequent cooldown is undertaken, the block valve is I

considered to be inoperable.

l Within the scope of the review performed on site, the inspectors found the susceptible valves were properly screened, the modifications performed were appropriate, the technical approaches (including calculations) were sound, and no valve functionality problems were identified. The NRR will use this information in .

preparing a safety evaluation on NAESC's response to GL 95-07.

E8.6 MOV lmolementation Proorams Year 2000 (Y2K) Readiness The NRC issued information Notice 98-30,"Effect of the Year 2000 Computer Problem on NRC Licensees and Certificate Holders," to remind all licensees of the potential problems their computer systems and software may encounter as a result of the change to the year 2000. NAESC established a Y2K readiness team to review the computer systems and software for Y2K readiness. The inspectors verified that the MOV diagnostic and trending software were considered by the Seabrook Y2K readiness team and a schedule was in place for those software applications not Y2K compliant.

E8.7 Facility Walkdown The inspectors completed a facility walkdown and surveyed MOVs for position of actuators, potential grease leakage, plugging of the "T" drains in the motor casing, and general facility housekeeping. Two items were identified requiring NAESC action. Work Request 98-14851 was generated to determine the source of the grease leak in the actuator of service water valve 1-SW-V-20, and an Adverse

. Condition Report was generated and completed to address improperly installed insulation blankets on the yoke structures of valves 1-AS-V-176 and 176. Upon notification, NAESC took appropriate action to address concerns. >

l

!

,, _ , .,, ,. --

_

. - - . - - ~ . - - - . - . - - - . - - . - . - . . - . - . . - - . . . - -

..

.

'

V. Manaaement Meetinas-X1- Exit Meseting The inspectors presented the inspection results to members of licensee management, following the conclusion of the inspection on September 25,1998.

NAESC acknowledged the findings presented. Based on findings from this and previous inspections and the identified MOV actions to be performed by NAESC, NRC is closing its review of the GL 89-10 program at Seabrook and will review NAESC's long-term MOV program under GL 96-05.

l

't PARTIAL LIST OF PERSONS CONTACTED i North Atlantic Enerav Service Corooration

- P. Brown, Senior Engineer R. Faix, Engineering Supervisor M. Ossing, Senior Project Engineer P. Searfoorce, MOV System Engineer

' G. Sessler, Project Engineer

Nuclear Reaulatorv Commission R. Lorson, Senior Resident Inspector L. James, Reactor Engineer, Region I, DRS/SEB T. Scarbrough, Senior Mechanical Engineer, EMEB/NRR M. Kotzalas, Mechanical Engineer, EMEB/NRR INSPECTION PROCEDURES USED c.

'

TI-2515/109 Inspection Requirements for Generic Letter 89-10, " Safety-Related Motor-Operated Valve Testing and Surveillance" IP 92701 Follow-up ITEMS OPENED, CLOSED, AND DISCUSSED Closed 50-443/93-051 P21 Limitorque Declutch Anomaly 50-443/93-060 P21 Limitorque Housing Cover Screws 50-443/93-061 P21 Limitorque Declutch Anomaly 50-443/96-011-02 IFl Review MOV Program Scope Change for Thermal Barrier Cooling Valves 50-443/96-011-03 IFl Justify Technical Assumptions regarding Valve Factor, Stem Friction Coefficient, and Rate of Loading

._ - ._ . . _ . -_._ _ . _ _ _ _ _ _ .._ _. _ _ ..._ _ _ _ _ . ___. . _

_ 4

, .

PARTIAL LIST OF DOCUMENTS REVIEWED Commitment Change Request 96-04, " Deletion of Thermal Barrier Loop Motor Operated

, Valves from NRC Generic Letter 89-10 Test Program," dated 9-23-96 DCR 95-023," Valve Modifications to Prevent Pressure Locking,"

DCR 97-0021, Design Change Notice 12, "RF05 Motor-Operated Valve Design

! Changes," dated 10/97

EE 98-028,"Updato Of Valve Set Up Adequacy For Rising Stern Motor-Operated Valves That Are impractical To Dynamically Test", Revisio10, dated 9/98 EE-98-029," Evaluation of NRC Generic Letter 89-10 Motor Operated Butterfly Valve Capability," Revision 1, dated 9/98.

EE-98-030," Evaluation of MOV Preventive Maintenance Frequency for Actuator Inspections," Revision 00, dated 9/98.

ES 1859.003," Motor Operated Valve Performance Monitoring," Rev. 02, dated 3/24/97 Foreign Print 24859,"MOV Rate of Loading Evaluation," dated 9/98.

Foreign Print 24863,"Seabrook MOV Stem Friction Data," dated 10/98.

MMOD.95-509,"CBS Sump Isolation Valve Modifications"

" Nuclear Safety Oversight Integrated Refueling Outage Report (OR05)," dated 7/97

- Operations procedure OX1406.02," Containment Spray Pump and Valve Quarterly Operability & 18 Month Position Indication Testing," Rev. 09 Chg. 04 Operations procedure OS1000.04," Plant Cooldown from Hot Standby to Cold Shutdown,"

Rev. 06 Chg. 05 PM5.4, " Obtaining U2 Materials," Rev.17 Chg. 01 Quality Assurance Surveillance Report 97-0028," Perform Surveillance of Motor Operated 4-Valve Differential Pressure Test Analysis process in support of OROS," dated 7/11/97 Quality Assurance Surveillance Report 95-00059," Engineering Activities completed in support of OR04"

, " Review of Modification Package DCR 97-021," performed by Duke Engineering & Services,

dated 5/22/97

! SE-EV-960019," Valve Set Up Adequacy for Motor-Operated Valves that are impractical to Dynamically Test," Revision 1, dated 10/96 '

SE-EV-96-0020," Evaluation of Differential Pressure Conditions for Motor-Operated

Valves," Revision 0, dated 9/96 r

i i.

.- ,, e -- , - - --n.. --=,

- , - - _ - - . - - - . . .. -. .

. . .-.

s a

.

LIST OF ACRONYMS CBS containment building spray Comed Commonwealth Edison Company CS charging system

' DCR design change request EE' engineering evaluation EFW Emergency Feedwater EPRI Electric Power Research Institute p: acceleration of gravity (you remember,9.81 m/sec a j GL Generic Letter IFl inspection Follow-up Item IR inspection Report MOV Motor-Operated Valve NAESC North Atlantic Energy Service Corporation P21. 10 CFR Pan 21 PDR Public Document Room PORV- power-operated relief valve 1 PPM MOV Performance Prediction Methodology

- RFO refueling outage RCS reactor coolant system ,

RHR residual heat removal  :

RWST refueling water storage tank UFSAR Updated Final Safety Analysis Report Y2K- Year 2000 j

j r

l

..