ML20196K385

From kanterella
Revision as of 21:04, 15 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Exam Rept 50-302/OL-88-01 Administered on 880112-14
ML20196K385
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/01/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20150A985 List:
References
NUDOCS 8803150294
Download: ML20196K385 (2)


Text

b i

?

March 1, 1988 Florida Power Corporation ATTN: Mr. W. S. Wilgus, Vice President Nuclear Operations ATTN: Manager, Nuclear Licensing P. 0. Box 219 Crystal River, Florida 32629 Gentlemen:

SUBJECT:

CRYSTAL RIVER NUCLEAR PLANT EXAMINATION REPORT 302/0L-88-U1 The NRC administered examinations on January 12-14, 1988, to employees of your company who had applied for licenses to operate the Crystal River Nuclear Plant.

At the conclusion of thc written examination, a copy cf the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination "coort, Enclosure 1.

Copies of the wi . ten examination questions and answer key are included in this report as Enclosure 2. Facility comments regarding the written examination are included in this report as Enclosure 3.

In accordance with 10 CFR 2.700(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (ORIGINAL SIGNED BY C. A. JULIAN) 8803150294 880301 PDR V ADOCK 05000302 PDR Caudie A. Julian, Chief Operations Branch Division of Reactor Safety

Enclosures:

1. Exam Report 50-302/0L-88-01
2. R0/SR0 Exam Questions & Answer Key
3. Facility Convents cc w/encls 1 & 3:

P. F. McKee, Plant Manager cc w/encls 1, 2 & 3:

L. C. Kelley, Training Supervisor bcc: (See Page 2) 42- g

Florida Power Corporation March 1, 1988 bec w/enci 1:

H. Silver, Project Manager, NRR B. A. Wilson, Section Chief, DRP W. Dean, OL Examiner, DRS State of Florida bec w/encls 1, 2 & 3:

Senior Resident Inspector -

Operator Licensing Branch, DLPQ:NRR document Control Desk INEL, Contractor l

l I RIl l Ril RI PRS aw:obw W KEB c an CA an 4/7/88 ">/12/88 /r6/88 ///88 L -