March 4, 2011
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SEABROoK STATIoN, UNIT 1 (05000443 t2010001)
Dear Mr. Freeman:
On February 10, 2011, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Seabrook Station, Unit 1 (Seabrook). The NRC reviewed the most recent quarterly performance indicators (Pls), in addition to inspection results and enforcement actions from January 1,2010, through December 31,2010. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Seabrook operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Seabrook during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the
-
nominal, expected range (i.e., green).
Plant performance for the first and second quarter of 2010 was within the Regulatory Response column of the ROP Action Matrix, because of one inspection finding with low to moderate (i.e.,
white) safety significance. The White finding, (ML093160351)1, involved the failure to establish adequate design control measures to modify a cooling water flange on the B emergency diesgl generator (EDG), which led to the failure of the diesel during a test on February 25, 2009. To review your actions to address the White finding in June 2010, the NRC completed a suppfemental inspection using Inspection Procedure 95001, "lnspection for One or Two White Inputs in a Strategic Performance Area." As discussed in our mid-cycle performance assessment letter dated September 1, 2010, (ML102440395), the finding was closed based on the satisfactory results for that inspection (M1102250493), and, therefore, was no longer considered for plant assessment purposes as of July 1, 2010. Seabrook returned to the I Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS. Licensee Response column of the NRC's Action Matrix on July 1,2010, and the NRC plans to conduct ROP baseline inspections at your facility in 2011'
The enclosed inspection plan lists the inspections scheduled through June 30, 2012' Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections iisted during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
As discussed in our mid-cycle assessment letter (ML102440395), an Operational Safety Review Team (OSART), performed by senior statf members from the InternationalAtomic Energy Agency (1AEA); witt ne condutted at Seabrook in June 2011. The scope of the OSART evaluaiion may encompass portions of the ROP baseline inspection program. NRC lnspection Manual Chaptbr 2515,'section 08.05, "Baseline Inspection Credit for Operational Safety Review Team Effort,; allows a reduction in baseline inspection in those areas that are determined to overlap with the OSART review. lf the results of the OSART, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.
ln accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records'(PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http:/lwww.nrc.qov/readinq-rm/adams'html (the Public Electronic Reading Room).
please contact Arthur Burritt at 610-337-5069 with any questions you have regarding this letter'
Sincerely, Docket Nos. 50-443 License Nos. NPF-86 cc w/encl: Distribution via ListServ Seabrook Station Inspection/Activity Plan Darrell J.
rts, Director Licensee Response column of the NRCs Action Matrix on July 1,2010, and the NRC plans to conduct ROP baseline inspections at your facility in 2011.
The enclosed inspection plan lists the inspections scheduled through June 30, 2012. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
As discussed in our mid-cycle assessment letter (Mt102440395), an Operational Safety Review Team (OSART), performed by senior staff members from the lnternationalAtomic Energy Agency (IAEA), will be conducted at Seabrook in June 2011. The scope of the OSART evaluation may encompass portions of the ROP baseline inspection program. NRC lnspection Manual Chapter 2515, Section 08.05, "Baseline Inspection Credit for Operational Safety Review Team Etfortl'allows a reduction in baseline inspection in those areas that are determined to overlap with the OSART review. lf the results of this evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.
f n accordance with 1O CFR 2390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Please contact Arthur Burritt at 610-337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Darrell J. Roberts, Director Division of Reactor Projects Docket Nos. 50-443 License Nos. NPF-86 cc w/encl: Distribution via ListServ Seabrook Station Inspection/Activity Plan Distribution: See attached Page SUNSI REVIEW COMPLETE: LC (Reviewer's initials)
MLl10620296 DOC NAME: S:\\ROP-11 EOC REVIE\\ ABRANCH 3\\LETTERS\\SEABROOK - ANNUAL ASSESSMENT LETTER REVI.DOCX After declaring this document "An Otficial Agency Record" it yg!!!be released to the Public.
To receive a copy oithis document, indicate in the box: 'C'= Copy w/ attachmenUenclosure 'E' = Copy dattachmenUenclosure "N'= No coPY 03t 01 111 OFFICIAL RECORD COPY
Page 1 of 2 0310112011 Repoft22 O8:.22:37 Seabrook 1 Inspection / Activity Plan 0110112011 - 0613012012 Unit Number No. of Staff on Site
- OCC RAD SAFEW
1
1 01t24t2011 01t24t2011 03t07t2011 03t21t2011 04104t2011 04t25t2011 04t25t2011 05t09t2011 07t25t2011 o8t08t2011 o9112t2011 o9112t2011 o9112t2011 12t05t201'l 11t28t2011 11t28t2011 11t28t2011 1'U28t2011 1112812011 11128t20't1 11128t2011 121O4t2011 12t04t2011 12t04t2011 121O412011 01128t2011 01128t2011 03111t2011 o3t25t2011 o4t15t2011 04t29t2011 44t29t2011 0511312011 07t29t2011 08t12t2011 09t16t2011 09t16t2011 ogt16t2011 12t09t2011 12t02t2011 121O2t2011 12t02t2011 121Ozt2011 12t02t2011 12t02t2011 12tO2t2011 12t09t201'l 12t09t2011 12t09t2011 12t09t2011 tP 7111402 tP 7111403 lP 7111404 lP 7111405 tP 71151-EP01 tP 71151-EP02 tP 71 151-EP03 71124
- OCC RAD SAFEW lP 71124-01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational ALARA Planning and Controls 71002
- LR TNSPECTTON lP 71002 License Renewal Inspection lP 71002 License Renewal Inspection 7111108P - lNSERVTCE INSPECTTON lP 71 1 1 108P Inservice InsDection Activities - PWR 71124-OCCRADSAFEW lP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.04 Occupational Dose Assessment 7112492 -ALARA lP 71124.02 Occupational ALARA Planning and Controls TRI FIRE - TRIENNIAL FIRE PROTECTION INSPEGTION lP 7111105T Fire Protection lfriennial]
lP 71 1 1 105T Fire Protection firiennial]
71124
. REMP lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 7'1124.02 Occupational ALARA Planning and Controls lP 71124.07 Radiological Environmental Monitoring Program 7111118 - SEABROOK REQUAL INSP w/ P/F RESULTS lP 71111118 Licensed Operator Requalification Program EP PROGR - EP PROGRAM INSPECTION Alert and Notification System Testing Emergency Preparedness Organization Staffing and Augmentation System Emergency Action Level and Emergency Plan Changes Conection of Emergency Preparedness Weaknesses and Deficiencies Drill/Exercise Performance ERO Drill Participation Alert & Notification System
- EFFLUENTS & ISFSI Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls Radioactive Gaseous and Liquid Effluent Treatment 71124 tP 60855.1 lP 71124.01 tP 71124.02 tP 71124.06 fThis report does not include INPO and OUTAGE activities.
I This report shows only on-site and announced inspection procedures.
_*_.E-
Page 2 ot 2 0310112011 O8:22:37 Report 22 Seabrook 1 Inspection I Activity Plan 0110112011 - 0613012012
1
71124
- OCC RAD SAFEW 0113012012 0210312012 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 0113012012 0210312012 tp 71124.02 Occupational ALARA Planning and Controls 0113012012 O2lO3l2O12 tp 71124.04 Occupational Dose Assessment MODS
. PERMANENT PLANT MODIFICATIONS 0311212012 0311612012 lP 71111flf Evaluations of Changes, Tests, or Experiments and Permanent flant Modifications 0312612012 0313012012 lP 7111117f Evaluations of Changes, Tests. or Experiments and Permanent Plant Modifications EP EX
- EP EXERCISE EVALUATION 0411612012 0412012012 lP 7111401 Exercise Evaluation 0411612012 O4l2Ol2O12 lP 7111404 Emergency Action Level and Emergency Plan Changes 71124
- RMS Radiation Monitoring lnstrumentation ldentification and Resolution of Problems ldentification and Resolution of Problems 0511412012 0611112012 06t25t2012 05t18t2012 06t15t2012 06t29t2012 lP 71124.05 711528 - Pt&R lP 711528 tP 711528 Unit Number No. of Staff on Site 71124 This report shows only on-site and announced inspection procedures