ML20245E934

From kanterella
Revision as of 09:09, 15 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Preliminary Draft Rept Assessing Adequacy of Siren Coverage as Presented in Plant Alert & Notification Rept. Alerting Coverage Determined as Adequate.W/O Encl
ML20245E934
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 01/23/1989
From: Krimm R
Federal Emergency Management Agency
To: Congel F
Office of Nuclear Reactor Regulation
Shared Package
ML20245E936 List:
References
NUDOCS 8902020304
Download: ML20245E934 (1)


Text

. _ _ _ . . .- _ - _ . - -_---- _

(ff  ; -

r g g Washington, D.C. 20472 y

.JAN 2 3 99E MEMORANDUM FOR: Frank J. Congel '

-Director ~

DivisionLof Radiological Protection and Emergency: Preparedness .

l

. Office of. Nuclear Reactor Regulations U. . Nuclear Regulatory Commission FROM:' ch r .. $6[

Assistant Associate Director-Office of Natural and Technological Hazards SdBJECT: Preliminary Review of the.Seabrook Station Alert and Notification System The Federal Emergency Management Agency (FEMA) has completed the

. preliminary technical . review of the Seabrook Station alert ~ and notification system: (ANS). A preliminary draft report assassing

.the adequacy;of'the siren coverage'_as. presented in the'Seabrook ANS' Design Report has - been - completed and forwarded to the FEMA RAC-Chairman for-Seabrook'for review. A copy of this preliminary '

report is enclosed for your information..

Preparation ' of a preliminary ANS report is the first step in FEMA's . ANS . review process. If the ANS - alerting coverage is determined to be adequate in the preliminary technical' analysis,

-a' -

telephone survey of households in the emergency planning zone is conducted following a full activation of the ANS to determine the' percentage of the population directly alerted by_the system.

After-the telephone survey a final draft report incorporating the

-results of the-survey is prepared for Regional review.

~

Once all FEMA REP-10' requirements are satisfied, a final report is issued to NRC along with . a finding on the adequacy of the ANS. Our

. preliminary. technical analysis indicates that the Seabrook . ANS desian as presented in the FEMA REP-10 submission is adequate; however, as you are aware, the system enhancements remain to be completed in New Hampshire and deployment of the Vehicular Alert and Notification System (VANS) remains to be completed in

. Massachusetts.

We .are currently waiting for approval from the Office of Management and Budget (OMB) to conduct the four remaining telephone surveys in our alert and notification system review program; however, we expect OMB approval in the near future.

When we are closer to establishing a date for the ANS survey we may be requesting your assistance to help coordinate the arrangements.

If you'have any questions, please call me at 646-2871.

1 l~,. M hh h r V L ~ z _ - _- - _ -_ _ _ _ _ _ - - - _ _ _ _ _ - .