ML20199J918

From kanterella
Revision as of 05:26, 19 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986
ML20199J918
Person / Time
Site: Midland
Issue date: 06/30/1986
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
32755, ALAB-106, NUDOCS 8607080461
Download: ML20199J918 (1)


Text

_ _ _ _ _ _ ___

Power O CODSum8IS CampHDy ^ " " "

Vice President - Projects, Engineering and Construction General offices: 1945 West Pernall Road, Jackson, MI 49201 e (517) 788-0453 June 30, 1986 Director of Office of Inspection and Enforcement Att: Mr James Taylor US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 QUARTERLY REPORT #51 DOCKET NO.S 50-329 AND 50-330 FILE: 0.4.6 SERIAL: 32755

Reference:

a) Letter, J W Cook to J Taylor, ALAB-106 Quarterly Report, Serial 32635, dated March 31, 1986 No new individuals have been assigned quality related duties since the last report (reference a); thus no resumes are required for this report.

Construction at the Midland Energy Center has been shut down since July 16, 1984. No construction activities are projected for the period July 1, 1986 through September 30, 1986.

The next ALAB-106 Quarterly Report will be sent t end of September, 1986.

JWC/WRB/lr CC: JCKeppler, NRC Region III 8607080461 DR 860630 ACOCK 0500 9 OC0686-0075A-MP02 j

.