ML20138P136

From kanterella
Revision as of 06:49, 22 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rev 2 to Procedure CP-QP-2.2, Indoctrination of Record Verification Personnel
ML20138P136
Person / Time
Site: Comanche Peak, 05000000
Issue date: 04/20/1981
From: Tolson R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20138M609 List: ... further results
References
FOIA-85-59 CP-QP-2.2, NUDOCS 8511060423
Download: ML20138P136 (3)


Text

-_ - -. . . _ . _- -- .-. _. - -. _. -. __ ._ -

! f PROCEDURE l ISSUE I REVISION PAGE TEXAS UTILITIES GENERATING CO j NUMBER I DATE l CPSES CP-0P-2.2 2 . APR 2 0 1991i i of 3 i

! PREPAREDBY:"I ' '

Ar@ w & M-[

E j INDOCTRINATION OF .

RECORD VERIFICATION PERSONNEL j 4' APPROVED BY: . e.v/ #do/f7 I ME '

~

j

1.0 REFERENCES

("

j 1-A QI-QP-15.2-1, "Startup/ Turnover Record Verification" ,, J 2.0 GENERAL

2.1 PURPOSE ,,

The purpose of this procedure is to provide personnel irvosved

.in Record Verification activities with functional and quality l requirments applicable to the Record Verification Prog.am.

i '

2.2 AUTHORITY The Records Management Supervisor has been delegated attrority for the administration of the requirenents set forth ir .his procedure. l

3.0 PROCEDURE >

r i 3.1 INDOCTR!faTION

) All personnel involved in the Record Verification sha:1 complete i the indoctrination process. The indoctrination requi es that  ! ,

j each member involved in Record Verification read the focuments j specified on Figure 1 and upon completion of each reading

, assignment, sign and date the space provided on Figure 1.

l When all reading assignments have been concluded, the member i shall submit the completed Figure 1 Fonn to the Records .

! Managenent Supervisor.

! To complete the indoctrination process, the Records Management

! Supervisor will review and discuss with each Record Verifi-cation member the contents of each document specified on Figure

1. When the $Jparviwe is assured that Records Verification
personnel understand the contents of the documents in Figure 1 and is satisfied as to their ability to perform record verifi-i cation such as
drawing and specification review, checklist preparation, utilization of CRT and computer printouts and hard j copy review, he shall sign and date the space provided. 1
i j ,,,.,,,,,, TUGCC o4 - .

4 g i g p 851016

. ..-., =

TEXAS UTILITIES GENERATING CO.

CPSES CP-QP-2. 2 2 APR 2 0 1981 2 of 3 3.2 DOCUMENTATION The documentation of the indoctrination process is provided on the completed Figure 1 fom. The fom will be filed and maintained in the TUGC0 QA S/T Files.

4 p, g 3 TUCCO QA

I PROCEDURE REVISION ISSUE NUMBER DATE PAGE TEXAS UTILITIES GENERATING CO.

CPSES CP-QP-2.2 2 3 Of 3 Pl P. 2 0 1981 FIGURE 1 C M FEAK STEAN ELECTRIC STATION STARTUF/ TURNOVER INDOCIRINATION OUTLINE i

E888s Signature Date

'1. AF M IR S TO 10CF150

2. ANSI N45.2
3. 10CFR50.S$ (e)
4. 10CFR Part 21 I S. ANSI N43.2.10
6. TUCCO STARTUF FROGRAM F1.AN
7. TUCCO STARTUF ADMINISTRATIVE FROCDURES A. CF-SAF-1 ,

E. CF-SAF-2 l C. CF-SAF-3

! CF-SAF-4 D.

E. CF-SAP-4 ,

8. RIC. GUE t 1-44 ..
9. FSAR "Q" LIST
10. CP-qP-2.2 ..

i .

11. CP-qr-15.2
12. QI-qt 13.2 1 l 13. orurR:

IISOCTRINATION FROCESS VERIFI G W CGIFLITE f

i reem % TUGCO OA J

.-