|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20237G0421987-08-11011 August 1987 Responds to 870707 Appeal Re Denial of FOIA Request for Documents.Appeal Granted.Portions of Six Documents Re Insp Rept 50-424/86-91 Concerning Drug Abuse at Facility Previously Withheld Encl ML20235K1541987-07-14014 July 1987 Responds to Appeal of Denial of FOIA Request for Documents Re 861113 Insp Rept 50-424/87-90 Concerning Drug Abuse at Plant.Previously Withheld Info Will Continue to Be Withheld (Ref FOIA Exemption 6) ML20235D3791987-07-0101 July 1987 Final Response to FOIA Request for Documents Re Plant Fitness for Duty Program.Forwards App F & G Documents. Documents Also Available in Pdr.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20237D2881987-06-15015 June 1987 Responds to Request for Info Re Proposed Rule Changes Dealing W/Emergency Planning for Nuclear Power Plants.Rule Provides Criteria by Which NRC Can Evaluate Whether Util Emergency Plan Adequate in Absence of Local Participation ML20214B6881987-05-14014 May 1987 Partial Response to FOIA Request for Documents Re Plant anti-drug & Alcohol Program.Encl App C Documents Also Available in Pdr.App D & E Documents Partially & Completely Withheld (Ref FOIA Exemption 6),respectively ML20213G8501987-05-12012 May 1987 Responds to Expressing Concerns Re Licensing of Plant Prior to Completion of Required Safety Tests.Nrc Authorized Schedular Relief from Certain Tests Which Are Not Necessary to Ensure Safety ML20212P1601987-03-11011 March 1987 Partial Response to FOIA Request Re Insp Repts.Forwards App B Documents.App a & B Documents Available in PDR ML20207P7351987-01-14014 January 1987 Ack Receipt of Notifying NRC That Recipient Will Represent Georgians Against Nuclear Energy in Oral Argument Scheduled for 870121.Served on 870115 ML20214F1711986-11-20020 November 1986 Responds to FOIA Request for Documents Re Insp Repts 50-424/85-04 & 50-425/85-04.Forwards Portions of App a & B Documents.Documents Also Available in Pdr.Portions of App a & B Documents Withheld (Ref FOIA Exemptions 6 & 7) ML20197C4531986-10-23023 October 1986 Responds to Appeal of Denial of FOIA Request for Documents Re Allegations.Seven of 11 App D Items Forwarded & Available in Pdr.Portions of Items 4-7 Withheld (Ref FOIA Exemption 7) ML20210T0621986-10-0303 October 1986 Forwards Response to Applicant Motion to Strike Notice of Appeal of Campaign for Prosperous Georgia ML20204G5971986-08-0101 August 1986 Responds to to DOE Re Startup of Plant.Specific Info Available at Lpdr.Unit 1 Fuel Load Estimated for 861215.Following Preoperational Testing,Unit Ready for Commercial Operation About 6 Months After Loading Fuel ML20203C2951986-07-11011 July 1986 Further Response to FOIA Request for Documents Re NRC Investigation Into Complaints of Register,L Price & JB Register Concerning Improper Practices at Facilities.App D Documents Withheld (Ref FOIA Exemption 7) ML20198E2181986-05-22022 May 1986 Informs That Wf Lawless & Hm Deutsch Affiliation W/Georgians Against Nuclear Energy Must Be Established by 860605 Before Filing of Proposed Findings Re Contentions 7 & 10.5,in Response to 860314 Hearing,Acceptable.Served on 860523 ML20197E2381986-05-0202 May 1986 Further Response to FOIA Request for Records on Register, L Price & JB Register Complaints Re Alleged Illegal & Improper Procedures.Portions of App B Records & All App C Records Withheld (Ref FOIA Exemptions 6 & 7,respectively) ML20210K4521986-03-28028 March 1986 Partial Response to FOIA Request for Documents Re NRC Investigation Into Register,L Price & J Register Allegations of Illegal & Improper Procedures at Facilities. Documents on App a in PDR ML20141G4951986-03-25025 March 1986 Further Response to FOIA Request for Documents Re NRC Investigation of Allegations of Intimidation & Harassment of Inspectors by Pullman Power Products Employees.Forwards App D Documents.Documents Also Available in PDR ML20138R0621985-12-26026 December 1985 Returns 851220 Transmittal of 11 Page Unsigned Document Entitled, Analysis of ASLB 851212 Memorandum & Order.... Document Does Not Conform to NRC Rules of Practice & Is of No Use in Case.W/O Encl.Served on 851227 ML20134A5251985-10-28028 October 1985 Final Response to FOIA Request for Documents on 850726 Briefing by Util Re Readiness Review Program,Including Transcript of Briefing.App D Documents Withheld (Ref FOIA Exemption 5).Action on Request Complete ML20136D4051985-10-11011 October 1985 Final Response to FOIA Request for Five Categories of Documents Re Pollution Control Bonds for Plants.Forwards App E Documents.Documents Listed in App F & App E Available in PDR IA-85-599, Partial Response to FOIA Request for Documents Re Util 850726 Briefing on Readiness Review Program,Including Transcript.Documents Listed in Apps a & B Available in Pdr. App C Documents Withheld (Ref FOIA Exemption 5)1985-10-0303 October 1985 Partial Response to FOIA Request for Documents Re Util 850726 Briefing on Readiness Review Program,Including Transcript.Documents Listed in Apps a & B Available in Pdr. App C Documents Withheld (Ref FOIA Exemption 5) ML20138C1041985-10-0303 October 1985 Partial Response to FOIA Request for Documents Re Util 850726 Briefing on Readiness Review Program,Including Transcript.Documents Listed in Apps a & B Available in Pdr. App C Documents Withheld (Ref FOIA Exemption 5) ML20133Q1851985-07-11011 July 1985 Further Response to FOIA Request for Documents Re Charleston Earthquake of 1886 & Seismic Design for Vogtle. Documents 1 & 2 Available in Pdr.Document 3 Encl IA-84-430, Further Response to FOIA Request for Documents Re Charleston Earthquake of 1886 & Seismic Design for Vogtle. Documents 1 & 2 Available in Pdr.Document 3 Encl1985-07-11011 July 1985 Further Response to FOIA Request for Documents Re Charleston Earthquake of 1886 & Seismic Design for Vogtle. Documents 1 & 2 Available in Pdr.Document 3 Encl ML20210K4901985-06-20020 June 1985 Forwards for Review,Results of 850522 Interview Concerning Allegations RII-85-A-0016.Concerns May Be Referred Back to Util & Subj to NRC Audit.Info Will Be Forwarded to Technical Staff for Review.W/O Encl.Related Info Encl ML20210K4821985-06-20020 June 1985 Forwards for Review,Results of 850522 Interview Concerning Allegations RII-85-A-0016.Concerns May Be Referred Back to Util & May Be Subj to NRC Audit.Info Will Be Forwarded to Technical Staff for Review.W/O Encl ML20210K4701985-06-20020 June 1985 Forwards for Review,Results of 850522 Interview Concerning Allegations RII-85-A-0016.Concerns May Be Referred Back to Util & May Be Subj to NRC Audit.Info Will Be Forwarded to Technical Staff for Review.W/O Encl ML20126D8001985-02-28028 February 1985 Further Response to FOIA Request for Six Categories of Documents Re Charleston Earthquake of 1886 & Seismic Design for Vogtle Nuclear Power Plant.App B Documents Forwarded & Available in Pdr.Review Continuing ML20197E2961985-02-26026 February 1985 Partially Withheld Ltr Re Abuse of Drug Screening Program & Const Deficiencies Discussed During Feb 1985 Telcons.Actions to Develop Facts & Circumstances of Encl Identified Concerns Initiated ML20197E2661985-02-26026 February 1985 Partially Withheld Ltr Re Abuse of Drug Screening Program & Const Deficiencies Discussed During Jan 1985 Telcons.Actions to Develop Facts & Circumstances of Encl Identified Concerns Initiated ML20125E3381985-02-19019 February 1985 Third Partial Response to FOIA Request for Six Categories of Documents Re Charleston,Sc Earthquake of 1886 & Seismic Design for Plant.Forwards App a Documents ML20214F5541984-11-0808 November 1984 Partially Withheld Memo Re QC Concerns at Plant.Notification If Concerns Not Completely or Accurately Reflected in Encl Requested.Complaint Re Discrimination Should Be Filed W/Dol. Related Info Encl ML20214F3911984-06-12012 June 1984 Partially Withheld Ltr Confirming Understanding of Concerns Re Deficiencies Concerning Case RII-84-A-0094.Notification If Concerns Not Completely or Accurately Reflected Requested.Records of 860531,0601 & 0608 Telcons Encl 1987-08-11
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20205B9601999-03-24024 March 1999 Seventh Partial Response to FOIA Request for Documents. Records in App N Already Available in Pdr.App O Records Being Released in Entirety & App P Records Being Withheld in Part (Ref FOIA Exemptions 7C,2 & 5) ML20205A2771999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Vogtle PPR on 990208.PPR for Plant Involved Participation of All Technical Divs in Evaluating Insp Results & Safety Performance Info for Period of Dec 1997 - Jan 1999 ML20207L8281999-03-0808 March 1999 Forwards Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 & Notice of Violation ML20207J0431999-03-0303 March 1999 Forwards Insp Repts 50-424/98-10 & 50-425/98-10 on 981227- 990213.No Violations Noted.Licensee Conduct of Activities at Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices ML20203G5691999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Ltr Indicating No Candidates or Ltr Listing Names of Candidates for Exam ML20202H9691999-01-29029 January 1999 Forwards Safety Evaluation Authorizing Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant, Unit 1 ML20199J7931999-01-20020 January 1999 Forwards Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226 at Vogtle Units 1 & 2.No Violations Were Identified.Conduct of Activities at Vogtle Was Generally Characterized by safety-conscious Operations ML20199K1381999-01-12012 January 1999 Informs That on 990117,Region II Implemented Staff Reorganization as Part of agency-wide Streamlining Effort, Due to Staffing Reductions in FY99 Budget.Organization Charts Encl ML20198S1601998-12-31031 December 1998 Forwards SER of Licensee Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Vogtle Electric Generating Plant Submitted on 970529. INEEL/EXT-98-01007 Rept Also Encl ML20199E4741998-12-23023 December 1998 Provides Summary of 981105 Training Managers Conference Held in Atlanta,Georgia.Conference Agenda,List of Conference Attendees,Presentation Slides & Preliminary Schedule for FY99 & FY00 Encl ML20199J9781998-12-22022 December 1998 Responds to 981209 Meeting Re Installation of Seismic Clips on Cutler Hammer Electrical Circuit Breakers.Forwards List of Attendees & Handouts ML20198F6711998-12-11011 December 1998 Forwards Insp Repts 50-424/98-08 & 425/98-08 on 980927-1114. No Violations Identified ML20198N9431998-12-10010 December 1998 Ack Receipt of Response, to NOV Issued on 980112 Re Surveillance Testing of Reactor Trip Sys P-4 Interlock Feature at Licensee Facility.Nrc Agrees That Surveillance Testing Not Required ML20196J2181998-12-0101 December 1998 Advises of Planned Insp Effort Resulting from 981102 Insp Planning Meeting.Historical Listing of Plant Issues Called Plant Issues Matrix & Insp Plan,Including Specific Insps Such as in Security & Radiological Protection Areas Encl ML20196J2581998-12-0101 December 1998 Confirms Arrangements Made Between J Bailey & B Holbrook, Re Info Meeting Scheduled for 990210 to Discuss Licensee Performance,New Initiatives & Other Regulatory Issues Pertaining to Listed Facilities ML20196B1231998-11-23023 November 1998 Confirms Telephone Conversation Between J Bailey & P Skinner on 981120 Re Info Meeting Which Has Been Scheduled for 981209 in Atlanta,Ga,To Discuss Issues Re Seismic Retainer Clips ML20196D4981998-11-13013 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examination.Copy of Answer Key & Master Bw/Pwr GFE Encl,Even Though Facility Did Not Participate in Exam.Without Encl ML20195B3391998-11-0909 November 1998 Forwards Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21).No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations & Sound Engineering ML20155H2501998-10-21021 October 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-424/98-05 & 50-425/98-05 Issued on 980723.Concluded for Reasons Stated That Example 2 Violation Occurred as Stated in NOV ML20155A7491998-10-15015 October 1998 Forwards Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926 & Nov.Insp Generally Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML20155B7771998-10-0909 October 1998 Extends Invitation to Attend Training Manager Conference on 981105 in Atlanta,Georgia.Conference Designed to Inform Regional Training & Operations Mgt of Issues & Policies That Effect Licensing of Reactor Plant Operators ML20155B4621998-09-25025 September 1998 Discusses OI Investigation Which Completed on 980728. Investigation Reviewed Circumstances Surrounding Apparent Disabling of Fire Computer Trouble Alarm by Unit Shift Supervisor.Concludes Enforcement Discretion Warranted ML20153B0401998-09-17017 September 1998 Responds to 980904 e-mail Message Making Certain Observations Re Apparent Increase in Reactor Trips at Plant, Units 1 & 2.NRC Concluded That Licensee post-trip Reviews Adequately Conducted & That No Adverse Trends,Apparent ML20153B9311998-09-16016 September 1998 Forwards RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations, Responses for Plant,Units 1 & 2 ML20153F7081998-09-11011 September 1998 Provides Summary of 980909 Meeting Held to Discuss TS & Other Regulatory Issues Re Vogtle Electric Generating Plant. List of Meeting Attendees & Copy of Presentation Slides Encl ML20154C4871998-09-10010 September 1998 Forwards Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815 & Nov.One Violation Involved Failure to Implement Adequate C/As for Repeated Failures to Enter Applicable TS Limiting Conditions for Operation ML20151U7901998-09-0909 September 1998 Discusses 980615 Request for Exemption from Requirement of 10CFR73.55(e)(1) & (f)(1) to Provide Continuous Staffing of Plant CAS During Contingency Events.Request Denied ML20151S7291998-09-0202 September 1998 Discusses Evaluation of Util Response to GL 97-05 for Plant, Units 1 & 2.NRC Did Not Identify Any Concerns W/Sg Tube Insp Techniques Employed at Plant ML20239A4251998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Nov.Nov Responses Will Be Formally Ack as Part of Periodically Issued Integrated Insp Repts 1999-09-01
[Table view] |
See also: IR 05000424/1986091
Text
DFOL
~
8 ,'
8, . . ,o,, ~ UNITED STATES
o NUCLEAR REGULATORY COMMISSION
5 ;j WASHINGTON, D. C. 20S55
\...../
I 1 1937
l
l Ms. Linda Bauman
Government Accountability Project
Midwest Office IN RESPONSE REFER
104 E. Wisconsin Avenue TO F0IA-87-A-52
Appleton, WI 54911-4897 (F01A-87-90)
l
Dear Ms. Bauman:
This is in response to your letter dated July 7,1987, in which you appealed
Mr. Donnie H. Grimsley's form response dated July 1,1987. Mr. Grimsley's
form response denied portions of six documents subject to your Freedom of
Information Act request for documents concerning Inspection Report
50-424/86-91 dated November 13, 1986, concerning drug abuse at the Alvin W.
Vogtle nuclear power plant.
Acting on your appeal, I have carefully reviewed the record in this case and
have determined that the previously withheld information,can now be made
- publicly available. Your appeal is, thereforc, granted.
Enclosed are copies of the documents.
Sincerely.
/_
l /
'
V c or ell Jr.
xecutive Director for Operations
Enclosures: As stated
i
- %e-
l
- - _ _ _ _ _ _ _ _ - _ _ _ _ _
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
'
j R** ***% . 50I4 ~. -t -7-96
RESPONSE TO FREEDOM OF M aa l l raarm
INFORMATION ACT (FOlA) REQUEST '"'
g gg
e..e.
Doca (T esunspieS' is epsareae,
at%tSTt2
N4
PART l.-RECORDS RELE ASED OR NOT LOCATED ISee checked 808881
! *eo agency records subpect to the requeet P. ave been located
{ eso addrtsonal agency records sab,ect to the request have been located
l Agency recomes wbpect to the roowst that are esentshed m Appends
are already averlebee for pubhc mopecten and copying a the NRC Penc Docurnent Room.
l 1717 H Street N.W., Washmgton. DC
!
g Agency receeds subsect to the request that are adentsfod m Appende b are bemg made svedeble for pein; mopeces we copyng e the N9iC PutAc Document
l Roorn,1717 H Street. N W., Washmgton DC, m a folder under the FOIA number and roovester name
l The nonpropsessary version of the proposaits) that you agreed to eccept e a te6ephone conversaten m $ a member of mv staff a noe bomg made evedable for pubiec wupacten
l and coying as she NRC Pubiac Document Room.1717 H Street, N W . Washengton, DC r an a folder under the FOLA nwnber and roosesser name.
l Erwea==re is odermetson on how you may obtam access to and the chargue for copyme records pieced a the NRC Pubic Document Rossi,1717 H Street. N.W , Washmgen. DC.
j Agency recoses subpect to the recpest are enclosed. Any appicable charpe for copes of the records provided and payment procedures are noted m the awnrnents escten
l Records subsecs to the request have been referred to another Federet agencytest for review and derect response to you
l m view of NetC's response to the request no further accon a being taken on appeal letter dated
PART li A-INFORMATION WITHHELD FROM PUBLIC OtSCLOSURE
l
c ,tosn infonummon in the requeeted recorde e bems *'thheid from put$c declosure pursuant to the FOIA enempters descr6ed e and for the reasons stated m Port it, sec-
none S. C. and D. Any redessed portens of the documents for e on8y part of the record a being withheid are being made avaaabte for pubesC e4pectson and copymg en
une NRC Putec Document RMn.1717 M Street N W., Wachegton DC. m a folder under the FOIA number and roguester nome.
.. : .;
,
l
i
- A >>
- m- .: ,
s
s
4 ,
,
s e
-
^l
s
M $.:
l w.4
?
s ,.
,
/
- MC POIM eg ip,,, p
O P7
D U Y Y&
YPL - - - - - - -
- EEDOM OF safFO;MATION ACT CESPONSE sotA NUMeEniSi f@lg-; *(g
,
o,yg g
P2.RT 18 8- APPLICABLE FO4fA EXEMPTIONS
ggo,ds m to the request that er) described in the enclosed Appendices _ ere bemg withheld m thew entwety or in part under FOtA
Exemptione sund for the reasons set forth below pursuant to 5 U.S C. 562tb) and to CFR 9 5de) of NRC Regulations.
1 The unsPeund miormatson es prope$ ciasaded pursuant to Esecutwe Order 12356 (EXEMPfl0N 11
2 The warmeno enformaten resates nosety to the mismal personned rules and procedures of NRC. (EXEMPTON 2
3 The usePeund mformagon a specificalN esemoted from put hc doclosure by statute andicated' IEXEMPfl0N 3
3.ca.n 541146 of the Attwmc Energy Act w vch r prohiteis the declosure of Restrcted Data or Formerly Restreted Data 142 U.S.C. 2161-21061.
'
Secean 147 of the Atomsc Energy Act which proMuts the doctosure of Unclassefed Safeguards informaten 142 U.S C. 2167).
4. The musemed informaten e a trade secret or commeraal or thanced eformatson ther a bosng withheld for the reasonts) indested: (EXEMPTON di
,
The emeermetson a consedered to be confidential busmess l'/opnetary) mformatson
N smemmenon a considered to tw propnetary informaten pursuant to 10 CFR 2]90(d)(1).
The suewmocon was submmed and recewed m confusence from a foreign source pursuant to 10 CFR 2.790 ldh 2).
5 The weeuhmed eformaten consets of eteragency or straagswnr records that are not available through descovery dures litigation. Doctosure of predec enal informatir
g w g, geert the open and frare eachange of essas essental to the doiceratwo process. Where records are unthheld m thew entirety. the fac1s are inent.catiev
h esth the
eidirecs e credecennal anformaten.
anto the predecaenal There
procer of also are no reasonably)segregable
the agency tEXEMPTION D factual portions because the reeese of the facts would permet en
8. The weseused anformagon a esempted from pubiec deciosure trause ris declosure would result in a clearly unwarrarsed iswesen of personal pnvecy. (EAEMPTION se
,.,b.w _ _ e _ of._ ,_yre _ f- w f _ tp_ sa_.,e_g. _ f_.,es _ _a,.d _ ,,,N,t
%., wound eterfere weh an enforcement proceedrig because se could reveal the scope. directen. and focus of enforcement eHorts. and thus could
g mes asow them to take action to stuoid potental wrongdoing or a violataan of NRC toquwements from evestagstors (EXEMPTON 7 tall
W,e would constitum an urmarramed swesen of personas prwacy (EXEMPicN 7tCH
$
The spularmsten consrsts of remes of sidwiduais and other mformation the declosure of wh8Ch would reveal adenoems of Confidential sources. (EXEMPTION 7tDs
PART ff C.OENYING OFFICIALS
a
pursuent to O CFR 9.9 and/or 9.16 Olih* U S Nuc8"e' A**d" tory Commenen reguistens. it has twen determined that the Informsten withheld a w from production or hre
end that ns pseshenon or disclosure e contrary to m putilic interest The persons remonocio for the dennel are thee offican st'oritsised below as denyng offcels and the Direc or
of Runes and Records, Offes of Adminstration. ter any denists that eney be arf *aan=d to the Executrve Director for Operations IEpoi.
OEarvievG OFFICIAL TITLE.0FF4CE RECORCS DENIED APPELLATE OFFICIAL
,
O
I
!
I
PART 11 D- APPEAL RIOMTS j
Tne denisi try each denying fecial idenIlEnd in Part 5.C may be appealed to the Apponete Official irfirntified in that section. Any such appeal must be in I
d ered enuet be made witles 30 days of receipt of this response Appeele must be addrussed as opgopriate to the Executive Director for Operatione or to
the Senatory of the C wnmission. U.S. modner,p Commesson, Weehmgton, DC 20555, and should clearty state on the envelope and in the letter
that a b an ~Appeel from en khief F0lA h=
ene ponas aos spurs a U.S. NUCLEAR AEGULATORY COMMISSION
e, FOIA RESPONSE CONTINUATION l
l
!
__ . _ ____ _ ______ -
- -_.__.-_-_. ___
.. . .
.
RE: F01A-87-90
APPENDlx F
RECORDS MAINTAINED IN THE PDR UNDER THE A50VE REQUEST NUMBER
1. 6/8/82 Letter from R. Pierce Head, Jr. to Erployee and family
concerning Employee Assistance Program (2 pages).
2. 12/10/85 Letter to addressee from Howard Winkler, Re: Labur Relations
Dialogue (5 pages).
3. 3/31/86 Appendix 6, Vogtle Reinspection / Reverification Procedure (8
pages).
4. 9/15/86 Nuclear Regulatory Comission Assessment Vogtle Fitness For
Duty Program Legal classes, 9/15/86 (1 page).
5. UNDATED Notice for Bulletin Board, subject: Jobs At Nuclear Plants (2
, pages).
, 6. 9/15/86 Nuclear Regulatory Connission Assessrent Vogtle Fitness For
Duty Program Anti- Drug Program- testing Anti-Drug Program-
HistoryPackage(36pages).
7. 1/22/87 Letter from Phillip F. Mclkee to William E. Cline, subject:
l Followup to Fitness For Duty Inspection at Vogtle. (2 pages).
i
l
l
L
.____.___m__-_ _ _ . _ _ - - _ _ _- - - -----
1
'
I
i
Re: F01A-87-90
APPENDIX G
RECORDS PARTIALLY WITHHELD
1. UNDATED D0L Complaint by Five Former Vogtle Employees (1 page).
2. 8/12/82 Opinion and Award in the Matter of Arbitration Between Georgia l
Power Co. and Local Union No. 424 International Union of
Operating Engineers (13 pages). Ex. 6
3. 1/10/85 Judgement In a Civil Case Plantiff vs. Walsh Construction Co.,
Case CV184-084 (12 pages). Ex. 6
4. 2/21/85 Letter from Chester L. Davidson to William Contracting Co.
w/ copies of 2 grievances (2 pages). Ex. 6
5. 6/19/85 Letter from Chester . Davidson to Williams Contracting Inc.
concerning grievances. (2 oages). Ex. 6
6. 9/15/86 Nuclear Regulatory Commission Assessment Vogtle Fitnes for Duty
Program Union Coordination, 9/15/86 (1 pages. Ex. 6
,
i
l
l
l
.
. .
l
,
GOVERNMENT ACCOUNTABILITY PROJECT
l
1555 Connecticut Awnue. N.W. Suite 202 i
Washington. D.C. 20036 (202)202-8550
j
l
GOVERNMENT ACCOUNTABILITY PROJECT ,
MIDWEST OFFICE
3424 MARCOS LANE
-APPLETON, WISCONSIN 54911
January 29, 1987
FREEDOM OF INFORMATION ACT REQUEST
~
MtEEDOM OF INFORMAN
Director ACT REQUEST -
Office of Administration
U.S. Nuclear Regulatory Commission P 2"A "3 7* fO
Washington D.C. 20210 O_ _a# tg g g
_
y
TO WHOM IT MAY CONCERN:
Fursuant to the Freedom of Information Act- (FOIA), 5 U.S.C. 552,.
the Government Accountability Project (GAP)' requests copies of any and
all agency records and information, including but.not limited to notes,
letters, memoranda, draf ts, minutes, diaries, logs, calanders, tapes,
transcripts, summaries, interview; reports, procedures, instructions,
engineering analyses, drawings, files, graphs; charts, maps, photographs,
agreements, handwritten notes, studies, data sheets, notebooks, books,
telephone messages, computations, voice recordings, computer runoffs,
any other data compilations, interim and/or final reports, status reports,
and any and ,all other records relevant to and/or generated in connection
with Inspection Report 50-424/86-91, dated November 13, 1986, regarding drug
abuse at Vogtle.
This request includes all agency records as defined in 10 C.F.R.
9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved ,
October 8,1980) whether they currently exist in the NRC "offical, working" l
investigative or other files, or at any other location, wincluding private ;
residences.
If any records, as defined in 10 C.F.R. 9.3a(b), and the NRC Manual, q
oupra, and covered by this request have been destroyed and/or removed after j
this request, please provide all surrounding records, including but not
-
.
limited to a list of all records which have been or are destroyed and/or 1
removed, a description of the action (s) taken to, generated in connnection
with, and/or issued in order to implement the action (s). l
<
l
!
l
i
'
.
.. .
)
l
GAP requests that fees be waived, because _ " finding the
information can be considered as primarily benefiting the general
public, " 5 U.S.C. 522 (a) (4) (a). GAP is a non profit, non-partisan.
public interest organization concerned with honest and open government.
Through public outreach, the Project promotes whistleblowers as agents
of government accountability. Through it Environmental Whistleblower
Clinic, GAP of fers assistance to local public interest and citizens
groups and interveners in the concern for safety at nuclear power plants.
We are requesting this information as part of an ongoing monitoring !
project of the NRC's ef forts to protect public health and safety at !
and near nuclear processing plants and radioactive waste facilities.
For any documents or portions that you deny due to a specific. i
FOIA exemption, please provide an'index itemizing and describing the ;
documents or portions of documents withheld. The index should provide j
c detailed justification of your grounds for claiming each exemption, l
explaining why each exemtion is relevant to the document or portion 1
of the document withheld. This index is required under Vaughn v.
~
I
Rosen (I), 484 F2d 820 (D.C. Cir. 197.3), cert. denied, 415 U.S.
-
977 l
'
(1974).
we look forward to your response to this request within ten (10).
working days.
Sincerely,
Y $ EW/f
Linda Bauman 1
i
FOIA Coordinator
Midwest Office
l
Responses to this request should be mailed to :
'
Government Accountability Project
Midwest Office
3424 Marcos Lane
Appleton, Wisconsin 54911 l
( _ _