Forwards LER 98-010-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr
ML20217A010
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 03/16/1998
From: Sager D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217A015 List:
References
SVP-98-090, SVP-98-90, NUDOCS 9803240204
Download: ML20217A010 (2)


LER-2098-010, Forwards LER 98-010-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr
Event date:
Report date:
2542098010R00 - NRC Website

text

8 Commonwealth I Ahwn Company Quad Citics Generating Station

, 22710 206th Asenue Norih

.' Cordova. 11.61242 9740 Tel 309M4 2241 b~ <

SVP-98-090 March 16,1998 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29, Unit One Enclosed is Licensee Event Report (LER)98-010, Revision 00, for Quad Cities Nuclear Power Station.

This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 50.73(a)(2)(i)(B). The licensee shall report any operation or condition prohibited by the Plant's Technical Specifications.

The following commitments are being made by this letter:

Training will be given to the Engineering Programs personnel on the significance of the PM predefine critical date and the importance of compliance to TS requirements. Due Date: 052998.

Review and validate Engineering Programs TS Surveillances to ensure they have correct credit dates. Prior to restart of either unit, currently scheduled 041298. T Benchmark with Comed Snubber PEER Group to verify inspection il methodology and validating of surveillance dates. Due Date: 052998.

g

!!A*1888A!!88a6 S PDR h t

I A 1'nicom Compan) h t

USNRC SVP-98-090 2 March 16,1998 If there are any questions or comments concerning this letter, please refer them to Charles Peterson, Regulatory Affairs Manager at 309-654-2241, ext. 3609.

Respectfully, David . Sager Site V ce' President Quad Mes Station DAS/CP/ptm Enclosure -

cc: A. B. Beach, Regional Administrator, Region III R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company M. E. Wagner, Licensing, Comed F. A. Spangenberg, Regulatory Affairs Manager, Dresden INPO Records Center