TEXAS UBUTES GENERATING CO.

NU Sq

. REVISICN PAGE l

CPsEr

.l i

I QI-QP-11.4-9 3

1 of 3 i

SEP 3 1982'

~ ~ ~ ~

'PREPAREDBY:/ y[/g [*.

p/g/,p2 INSPECTION OF SHOP CAT l

PRIMED EQUIPMENT e

APPROVED BY v

j g

APPROVED BY:

Lf3

/

v v

DATE'

1.0 REFERENCES

l i

l 1-A QI-QP-11.4-5,

" Inspection of Steel Substrate Surface j

Preparation and Primer Applications and Repair" i

1-B CP-QP-18.0, " Inspection Reports" l

l 1-C CP-QP-16.0, "Nonconfonnances and Deficiencies" j

l 2.0 GENERAL I

,.o U

This Instruction will describe methods used by Quality Control personnel for inspection of shop primed equipment to be installed inside of Containment Buildings. Valves which l

have a testable surface of 20. square feet or less, hand rails, miscellaneous steel, and piping component supports are excluded from the scope of this testing by DCA 11400.

(!]\\j(('[], _{. (( O /

]

l 3.0 INSTRUCTI0rk l

3.1 PATCH (ADHESION) TEST CONTROL NO. fhr-us The inspector shall perform a patch (adhesion) test on all J.,

Shop Primed Equipment that is to be installed inside the Containment Buildings.

A calibrated 0-1000 psi Elcometer

.L Adhesion Tester, Model 106 or equivalent shall be used. The inspector shall perform the tests to the following criteria:

a.

200 psi minimum strength per test.

b.

A test will consist of three individual dollies tested to failure.

l c.

.For large essentially one-component equipment, one test per 500 linear feet is acceptable.

I 8511040423 851016 g

PDR FOIA GARDE 85-59 PDR 1

--- - (

TUGco cA

e.

INSTRUCTION ISSUE REVISION PAGE O

^

TEXAS UTILITIES GENERATING CO.

CPSES QI-QP-11.4-9 3

SEP 3 1982 2 of 3 d.

For equipment with several components:

1.

From 1 to 10 items: test 20% of items.

2.

Over 10 items: test 10% of items.

The inspector will assure after testing that all repair work is inspected in accordance with Reference 1-A.

3.2 DOCUMENTATION OF INSPECTIONS All inspections required by Section 3.1 shall be documenteu on an IR, Attachment 1, in accordance with Reference 1-B.

3.3 NONCONFORMANCES All nonconfomances shall be reported in accordance with Reference 1-C.

l es

.m8

. exagg e

L-.---

-~~~~ ---

Y 4/ '. '

INSTRUCTION ISSUE REVISION PAGE NUMBER DATE TEXAS UTILITIES GENERATING CO.

CPSES I

QI-QP-11.4-9 3

SEP 3 1982 3 of 3 ATTACHitENT 1 e

COMANCM( PEAK STEAM ELECTRIC STATION m.sw w

IA. ECTION lECMNIT

=

9 irsu ossramprios. gig 5PECTION OF Smr'uN

  • 3mEu / srwusn.n z a-w 4

s SHOP PRIMED EQUIPPEMT 2

an e su sause..ounr. mo.

-w no, y.

iner u occ. a nuv. a caamen me.

e AS-31 il

.l QI.QP-11.4-9. Pev.

E%D* OYMEE O %ey,on CTMrion a

amer mesutis C =.serma eseures, au. u ucams irem earwaeron, oe inweeron aar C m seno co= urin, umanneron inns usrin es.o.

LO fruns INSPECTtoN ATTRISUTES care I

l 1.

Patcft (Adhesion) Test l a.

Aeesion test performed to a minisus of 200 pst T

l f

before failure. Record Failurt Point pst i l l l

l

~~

b.

Adhesion test performed to a mininum of 200 pst l

befort failure. Recore Failure Point pst

(

J Adhesion test oerfe...4 to a minimum of 200 pst e.

before failure. Record Failurt Point 051 l

l l

Repair Work Complete abd Documented per QI.0P-11.41.

f 2.

l l

l l

i

)

I I II

  • ~

l tl l l l l

t i

l l

==ia=== u=es..ses, cre; e

!.S $I.08EO Q

l IIIIOIN'I qg TUGCO CA fem ma, i

.. _ -. _ -