Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210K3281999-07-30030 July 1999 Forwards Response to NRC RAI Re License Amend Request 98-17. North Atlantic Concurs with Staff That Bases Should State That Maintaining ECCS Piping Full of Water from RWST to Reactor Coolant Sys Ensures Sys Will Perform Properly ML20210H8991999-07-27027 July 1999 Forwards Tabulation of Current LBLOCA & SBLOCA Peak Clad Temp Margin Utilization Tables Applicable to Seabrook Station ML20210H0921999-07-27027 July 1999 Forwards Naesc Semi-Annual Fitness-for-Duty Rept,Jan-June 1999, Per 10CFR26.71(d).Rept Includes Data from 990101- 0610 ML20210S9911999-07-18018 July 1999 Requests NRC Intervene for All Shareholders of New England Electric System & to Help with Merger with National Grid Group & That NRC Petition Security & Exchange Commission to Investigate Matter Relative to No Shareholder Options ML20210A2521999-07-15015 July 1999 Forwards Rev 33 to Seabrook Station Radiological Emergency Plan & Rev 84 to Seabrook Station Emergency Response Manual ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1351999-07-0909 July 1999 Forwards Relief Request Re Repair Welding on SA-351 Matl to Be Installed in Seabrook Station SW Pumps & SW Cooling Tower Pumps ML20209D2871999-07-0606 July 1999 Submits Response to NRC AL 99-02,re Numerical Estimate of Licensing Actions Expected to Be Submitted in Fy 2000 & 2001.Schedule Does Not Include Activities Which Meet AL Definition of Complex Review ML20209C9021999-06-30030 June 1999 Provides Revised Distribution List for Seabrook Station Correspondence to Reflect Current Organization ML20196G2391999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant Encl ML20196G3381999-06-23023 June 1999 Forwards LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20195J0981999-06-17017 June 1999 Forwards Responses to Questions Posed in Re Application of New England Power Co for Transfer of Control of Licenses NPF-49 & NPF-86.Copy of 1998 Schedule 13G, Included,As Requested ML20196D0561999-06-16016 June 1999 Forwards Certified Copy of Endorsements 77 & 78 to Nelia to Policy NF-0296 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195J1221999-06-15015 June 1999 Forwards Addl Clarifying Info to Suppl Info Provided at 990602 Predecisional Enforcement Conference at Region I. Proprietary Declarations by Util Employees to Correct Inaccuracies Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210K4971999-06-15015 June 1999 Forwards Copy of Ltr from Concerned Constitutent AC Menninger from Franconia,Nh to Senator Smith Re Seabrook Nuclear Power Station Y2K Readiness ML20195E9731999-06-0707 June 1999 Forwards Rev 32 to Seabrook Station Radiological Emergency Plan & Rev 83 to Emergency Response Manual ML20206T4201999-05-20020 May 1999 Forwards Certified Copies of Resolution Adopted by Shareholders of National Grid Group Approving Acquisition of New England Electric Sys & Vote of New England Electric Sys Shareholders Approving Merger with National Grid Group ML20196L2001999-05-0707 May 1999 Forwards Rev 01-07-00 to RE-21, Cycle 7 COLR, Per TS 6.8.1.6.c ML20206K4301999-05-0707 May 1999 Forwards Copy of Corrective Order of Notice by State of Nh Nuclear Decommissioning Financing Committee ML20206J3321999-05-0505 May 1999 Forwards Tabulation of Number of Tubes Plugged in Each of Two SGs Inspected During Sixth Isi,Per Plant TS SR 4.4.5.5a. Sixth ISI Was Completed on 990420 ML20206J3341999-05-0505 May 1999 Informs That on 990501,ISO New England & New England Power Pool Implemented Restructured Wholesale Electricity Market. Summary of Util Action as Result of Implementation of Subject Market,Encl ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206G4371999-04-30030 April 1999 Forwards 1998 Annual Environ Operating Rept for Seabrook Station.Encl Rept Is Summary of Implementation of EPP for Period of Jan-Dec 1998 ML20206H4801999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Seabrook Station. Listed Info Provided in Encls 1999-09-08
[Table view] Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
MONTHYEARML20059K2881990-09-0707 September 1990 Forwards ERCI-R/88-76, Seabrook Station Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification ML20059B8721990-08-22022 August 1990 Forwards Affidavits & FEMA Rept Concluding That State of Nh Emergency Response Capability Adequate,Per 900803 Request ML20055G7541990-07-19019 July 1990 Responds to 900626 Request for Assistance in Verifying Completion of Emergency Planning Items in CLI-90-03 ML20059E6261990-06-19019 June 1990 Forwards State of Nh Describing Training for Decisionmaking Strategy for Emergency Response Planning Area a & Elsewhere.Fema Believes That State of Nh Training Program Adequate ML20042E1361990-02-0909 February 1990 Forwards Review & Evaluation of State of Nh Radiological Emergency Response Plan for Seabrook Station & Rept on Status of Corrective Actions First Exercise & Drill Cycle 1988-1994 of States of Me & Nh & New Hampshire Yankee.... ML20006B7701990-01-12012 January 1990 Provides Addl Response to NRC 891117 Request for Status Rept from FEMA on Readiness of Plant Public ANS ML20005D9761989-12-21021 December 1989 Updates 891211 Response to NRC 891206 Request for Assistance in Verifying Resolution of Items in ASLB Partial Initial Decision LBP-89-32,issued 891113,in Connection W/Spmc & 1988 FEMA Graded Exercise ML20005E0101989-12-18018 December 1989 Responds to 891117 Request for Status Rept on Readiness of Plant Alert & Notification Sys,Including Vehicular Alert & Notification Sys for Commonwealth of Ma Portion of Plume Epz.Sys Design for State of Nh Portion Acceptable ML19332G1311989-12-11011 December 1989 Responds to 891206 Request That FEMA Assist NRC to Verify Satisfactory Resolution of Emergency Planning Items Specified by Seabrook ASLB Partial Initial Decision LBP-89-32.FEMA Status Rept Encl ML19332G0901989-12-11011 December 1989 Updated Response to 890905 Ltr Re Request That FEMA Assist NRC in Verifying Fulfillment of Conditions Specified by ASLB in Connection W/Offsite Plans & Preparedness for Util Portion of Plant EPZ ML19332C4001989-11-17017 November 1989 Responds to 890905 Request for Assistance in Verification of Fulfillment of Certain Conditions Specified by Plant Aslb,In Connection W/Offsite Plans & Preparedness for State of Nh Portion of Plant Epz.Status Rept Re State of Nh Encl ML20247J0831989-08-25025 August 1989 Forwards Constituent to Gj Humphrey Re Nuclear Reactor Technology ML20248F9601989-04-0303 April 1989 Forwards Gc Peterson to V Stello Re Requirement That Offsite Radiological Emergency Response Plans Provide Capacity to Monitor 20% of Population of EPZ within 12 H.W/ Certificate of Svc ML20247C7141989-03-16016 March 1989 Approves State of Me Ingestion Pathway Plan for Plant in Accordance w/44CFR350.12 of FEMA Rule ML20236A5091989-03-0707 March 1989 Forwards Lh Mcpheters Notice of Appearance for Plant Offsite Planning Hearing.Certificate of Svc Encl ML20245E9341989-01-23023 January 1989 Forwards Preliminary Draft Rept Assessing Adequacy of Siren Coverage as Presented in Plant Alert & Notification Rept. Alerting Coverage Determined as Adequate.W/O Encl ML20155H4201988-10-14014 October 1988 Forwards Review & Evaluation of Seabrook Plan for Commonwealth of Ma Communities, Dtd Oct 1988.Certificate of Svc Encl ML20207N8321988-10-14014 October 1988 Forwards Review & Evaluation of Seabrook Plan for Commonwealth of Ma Communities. NRC Will Be Provided W/ Consolidated Finding on Offsite Plans for Entire EPZ on 881118 ML20247N5851988-09-26026 September 1988 Discusses American Red Cross Participation in Offsite Planning for Plant.Fema Finds Commission Ruling Applicable to Plant.Requests to Be Informed NRC Find Commission Ruling Acceptable to Apply in Review ML20154D6291988-09-12012 September 1988 Forwards RW Krimm 880902 Memo to NRC & RW Donovan to Rh Strome of State of Nh,Served on Svc List for Hearing. Certificate of Svc Encl ML20154C5151988-09-0202 September 1988 Forwards Exercise Rept Fo 880628-29 Joint Exercise of Offsite Radiological Emergency Preparedness Plans for Plant.Draft Ltr to Rj Harrision,Public Svc Co of New Hampshire,Encl ML20154A0671988-09-0101 September 1988 Requests That RR Donovan Be Added to & EA Thomas Be Deleted from Plant Litigation Svc List.Certificate of Svc Encl ML20155F7061988-06-10010 June 1988 Forwards Amended Testimony of WR Cumming & Jh Keller on Behalf of FEMA on Sheltering/Beach Population Issues, Reflecting Typo & Editorial Corrections.Changes Listed. Related Correspondence ML20154E9211988-05-12012 May 1988 Forwards Agenda from Fema/Nrc 880119 Meeting & marked-up Talking Points for Stello Meeting,Per Executive Privilege Asserted on 880415.No Notes Taken at FEMA 880119 Meeting. Certificate of Svc Encl ML20150D0681988-03-17017 March 1988 Forwards Transcript of FEMA 880229 Meeting of Regional Assistance Committee.Certificate of Svc Encl.Related Correspondence ML20148A1561988-03-0808 March 1988 Confirms 880218 Telcon W/Nrc Re Encl Inadequacies in Plan for State of Ma Communities.Expresses Serious Concerns About Advisability of Continuing on Current Schedule for Plan Review & Exercise Due to Nature of Inadequacies ML20155E6501988-01-11011 January 1988 Forwards SB Comley Re Allegation of Wrongdoing for Appropriate Investigation ML20237C3101987-12-15015 December 1987 Discusses FEMA Positions Re Facility Emergency Plan for State of Ma Communities,Including Giving Opportunity for Util to Conform Various Plan Vols to New 10CFR50.47 Criteria ML20235K8911987-09-30030 September 1987 Forwards Index to Testimony of Witnesses,Corrections to Prefiled Testimony & Corrected Testimony Per 870917 Pretrial Conference Discussion.Fema Response to Intervenors Motion for Suspension of Hearings Also Encl ML20235K8061987-09-30030 September 1987 Forwards Index to Testimony of Witnesses,List of Corrections to Prefiled Testimony & Corrected Copy of Testimony.Fema Response to Motion for Suspension of Hearings Also Encl. Related Correspondence ML20236U0971987-09-23023 September 1987 Forwards Facility Radiological Emergency Response Plan for Commonwealth of Ma,For Disposition.Plan Delivered to FEMA by Util .Meeting Scheduled on 870930 to Discuss Issues Mentioned in Author .W/O Encl ML20235F2501987-09-18018 September 1987 Advises That Author Required to Travel to Houston,Tx on 871008 & Appear in Court on 871009 as Defendant for Actions Taken as Atty for Fema.Notice of Appearance for WR Cumming Encl as Substitute Atty for Fema.W/Certificate of Svc ML20235L4331987-09-0202 September 1987 Informs That FEMA Would Appreciate Opportunity to Discuss Parameters,Time Frames & Other Matters Prior to NRC Making Formal Request for Fema/Regional Assistance Committee Review of Proposed Onsite Emergency Preparedness Plan for Plant ML20236N9771987-08-0505 August 1987 Provides Notice of 870812 Meeting in Concord,Nh to Discuss State of Nh Radiological Emergency Response Plan.Certificate of Svc Encl.Related Correspondence ML20238F2121987-04-24024 April 1987 Forwards Seabrook Station Radiological Emergency Response Plan for Commonwealth of Massachusetts,For Disposition.W/O Encl ML20210M6601986-12-22022 December 1986 Forwards,For Filing,Fema/Regional Assistance Committee Review of Rev 2 to New Hampshire State & Local Radiological Response Plans for Seabrook Nuclear Power Station. Certificate of Svc Encl.Related Correspondence ML20203G7681986-07-0101 July 1986 Advises That Based on Review of Util 730330 Amend 57 to License Application,Requesting Partial Transfer of CPPR-135 & CPPR-136,proposed Participation by Eua Power Co Would Not Be Inconsistent W/Antitrust Laws ML20202G4641986-07-0101 July 1986 Responds to Request for Advice Re Purchase by Eua Power Co of Ownership Interest in Facility.Antitrust Hearing Unnecessary ML20203G4071986-07-0101 July 1986 Advises That Proposed Participation by Eua Power Co in Facility Would Not Be Inconsistent W/Antitrust Laws of Section 105c of Atomic Energy Act of 1954,per Request ML20206P6151986-06-30030 June 1986 Forwards Motion for Continuation of Hearing on Emergency Planning Contentions.W/O Encl.Related Correspondence ML20199B4611986-06-0505 June 1986 Forwards Joint New Hampshire State & Local Radiological Emergency Response Exercise for Seabrook Station Nuclear Power Plant, Final Exercise Assessment on 860226.Rept of Deficiencies Identified Will Be Provided to State ML20155B0381986-04-0303 April 1986 Responds to 860319 Memo Forwarding Hs Moyer Ltr Re Emergency Planning Issues.Response to Moyer Forthcoming.Response to Moyer Re Offsite Planning Encl ML20154Q0811986-03-12012 March 1986 Responds to 860224 Memo Referring Hs Moyer (State of Nh) Correspondence Re FEMA Area of Responsibility Concerning Facility Emergency Planning Issues ML20086T7451984-02-29029 February 1984 Forwards Supplemental Responses to Atty General Belloti Interrogatories.Related Correspondence ML20082N5181983-12-0101 December 1983 Forwards Memorandum Opposing Atty General Bellotti Motion to Compel Answers to Interrogatories.Related Correspondence ML20082D6291983-11-16016 November 1983 Advises That Author Will Be Unavailable on 840116,27 & 0213-24 for Prehearing Conference.Conference Should Be Rescheduled ML20080L4601983-09-21021 September 1983 Forwards FERC to Senator Tsongas,For Further Response Re Constituent C Nord Ltr ML20080F2581983-09-15015 September 1983 Advises That New England Coalition on Nuclear Pollution 830811 Contentions on New Hampshire Emergency Response Procedures Are Not Ripe for Adjudication.Procedures Not Yet Submitted to Fema.Certificate of Svc Encl ML20073J6211983-04-11011 April 1983 Forwards Notice of Appearance in Proceeding ML20064J3251983-01-13013 January 1983 Comments on Fes.Supports Issuance of OL for Startup & Operation of Facilities 1990-09-07
[Table view] |
Text
-.
n[.
L 4,n t
e Federal Emergency Management Agency ,
I- Washington, D.C. 20472 l
[
l (EC 18 W Mr. James M. Taylor Executive Director for Operations i U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dear Mr. Taylort This is in response to your November 17, 1989, memorandum requesting a status report f rom the Federal Emergency Management Agency (FEMA) on the readiness of the Seabrook Public Alert and Notification System (ANS),
including the Vehicular Alert and Notification System (VANS) f or the !
Massachusetts portion of the plume emergency planning zone (EPZ). f i
in the findings on offsite emergency preparedness for Seabrook Station that FEMA provided to the Nuclear Regulatory Commission (NRC) on December 14, '
1988. FEMA found that the Seabrook ANS design for the New Hampshire portion of the Seabrook plume EPZ met the design requirements of FEMA-REP-10. FEMA's finding s1so stated that when the proposed enhancements to the ANS for the New Hampshire portion of the Seabrook EPZ were installed and operable, i the plans and preparedne6s would be adequate to protect the health and ;
safety of the public living in the New Hampshire portion of the Seabrook EPZ, by providing reasonable assurance that appropriate protective measures can be taken offsite in the event of a radiological emergency and are '
capable of being implemented.
As the enclosed December 1,1989, reports prepared by the Regional Assistance ,
Connittee (RAC) Chairman fnr Seabrook state,' these conditions have been !
met for the ANS in the New Hampshire portion of the EPZ and those parts i of the New Hampshire Radiological Emergency Response Plan covered by NUREG-0654/ FEMA-REP-1, Rev.1, Evaluation Criterion E.6, are now adequate.
The State of New Hampshire has the capability to provide an alert signal and instructional message in the New Hampshire portion of the Seabrook
-plume EPZ within the required time frames in FEMA REP-10 and NUREG-0654/
~
FEMA-REP-1, Rev. 1, Appendix 3. In addition, the FEMA Region 1 Director notified me on December 4,1989, of his reviced interim evaluation of the ,
State of New Hampshire of f site plans and preparedness and his recommenda-tion to grant formal approval. The capability of the State's ANS to ,
directly alert the public will be confirmed by a telephone survey to be conducted following the integrated Seabrook ANS operational test currently schedaled for May 1990, and as always, FEMA will review the operability against FEMA-REP-10. !
9001030112 891218 EDO --- 005011 1\
PDR ADOCK 05000443 i F PDC '
.j ,- ,
di- *
[
l It is FEMA's position that based on the current status of the alert and notification system for the Massachusetts portion of the Seabrook plume' EPZ, the means exist to notify the transient and resident population in that area and NUREG-0654/ FEMA-REP-1, Rev. 1 Supp. 1, Evaluation Criterion J.10.c, is adequate for the Seabrook Plan for Massachusetts Communities (SPMC). However, it is our understanding that the VANS will l not become operational 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a dcy, 7 days a week until January 3, 1990. We will advise you as soon as we have verified that operational status. It is TEMA's position that parts of the SPMC covered by Evaluation -
L Criterion E.4, will be adequate at that time. The capability of the VANS to directly alert the public will be confirmed in conjunction with the integrated Seabrook ANS operational test scheduled for May 1990. 'As stated in FEMA's findings to the NRC on December 14, 1988, when the VANS is installed and operable, FEMA's position in that at that time, a positive finding can be made, i.e., that plans and preparedness will be adequate to protect the health and safety of the public living in the Massachusetts portion of the Seabrook EPZ by providing reasonable assurance that appropriate protective measures can be taken offsite in the event of a radiological emergency and are capable of being implemented.
Finally, as you may recall, FEMA approved the Maine Ingestion Pathway Plan for Seabrook Station in accordance with 44 CFR 350.12 on March 16, 1989.
If you have any questions, please feel free to conta'ct %e at 646-3692.
Sincerch,,' /
s eeM~
/
~
rant C. Peterson Associate Director State and Local Programs and Support Enclosures As Stated l
l l
~
s 44 t,g'M.y Federal Emergency Management Agency j a
3 9 9[)N k Region X Federal RegionalCenter Bothell, Washington 980219796 l
Lw = har 1, 1989
)DDRNiDUM IDR: Craig S. Wirgo, Chief Technological Hazards Djvision SIrNT 'IH 1 % w .L a . W Richard W. Donovan, Chairman FRCH:
for Seabrook Regional Assistance Ccumittee
SUBJECT:
Status Report on the Seabrook Public Alert ard Notification System (NE)
On November 17, 1989, the Nuclear Rcqulatory Camission requested from FDM a l Status Report on the Seabrook Public NE. By separate memorardum, I have forwarded my Preliminary Findirg of Adequate for the Seabrook Station NE in the ,
State of New Hampshire. 'Ihis mcmorardum presents my Status Report for the Seabrook Station NIS.
On % 2 13, 1988, FDR Region I provided our Interim Evaluation and l Recommendations for the Seabrook Nuclear P wer Station. At that time our Interim l
Evaluation was that plans and preparedness for both the New Hampshire ard ,
1 Massachusetts portions of the Seabrook Plume EPZ would be adequate when the NE is installed and operational in New Hampchire and Massachusetts. Our evaluation
~ of plans ard preparodness irdicated that E.6 for New Hampshire was inadequate ard that E.4 ard J.10.c was inadequate for }hssachusetts.
In my separate mer.orardum, I have provided to you my Preliminary Firding of Adequate for the ANS in New Hampshire. I now fird that E.6 is adequate. FD%
Region I will forward revised Interim Evaluations ard Rom.erdations to FD%
Headquarters for the State of New Hampshire.
I have roccived New Hampshire Yankee's comitent that they will make the NE operational in the State of Massachusetts on January 3,1990. I have verified that the NG does exist for the State of Massachusetts. I now find that J.10.c is adequate. When New Ilarpshire Yankee declares the NE operational (January 3, 1990), I will fird that the NE system is adequate (E.4 will be adequate) for the State of }hssachusetts. FD% Region I will forward Revised Interim Evaluation l and Rwndations for the State of Massachusetts at that tim.
If you have any questions, please contact me at 206-487-4693 (or FPS 390-4693).
l
p- .. ,
- j
, Federal Emergency Management Agency Region X Federal RegionalCenter Bothell,Washintton 980219796 l
't !
I i
1 W r 1, 1989 l 1
i l
1 MDORNJDUM IUR: Craig S. Wingo, Chief l 7bchnological Hazards Division SIrNI 'DI l IT m :
(OM M d. h Richard W. Donovan, Chairman i
l for Seabrook Regional Assistance Ortnittee j SUB7I:ct: Preliminary Firding of Adequate for the Alert ard Notification System for the Seabrook Station in the State of New Hampshire On November 23, 1988, you forwarded to me preliminary technical review material on the Alert ard Notification System (MG) for the Seabrook Station. You requested that I review the draft technical material ard make a Preliminary Firding of Adequate or Inadequate for the Seabrook ANS. This memorandum ard attachment present my Preliminary Firding of Adequate for the Scabrook Station N4S in the State of New Harpshire.
I fird that six of the seven evaluative criteria (identified in FD%'s REP-10) are adequate for the State of New Harpshire. There is insufficient data to rake i
a finding on evaluative criteria N.1 at this time. Following is a sunnary of my preliminary firdirg:
NURD3-0654/FD% REP-1. Rev.1, elements E.5, E.6, F.1, N.2, N.3 ard N.5 for New Hampshire are adequate. Please see the attached report for details on New Hanpehire's planning ard preparedness. There is ,
insufficient data at this time to make a finding on evaluative criteria N.1 for the State of New Hampshire-only insofar as a telephone survey has not been corducted. I am noting that the month of May 1990 has been set for the NG demonstration ard telephone survey. Following the ANS demonstration and telephone survey, I will incorporate the telephone survey results and available operability data into my Final Finding and Rm -ardations for the Seabrook ANS in the State of New Harpshire.
I confirm that the State of New lh W has the capability to provide an alert signal ard instructional message in the New Hampshire portion of the Seabrook Plume EPZ within the required time frames in FD% REP-10 ard NUREG-0654/PD% REP-1, Rev.1, Apperdix 3.
I confirm that New Hampshire has an acceptable routine siren testing procedure.
. . . . . I y *s 2.
Follcuing is a sumnary of the supplemental special alert and notification l procedures of the State of New Hampshire for the Seabrook Plume EPZ: '
he State of New Hagshire Radiological Emergency Pasponse Plan contains prwisions for notification and request for alert and l notification to the U.S. Coast Guard (DOT) ard the U.S. Tederal Aviation Administration (ICT). mese two Federal Agencies have the responsibility, authority, and jurisdiction for effecting clocures of navigable waters and airspace in the Seabrook Plume EPZ.
We State of New Hagshire has prwided specialized alert and i notification equi; rent to the deaf ard hard of hearing. his equipment is to be utilized in confirming whether or not the person needs transportation assistance in the event Protative Actions for the public are implemented. %e State of Ncw Harpshire has offered and provided tone alert radios to schools, day care centers, nursing homes, hospitals, medical facilities, campgreurds, hotels and rotels, and businesses with 50 or more employees, he State of New Harpshire has supplemental notifica-tion procedures for parks, hunting areas, beaches, campgrounds, 1 etc. j I am noting that this specialized alerting equipent ard the supplemental alert ard notification procedures are not a part of the primary ANS.
I certify, to the best of n1y knowledge ard belief, that the statments contained in this memorardum ard attachnents are true ard accurate. My Preliminary Finiing is that the Seabrook ANS for the State of New Harpshire is Adequate.
If you have any questions, please contact me at 206-487-4693 (or PTS 390-4693) .
1 Attachment l
.,. *g
'nIC SIATE OF ND4 }%MPSHIRE'S AIDC & N:frIFICATIQi SYSTD4 -
. KR
'IHC STABROOK NOCEDR PDWER STATIQi l TDR RD3IQi I, DDCEMBER 1989 REVIDi uumdA !
12 DENT. FINDDG OCHMDR l
E.5 ADEQUATE 1. We State of New Hanpshire's Radiological Dnergery -
Response Plan (!G{RERP) describes the systen for disse:si-nating instructions to the public relevant to information -
contained in the initial ard follow-up messages receivcd fran Seabrook Station. %e Stata has designated the l Seacoast Operational Area EBS Network as the notification i systan for Seabrook Station. Radio Station WO1Q-IN, l located in Dover, New Harpshire, serves as the CKS-1 '
station for this notification systan.
- 2. he State of New Hampshire has made arrargements ;
(letter of Agreement) with Radio Station WO1Q to serve as the CPCS-1 EBS station for the New Hanpshire Seacoast Area. We Seabrook Regional Assistance Ctanittee (RAC)
Chairman has confirned that Radio Station WolQ has adequate signal strergth (50,000 watts) to be picked up throughout !
the New Hanpshire portion of the Seabrook Plume EPZ; has backup power; operates 24-hours-a-day; and has a backup -
transmitter in the event the primary transmitter should fail. Radio Station WOlQ performs a weekly test of the EBS network. >
, 3. he State of New Hampshire has two dedicated lir0:s to l Radio Station WKQ--a FAX line and machine, and a dedicated l- telephone. %ese dedicated cirulits are located at two
- State locations, the State D3C and the State Police l Cumunications Center. Both facilities are located in l
Concord, New Hanpshire. Radio Station WO)Q has the l r-ory equipnent to activate the tone-activated radios that were distributed. Radio Station WOlQ has the capability to record and rebroadcast such EBS messages.
- 4. he State of New 11ampshire has procedures for activa-tion of the notification system. Eey address quick-breaking situations and situations when the State EOC is activated. Certain EBS messages have been recorded and
! are located at Radio Station W3}Q ard at the Rockingham l County Dispatch Center. S e State Police have the l authority to activate the ANS in the event of a fast l breaking event. h e State Police Cennmunications Center l
operates on a 24-hours-a-day basis. Upon activation of the State EOC, the New Hampshire Office of Energency Management assumes the responsibility for activation of the notification systan.
1
l MIE STATE OF ND4 HAMPSHIRE'S ALDT & ICTIFICMt'N SYSTEM FOR DIE SEABROOK NUCLTAR IWER SIATICH 112% RD3ICH I, DOCD4BER 1989 REVIDi QuuudA JIDDU FINDIlG CrtHDR E.5 (Cont.) 5. Se State's procedures call for the EBS messages to be broadcast every 15 minutes for a mininn of 2 to 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> (if the ressage does not change) or otherwise directed.
EBS messages will be monitored by the Media Center and Joint Telephone Information Center.
E.6 ADD 20 ATE 1. We NHRERP specifies the organizations, ard irdividuals within those c ganizations, who are responsible for activat-irg the ANS. Administrative means exist to ensure a 24-hour response capability for notification ard activation of the ANS.
- 2. W e NHRERP procedures specify the steps to be employed to activate the ANS. Se primary siren activation ard control point (alert system) is the Rockingham County Dispatch Center with backup activation fran the Seabrook Station Control Room. m e New Hampshire municipalities within the Plume EPZ can also activate the sirens within their boundaries. In the event of fast-breakirg emergency, the State Police Communications Center can direct Rocking-ham County Dispatch Center to activate the sirens. Se current administrative ard physical means meet the 15-min-ute design objectives of IURD3-0654/FD%-REP-1, Rev.1.
- 3. he New Ha::pshire Yankee's 1TMA REP-10 ard FDR REP-10 Adderdum reports have been reviewed by ERC International, a FD% technical assistance contractor. S e Seabrook RAC Chairman has reviewed the contractor's draft report titled "Seabrook Station Site-Specific Offsite Radiological Emergency Preparedness Alert ard Notification System Quality Assurance Verification." The Seabrook RAC Chairnan concurs with the firding that Seabrook Station's Public Alert ard Notification System Design does meet the specific design requirenents of FD % REP-10.
- 4. We Seabrook siren system within the State of New Hampshire consists of 94 sirers. Se Seabrook RAC Chairman has verified that the siren system has been enhanced as specified in the FD% REP-10 ard FD% REP-10 Adderdum reports ard as described in the NHRERP Volume 1, Rev. 3.
W e Seabrook siren system became operational effective October 1989.
- 5. Tone alert radios have been provided to institutions, special needs facilities, and special needs persons. Rese 1
tone alert radios will be activated by a signal broadcast by Radio Station IO}Q. Reso tone alert radios are a -
supplemental system to the primary siren system.
2 l
1
7EE STATE OF NDi }W(PSHIRE'S ALERP & }CITTICATIN SYSIIM FOR {
7nE Srmoox NoCtra racR mTim ;
FD4A RD3 ION I, IOCDGER 1989 REVID4 CRITERIA EUMDfr. FD7DDE O}MNT E.6 (Cont.) 6. Means of alertirq boaters in offshore waters will be {
prwided by the U.S. Coast Guard (USO3) . The State of New Harpshire has an agreement with the USO3 statirg that the :
State will request the establishment of a narine safety ,
zone. Se USO3 will establish a narine safety zone with ,
appropriate notices to nariners broadcast over mariner i radio channels. S e State can provide personnel and ,
equiIrent frun the Department of Safety Services, Division of Boating Safety to supplement the USO3 alerting and i notification activities. By agreement with New Harpshire Yankee, the State of New Hanpshire requests such marine alerting ard notification by the USO3 for the offshore ,
waters in the Seabrook Plume EPZ. .
- 7. The State of New Harpshire has an agreement with the U.S. Federal Aviation Administration (DOT) for the establishment of an air space restriction and the '
notification of aircraft. Dy agreement with New Hampshire Yankee, the State of New Hanpshire requests such alerting and notification by the DOT for the Seabrook Plume EPZ.
F.1 ADD;UATE 1. 7here exists a primary ard a secontlity ccsumanication system frun the licensee's facilities (control rocan and 7SC) to the Rockirgham county Dispatch Center, the State Police Carmunications Center, and the State EOC. The Rockirgham 0:unty Dispatch Center and the State Police Communications Center cperate on a 24-hours-a-day basis.
- 2. Provisions exist for hard-copy verification between the State's Incident Field Office at the EOF and the State EOC. Current procedures call for the use of this system.
- 3. Neither ccanmunications system is subject to preemption for lower priority purposes or for failure due to traffic overloadirg. The primary and secondary systems do not have a ccrumon failure mode under adverse environmental conditions.
N.1 NO FINDDG 1. The capability of the Seabrook ANS to directly alert the public will be confirned by a telephone survey to be corducted followirg an operational test to be held in May 1990. The cperational test shall include the activation of the siren system in an "all siren rode" ard in the " beach closing rode". -
3
t .
ME SIATE OF NDi HAMPSHIRE'S AIDC & }CTIFICATIQ4 SYSIDi ;
FOR !
DE SEAHROOK NOCIIAR 3%T:R STATIQ4 l FDR RIGION I, DOCDER 1989 .
i REVID4 CRITERIA i EIDDIT FDJDIN3 _COMNT ,
N.1 (Cont.) 2. Operability data frm the system-wide silent test routine is not available at this time.
- 3. Rockirgham County Dispatch Center shall perform three system-vide silent tests of the New Hampshire siren system every 2 weeks. S e system-wide silent test program was initiated in n==har 1989.
- 4. Ear.h shift shall execute the system-wide silent test procedure every 2 weeks. B ere are three shifts per i 24-hour day. For each test, the Rockingham County Dispatch '
Center will dispatch a person to a siren location. The r person will verify that the specific siren did or did not rotate about 90'. If the siren rotates, all lights on the siren's control panel will be illuminated. If the siren rotates, the person will verify that the lights were illuminated.
- 5. Appropriate documentation for the system-wide silent tests will be developed. 21s documentation will serve as a basis for the report on operability percentage achieved.
! me State will subnit an annual report on alert and
( notification tests, operability percentage, etc. to FDR (Annual letter of Certification).
- N.2 ADDQUATE 1. We State of New Hampshire has cammitted itself to a series of communications drills. Quarterly drills will include the testing of the linkages frun the Seabrook Station to the State Police, ard frm the State Police to r Rockirgham County Dispatch Center and the State D3C.
- 2. Se State of New Hanpshire uses most of the equipnent identified in the NHRERP on a daily basis. Berefore, the cmmunication drill program is designed to test p.h rather than equipment. Se State of New Hampshire and ,
i Seabrook Station began the quarterly cmmunication drill program in the fall of 1989.
- 3. FD% notes that a more complete description of the State of New Hampshire drill program can be found in FDR's report, " Review and Evaluation of the New Hampshire Radiological Emergency Response Plan" (WWr 1988),
Planning Standard N.
4
1':..
i.,
o-EE STATE OF hTM HAMPSHIRE'S AIDG & }UTIFICATIcti SYSTDI l
KR WE SFABROOK NOC2 EAR IWER SIATIC14 II24A RD31C24 I, 00CDECR 1989 RLVID4 CPITERIA DD4Dir FINDI!*3 CrtHENP N.3 ADDQUATE 1. We State of New Hanpshire has ommitted itself to develop exercise scenarios that will p1 wide corditions to test the decision ard implementation chain for Alert ard Notificatien System activation.
- 2. We State of New Hanpshire adequately delcr. Lated its capabilities to activate the Alert and Notification System in the 1988 FD4A Graded D:ercise for Seabrook Station.
N.5 ADD 20 ATE 1. We State of New Harpshire has ommitted itself to a pu cece for evaluatirq observer's ard participant's coments concernin; Alert ard Notification System perforrance.
- 2. We State of New Hanpshire has demonstrated its ability to establish a management control system for resolution of planning ard preparedness issues.
1 5