ML20204J582

From kanterella
Revision as of 11:40, 30 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Insp Repts 50-327/86-36 & 50-328/86-36 on 860616-20 & Notice of Violation.Items Described in Paragraph 14 of Rept Require Action Prior to Restart
ML20204J582
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/23/1986
From: Zech G
NRC
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20204J588 List:
References
NUDOCS 8608110145
Download: ML20204J582 (2)


See also: IR 05000327/1986036

Text

~

.

.

ML 23 IN6

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Tennessee Valley Authority -

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-327/86-36 AND 50-328/86-36)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

R. E. Weddington on June 16-20, 1986. The inspection included a review of

activities authorized for your Sequoyah facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

require;nents. The violation, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of

Violation.

Please note that Paragraph 14 of the enclosed inspection report describes items

requiring licensee action prior to restart.

In accordance with Section 2.790 of the NRC's " Rules of Practice, Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Mk

G

[

[6b

.

.

Tennessee Valley Authority 2

Should you have any questions concerning this letter, please contact us.

Sincerely,

Gary G. Zech, Director

TVA Projects

Enclosures:

1. Notice of Violation

2. Inspection Report

cc w/encls:

M. Abercrombie, Sequoyah Nuclear Plant

V.SiteDirector

R. Wallace, Plant Manager

W W. Whitt, Director, Nuclear

Managers Review Group

kl. Williams, Jr. , Supervisor l

Licensing Section

'

04. Kirk, Compliance Staff Supervisor

J. E. Wills, Project Engineer

bec w/encls:

tJ. N. Grace

k D. Walker

b R. Denton, NRR

V L. Thompson, NRR

& M. Taylor, IE

U B. Hayes, 01

k R. Connelly, OIA

SrP. Weise

NRC Resident Inspector

pocument Control Desk

5 tite of Tennessee

!

!

RII R F RII 1

.

AJ 4 sac R I,l

RIIt >f f,lI

RWeddington:bhg DCollins JP! r BDebs SWeise

7/ /h86 CHo3

7/g/ )867/15/86 7/ t/86 7/i 1/86 7/p86

i.