ML20206G774

From kanterella
Revision as of 07:06, 29 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy
ML20206G774
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/03/1999
From: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20206G779 List:
References
50-263-99-02, 50-263-99-2, NUDOCS 9905100139
Download: ML20206G774 (2)


See also: IR 05000263/1999002

Text

.

  • I .

May 3, 1999

Mr. M. Wadley '

' President, Nuclear Generation

1 Northern States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

' SUBJECT: MONTICELLO INSPECTION REPORT 50-263/99002(DRP)

Dear Mr. Wadley:

On April 8,1999, the NRC completed an inspection at the Monticello reactor facility. The

enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the Monticello l

facility was professional and safety conscious. Evolutions such as surveillance testing and

plant power changes were well controlled, deliberate, and performed in accordance with

procedures.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred. This violation is being treated as Non-Cited Violation (NCV), consistent

with Appendix C of the Enforcement Policy. The NCV is described in the subject inspection

report. If you contest the violation or severity level of the NCV, you should provide a response

within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with

copies to the Regional Administrator, Region lil, and the Director, Office of Enforcement, United

States Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response, if you choose to provide one, will be placed in the NRC Public

Document Room.

Sincerely,

/s/ R. D. Lanksbury

Roger D. Lanksbury, Chief

Reactor Projects Branch 5

Docket No. 50-263

License No. DPR-22

Enclosure: Inspection Report 50-263/99002(DRP)

cc w/ encl: Plant Manager, Monticello

S. Minn, Commissioner, Minnesota )

Department of Public Service

DOCUMENT NAME: G:\MONT\ MON 99002.DRP l

To receive a co w of this document, Indicate in the box *C" = Copy w/o attach /end "E" = Cooy w/ attach /enci "N" = No copy

'

OFFICE Rill:DRP t- Rlli:DRP l0 l

NAME Kunowski/co AY LanksburyFa f

DATE F g /99 6 3 /99

OFFICIAL RECORD COPY

9905100139 990503 F

PDR ADOCK 05000263

C PDR j

f )

Vg,ik; * )

.

l

-

! M. Wadley -2- i

1

i

Distribution:

CAC (E-Mail)

RPC (E-Mail) l

Project Mgr., NRR w/enci

l J. Caldwell,' Rlll w/enci

B. Clayton, Rill w/ enc!

il

l SRI Monticello w/enci

'

DRP w/enci

DRS w/enci l

Rill PRR w/enci l

l PUBLIC IE-01 w/enci {

- Docket File w/ encl l

GREENS l

IEO (E-Mail)

DOCDESK (E-Mail)

t .-

(

l

l

l '

i I

l

)1

>

l

P

l

h*

100018

1

,

'