Forwards Insp Rept 50-440/97-14 on 970915-19.No Violations Noted.Radiation Protection Dept Successful in Maintaining Station Dose ALARA & Strengths Were Noted in Coordination Between Depts for pre-job Radiological Planning
ML20198L666
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/17/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20198L670 List:
References
50-440-97-14, NUDOCS 9710270115
Download: ML20198L666 (2)


See also: IR 05000440/1997014

Text

p.

, 9ac  %

A

.

October 17,1997

Mr. Lew W. Myers

Vice President Nuclear

_

Centerior Service Company

P.O. Box 97, A200

Perry, OH 44081

SUBJECT: NRC ROUTINE RADIATION PROTECTION INSPECTION REPORT

50-440/97014(DRS)

Dear Mr. Myers:

On September 19,1997, the NRC completed an Inspection at your Perry Nuclear Power Plant.

The purpose of this inspection was to review your radiation protection program. The enclosed

report presents the results of this inspection.

Overall, the radiation protection department was successful in maintaining station dose as low

as reasonably achievable (Al. ARA), and strengths were noted in coordination between

departments for pre job radiological planning. However, several problems were identified

during the inspectors' review of the main steam line plug installation. These problems included

an unclear scope for the pre-job radiological survey, changes to the diver's orientation not

incorporated into the ALARA plan, and confusion regarding stop work requirements. While the

At. ARA plan incorporated problems identified at other facilities during similar evolutions, and the

ALARA briefing presented the necessary information to complete the activity, the ALARA plan

was not effectively implemented. These problems were due, in part, to poor communication of

the expectations and the requirements to the appropriate personnel,

in accordance with 10 CFR 2.790 of the Commissions regulations, a copy of th!n letter and the

enclosure will be placed in the NRC Public Document Room.

,

t

T/ L?N I l  :

A  !

apumppg  :

'

W'm ms%

a m

-_ . .. -- .- , - - . . - . . . - - - ---. . ...

- - - - - . .. . - . - - - - - . - . . . . - - . - . . - - - . - - - - .

.

o

L. W. Myers 2 October 17, 1997 l

,

(

l

We will gladly discuss any questions you havo conceming this inspection. l

l

'

Sincerely,

i

Original Signed by John A. firobe i

i

John A. Orobe, Director

Division of Reactor Safety

Docket No. 50-440

License No NPF 58

Enclosure: Inspection Report 50-440/97014(DRS)

cc w/ encl: H. L. Hegrat, Manager, Regulatory Affairs

T. S. Rausch, Director, Quality and

Personnel Development  !

R. W. Schrauder, Director, Perry

Nuclear Engineering Department

W. R. Kanda, General Manager,

Nuclear Power Plant Department

N. L. Bonner, Director, Nuclear

Maintenance Department

H. W. Bergendahl, Director, Nuclear

Services Department

Terry L. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

Roy P. Lessy, Jr., Esq.

Distribution:

Docket File w/ enc! Rill PRR w/en:1 Rill Enf. Coordinator a/enci

PUBLIC IE 01 w/enct SRI, Perry w/enci TSS w/enci

OC/LFDCB w/enci LPM, NRR w/enci DOCDESK w/enci

DRP w/ encl A. B. Beach, Rlli w/ encl CAA1 w/enci ,

DRS w/enct J. L. Caldwell, Rlli w/enci

DOCUMENT NAME: G:\DRS\PER97014.DRS

v. ., .. . . % , w c .c - . e , , - ,. r .e m . u = n =m o v . = =

l OFFICE - Rlil:DRS E Rlli:DRS l c. Rlil:DRP( , f R!Ij;pSAi, l

-lNAME KSelburg:Jp KAfi GShear (45 GWr)Dht [W Jdr@ lid

lDATE 10/14/97 10/N/97 - 10/p/97/ 10/d/97

OFFICIAL RECORD COPY

i.

__ . _ _ _ _. . _ . .._ _... _.___. . _. _ _

._