Informs That Both Seismic Instrumentation & Hydrogen Control Equipment Will Be Accessible at Time of Aslab Visit,Per 860403 Telcon Re Hearing on Ocre Motion to Reopen Proceeding.Personal Info Requested by 860509.Svc List Encl
ML20203D723
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/16/1986
From: Silberg J
CLEVELAND ELECTRIC ILLUMINATING CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Johnson W, Rosenthal A, Wilber H
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
References
CON-#286-879 OL, NUDOCS 8604220306
Download: ML20203D723 (3)


Text

f SHAW, PITTMAN, PoTTs & TROWBRIDGE a **ar,.cas,c, or enoressio at coa oa rio DOLME TED 1800 M STRE ET, N. W.

WASHINGTON, D. C. 20036 rtLtco,it a

, 02 est-coe 4. e22-Hee TELEX 89-2693 isMAWLAW wSM, OFFICE OF SiGnt ' ' *** E *'**'

00CKETING A LEh'd.! rcLc o, c JAY E. SILBERG. P C. BRANCH ino2,s w.o.3 April 16, 1986 Alan S,. Rosenthal, Chairman Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. W. Reed' Johnson Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Howard A. Wilber Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: The Cleveland Electric Illuminating Company (Perry Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-440 and 50-441 Ob Gentlemen:

During the April 3, 1986 conference call concerning the exploratory hearing on OCRE's motion to reopen, the Appeal Boari stated that it wished, if possible, to examine the sei .ic instrumentation on the facility site as well as ele-ments of the Perry hydrogen control system. Applicants pointed out that portions of the facility might be inaccessible due to constraints associated with initial criticality and startup testing activities. We committed to provide further in-formation on the accessibility of the equipment to the Board.

Based on information provided by CEI personnel, both seismic instrumentation and hydrogen control equipment will be accessible at the time of the Appeal Board's visit. Regardless of when initial criticality occurs, six seismic monitoring 8604220306 PDR 860416 ADOCK 05000440 PDR Q() b

-f i'

$H AW, "'TTM AN, PoTTs & TROWB RIDG E A Pash. .asnep sNCLUDeNG PROFESSCN AL CORPORATONS Messrs. Rosenthal, Johnson and Wilber April 16, 1986 Page Two instruments would be accessible and/or visible. Instruments D51-N101 and D51-R160 are located in the Fuel Handling Building and are readily accessible. Three instruments (D51-R140, D51-R180 and D51-R190) are located in the Auxiliary Building in the High Pressure Core Spray and Reactor Core Isolation Cooling rooms and are accessible. A fifth instrument (D51-Nill) is lo-cated on the outside of containment and would be accessible, but only to those willing to climb an eighty foot ladder.

Three seismic monitors (D51-R130, D51-R170 and D51-R120) are located in the drywell and would not be accessible during ini- -

tial criticality testing and access will be limited after ini-tial criticality depending on the status of start-up testing.

(Initial criticality is currently scheduled for early May).

A ntmber of hydrogen igniters would be accessible regard-less of the initial criticality schedule. Seventeen are in non-radiation areas inside containment within 15 feet of the floor. Twenty-two are located in potential radiation areas in-side containment; access to them could be restricted after ini-tial criticality. Seventeen igniters are located inside the drywell'and would not be accessible during initial criticality testing and access will be limited after initial criticality depending on the status of startup testing. The remaining ig-niters are in non-radiation areas in containment but are more than fifteen feet above the floor and therefore may not be eas-ily accessible.

In order to comply with access and health physics require-ments for a plant visit, CEI will need the name, date of birth, Social Security number and radiation exposure for the current calendar quarter, if any, of each visitor. In crder to expe-dite plant entry, this information should be provided by Friday, May 9, and may be telephoned directly to Michael Minns at the Perry Plant, (216) 259-3737 ext. 5603. At the time of the visit, each visitor must have some form of positive identi-fication, with photograph (such as an NRC identification or driver's license). The identification need not include the visitor's Social Security number.

1 V truly you s, C d' / b Ja E. Silberg CoQnse for Applicants  ;

JES:L ,

cc: Service List

F 8

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD In the Matter of )

)

THE CLEVELAND ELECTRIC ) Docket Nos. 50-440 ILLUMINATING COMPANY, ET AL. ) 50-441

)

(Perry Nuclear Power Plant, )

Units 1 and 2) )

SERVICE LIST Alan S. Rosenthal, Chairman Atomic Safety and Licensing ,

Atomic Safety and Licensing Appeal Board Panel Appeal Board U. S. Nuclear Regulatory Commissic U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Washington, D. C. 20555 Dr. W. Reed Johnson Docketing and Service Section Atomic Safety and Licensing Office of the Secretary Appeal Board U. S. Nuclear Regulatory Commissic U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Washington, D. C. 20555 Mr. Howard A. Wilber Colleen Woodhead, Esquire Atomic Safety and Licensing Office of the Executive Legal Appeal Board Director U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commissic Washington, D. C. 20555 Washington, D. C. 20555 James P. Gleason, Chairman Terry Lodge, Esquire 513 Gilmoure Drive Suite 105 Silver Spring, Maryland 20901 618 N. Michigan Street Toledo, Ohio 43624 Jerry R. Kline Ms. Susan L. Hiatt Atomic Safety and Licensing Board 8275 Munson Avenue U.S. Nuclear Regulatory Commission Mentor, Ohio 44060 Washington, D.C. 20555 Glenn O. Bright Donald T. Ezzone, Esquire Atomic Safety and Licensing Board Assistant Prosecuting Attorney U.S. Nuclear Regulatory Commission Lake County Administration Center Washington, D.C. 20555 105 Center Street Painesville, Ohio 44077 Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Board Panel U.S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commissic Washington, D.C. 20555 Washington, D.C. 20555 John G. Cardinal, Esquire Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047