QN anATED CCGaWD%

SHAW, PITTMAN, PoTTs & TROWBRIDGE A PARTNER $wep OF PROFESSION AL CORpoRAftoNS 1800 M STR E ET N. W.

WASHINGTON, O. C. 20036 TELEcopiER 12O21822-1099 & 822-ft99 TELEX 89-2693 ISMAwLAW WSMa CABLE **SMAwLAW" July 22, 1985 -

DCCdETED TEtEpwoNE JAY E. SILBERG. P.C. USNRC 'ao2' 822-.oes James P. Gleason, Chairman Atomic Safety and Licensing Board 85 JUL 24 A10:40 513 Gilmoure Drive Silver Spring, Maryland CFflCf 0F SECRETAP DOCKET hG & SEFVJi.

Dr. Jerry R. Kline BRMCH Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Glenn O. Bright Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington', D. C. 20555 Re: The Cleveland Electric Illuminating Company (Perry Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-440 and 50-4410L Gentlemen:

Enclosed for the Board's information is a July 11, 1985 letter from Cleveland Electric to the NRC Staff setting forth the most recent update on progress on Unit 1 of the Perry Nuclear Power Plant.

,, er truly y urs, .

l) v Of Ja'[E lberg Counssl (or Applic ntd '

j /  ! j JES:L 1

i j

/ l Service List A 850722

.O l05000440

o

, UNITED STATES OF AMERICA l NUCLEAR REGULATORY COMMISSION i BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

THE CLEVELAND ELECTRIC ) Docket Nos. 50-440 ILLUMINATING COMPANY ) 50-441

, )

(Perry Nuclear Power Plant, )

Units 1.and 2) )

SERVICE LIST .

James P. Gleason, Chairman Atomic Safety and Licensing 513 Gilmoure Drive Appeal Board Panel Silver Spring, Maryland 20901 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Jerry R. Kline Docketing and Service Section Atomic Safety and Licensing Board Office of the Secretary U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Mr. Glenn O. Bright Colleen P. Woodhead, Esquire Atomic Safety and Licensing Board Office of the Executive Legal U.S. Nuclear Regulatory Commission Director Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Christine N. Kohl, Chairman Atomic Safety and Licensing Terry Lodge, Esquire Appeal Board Suite 105 U.S. Nuclear Regulatory Commission 618 N. Michigan Street Washington, D.C. 20555 Toledo, Ohio 43624 Dr. W. Reed Johnson Donald T. Ezzone, Esquire Atomic Safety and Licensing Assistant Prosecuting Attorney Appeal Board Lake County Administration U.S. Nuclear Regulatory Commission Center

! Washington, D.C. 20555 105 Center Street Painesville, Ohio 44077 Gary J. Edles, Esquire Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 John G. Cardinal, Esquire Ms. Sue Hiatt Prosecuting Attorney 8275 Munson Avenue Ashtabula County Courthouse Mentor, Ohio 44060 Jefferson, Ohio 44047

.o iH. i  :- .

t i f, N D f : i t. 't li ! U MIN ATIN G COMPANY P.O. Box 5000 - CLEVELAND. oHlo 44101 -

TELEPHONE (216) 622 9800 - ILLUMINATING BLoG - $$ PUBLIC SOUARE Serving The Best Location in the Nation MJRRAY R. EDELMAN v1CE MESIDENT NUCUAR July 11, 1985 PY-CEI/NRR-0291 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Unit 1 Progress Update

Dear Mr. Youngblood:

This letter is provided as an update of our progress on Unit 1 of the Perry Nuclear Power Plant for the month of June,1985. We recently announced that fuel load has been shifted from June until September, 1985. A summary of those activities which have occurred since our last update (June 11, 1985) follows.

Construction Construction is about 99% complete. We do not expect any construction related  !

items to impact our fuel load schedule.

Preoperatonal Testing 1

66 of 106 preoperational tests have now been completed in the field and results are undergoing review and approval. The Reactor Recirculation (B33) test has been completed in the field and, following the data reduction process, should be approved this month. The Division 1 & 2 diesel generators have been turned over to the Perry Plant Operations Department. The Structural Integrity and Integrated Leak Rate Tests are scheduled to begin next week. Our preoperation-al test program is progressing as shown on Figure 1.

Licensing SER Issue resolution is progressing well. Information to close outstanding Issue 8 - Mark III Containment System (Humphrey) Issues was transmitted to NRC on June 24, 1985. This leaves only four (4) Outstanding Issues remaining open.

We expect to submit information to resolve all of the Outstanding Issues by August 15, 1985. Fifteen (15) Confirmatory issues remain open. Five (5) of these are awaiting NRC site visits for closeout. Information has been provided by CEI to close all of these confirmatory issues.

l l

l

n- 3

+.

O Mr. B. J. Youngblood, Chief July 11, 1985

+

PY-CEI/NRR-0291 L Fif teen (15) recent Requests for Additional Information are outstanding. CEI

  • has been promptly responding to requests for additional information as they are received. We anticipate closure of all remaining items well before fuel load.

We will continue to update you on a monthly basis until fuel load. If you have any comments or questions, please feel free to contact me.

Very truly yours, l%q LE Murray R. Edelman Vice President Nuclear Group HRE:njc Attachment ec: Jay Silberg, Esq.

John Stefano (2)

J. Grobe

FIGURE I UNIT 1 & COMMON NUCLEAR TEST SECTION PREOPERATIONAL TESTS 140-120-pod"

  1. 100-

/

. O /

I h /

I d #/

z 80- /

0

/

/l/

s0-r .

8 4 40-20-SCDEDIA.ED .,s, NOTE: MASTER PLAN REVISIO98 gg OssJUBE 30. 1988 0

JLA. AUG SEP OCT NOW DEC gM FEB MAR APR MAY JL20 JLA. AUG SEP OCT NOV OEC THes sCHEn 7 17 11 10 2 N ACTUAL 0 3 1 4 8 1 3 6 11 14 6 7 SCHED.

TODATE 66 83 94 104 106 ACTUAL 4 7 8 12 18 19 22 28 39 $3 59 66

NRC STATUS TRACKING

- % COMPLETE -

THROUGH JUNE 1985 PROGRAM PERRY +1 PERRY

  • 2

~

SITE PREPARATION 100.0 100.o CONTAINMENT-CONCRETE 100.o 94.8 CONTAINMENT-PRE-STRESS N/A N/A CONTAINMENT-STEEL 99.7 95.8 STRUCTURES 99.o 88.8 REACTOR PIPING 100.0 14.2 OTHER PIPING 99.9 19.4

~

REACTOR PRESSURE VESSEL 100.o 98.8 COMPONENTS 98.8 35.2 ISI/ PSI PIPING EXAMINATIONS 100.0 15.0 PIPE SUPPORTS .

99.6 (1) 15.8 FUEL RACKS 100.0 0.0 ELECTRICAL-COMPONENTS & SYSTEMS 99.7 27.4 ELECTRICAL-CABLE & TERMINATIONS 99.6 0.o INSTRUMENTS-COMPONENTS & SYSTEMS 98.7 2.8 INSTRUMENTS-CABLE & TERMINATIONS 99.8 (2) 11.6 (1) DECREASE FROM LAST PERIOD CAUSED 1)Y ITEMS IDENTIFIED DURING SYSTEM VIBRATION TESTING AND I.D.I. REVIEW (INDEPENDENT DESIGN INVESTIGATION).

(2) INCLUDES TERMINATIONS (oNLY CABLE REPORTED IN LAST

[ TWo PERIODS).

i

-