IR 05000275/1989007

From kanterella
Revision as of 23:45, 10 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safeguards Insp Repts 50-275/89-07 & 50-323/89-07 on 890227-0303.No Violations Noted.Repts Withheld (Ref 10CFR2.790(d) & 73.21)
ML20247G135
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/24/1989
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8904040136
Download: ML20247G135 (3)


Text

{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . *

,

SAFEGL Q~MH URM ATION

*

r n NUCLEAR REGULATORY COMMISSION y, :E REGION V O s 14s0 MARIA LANE.SulTE 210

    ,o#@  WALNUT CREEK, CALIFORNIA 94596
 %,*****

MAR 2 41989 ! Docket Nos. 50-275 and 50-323 Pacific Gas and Electric Company i 77 Beale Street, Room 1451 ~ l San Francisco, California 94106 l Attention: Mr. J. D. Shiffer, Vice President

 ,

Nuclear Power Generation Gentlemen: Subject: NRC Security Inspection - Diablo Canyon, Units 1 and 2 This letter refers to an unannounced routine Safeguards Inspection of your activities at Diablo Canyon Power Plant (DCPP), Units 1 and 2, authorized under NRC License Nos. DPR-80 and DPR-82, conducted by Mr. D. Schaefer of Region V on February 27 through March 3, 1989. Ms. N. Ervin, NRR, accompanied D. Schaefer during a portion of this inspectio This letter also refers to the discussion of the inspection findings held by the inspectors with Mr.' M. Giscion, Assistant Plant Manager, Support Services, and members of the DCPP staff on March 3, 1989. Further, this letter refers to a telephone discussion between Messrs. R. Todaro, DCPP, and D. Schaefer of this office on March 9, 198 Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with facility and contract personnel, and observations by the inspecto Within the scope of the inspection, no violations were observe In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of the findings of your safeguards and security measures are exempt from public disclosure; therefore, the enclosed report will not be placed in the Public Document Room and will receive limited distributio We have determined that the enclosure to this letter contains Safeguards Information and must be protected against unauthorized disclosure in accordance with the provisions of 10 CFR 73.2 Should you have any questions concerning this letter, we will be glad to discuss them with yo

Sincerely, l / 8904040136 890324 00 5 g' o rt . a Ch ef Nuclear Materials Safety and 7 Safeguards Branch g , t 7-m- . um y

      *

L C.T.MI Oc: 7111s 1 at u :xmaa: < ;j y {{{t[g 9 jN,; ;; A} z\ _ _ _ - _ _ _ _ _ _ _ - _ _ _

_ _ _ _ _ - . _ -

 -
, .
..
    -2 MAR 2 4 g:3
     :

Enclosure:

Inspection Report _ Nos. 50-275/89-07, 50-323/89-07 (IE-V-887) I

REGION V/ dot /M D.Schaefepjldp[>M.Schuster te 3rd /89 3@/89 3/,2 % 89 UEST COPY ] R QUEST COPY ] REQUEST ] YES / NO ] E, / NO ] YES / NO ]

--

v thTOPDR ] YES) / NO ] i.esseue(a wre

  -

_ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ }}