ML20132E090

From kanterella
Revision as of 03:29, 23 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
FOIA Request for Six Categories of Documents Re Wolf Creek Generating Station
ML20132E090
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/06/1985
From: Devine T, Varricchio M
GOVERNMENT ACCOUNTABILITY PROJECT
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-85-101 NUDOCS 8507170625
Download: ML20132E090 (2)


Text

.-..__,,,_.,,=-.-----------_; ,

=

0 I i

GOVERNMENT ACCOUNTABlUTY PROJECT 1555 Connecticur Avenue, N.W., Suite 202 l Washington D.C. 20036 (202)232-8550 l f

February 6, 1985 Director gp OF INFORMATK)N Of fice of Administration g@l Nuclear Regulatory Commission *\

Washington, D.C. 20555 hQ[

To Whom It May Concern: Y Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.

5552, the Government Accountability Project (GAP) requests copies of any and all agency records and information, . including but tiu t i

limited to notes, inter-office memoranda, letters, memoranda, j

drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, engineering analyses, drawings, files, graphs, maps, photographs, agreements, l handwritten notes, studies, data sheets, notebooks, telephone messages, books, computations, voice recordings, computer run-offs, representa tive recordc, interim and/or final reports, status reports, and any and all other records relevant to and/or

) generated ST:;- 5 0- 4 8 2 inir. connection with the Wolf Creek Generating Station the following areas:

on Wolf Creek.

Institute of !;uclear Power Operations 1983 (I!;PO) Report This report, referred to in an October 9, 1984 letter fror. Darrel G. Eisenhut, Director of the Of fice of t;uclear Reactor Regulation, to Michele Varricchio of the Government Accountability

RC Of fice of Project, was received on the Wolf Creek site by reprccentatives, Inspection and Enforcement and !;FC Pegion IV i

I t '. u '. a w. t i o r.s conn. tc d u r i r. ; co n r * : ..; c . i o:. an' l i c t r. ' i n g cf the *.iolf Creek Generating Station by the ::PC Of fice of Investigations,

RC mee ting of January 15, 1985 with Kansas Gas and Electric to discuss the operational readiness of Wolf Crock l

and a February 6, 1985 meeting held for the same purpose,

!?RC meeting held in Bethesda Maryland on November 28, 1984 to discuss the status of completion and future schedule for '

licensing of Wolf Creek, i

0507170625 050206 PDpt FOIA VARRICCBS-101 PDR l

a Director Page two Office of Administration February 6, 1985 NRC investigations and inspections regarding the allegations of James Wells, employee at Wolf Creek.

  • NRC Region IV meeting October 29, 1984, Enforcement Conference.

If any records as defined in 10 CFR F,9.3(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s).

GAP requests that fees be waived, because providing the requested information "can be considered as primarily benefitting the general public," 5 U.S.C. 552 (a) (4) (A) . GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through legal representation, advice, national conferences, films, publications, and public outreach, GAP promotes whistle-blowers as agents of governmental accountability.

GAP is currently working with citizens groups in the Kansas area concerning the Wolf Creek Generating Station, i

For any docunents or portions of documents that you deny access to, please provide an index, au required by Vauchn v. Boren, 484 F.2d 820 (D.C.Cir. 1973), cert. denied, 415 U.S. A T IFiM ) ,

itemizing and describing the documents or portions of documents withheld, and providing a detailed juntification of your grounds for claiming each exemption.

Thank you for your prompt response to this request. We look forward to such a response within ten dayn.

Sincerely,f

/

'ttichele Varricchio Law Clerk .

LoyM2.1' (s Thomas Devine Legal Director l