Text
-_
f PROCEDURE l
ISSUE I
REVISION PAGE l
TEXAS UTILITIES GENERATING CO j NUMBER I
. APR 2 0 1991i i of 3 i
PREPAREDBY:"I Ar@ w & M-[
E j
INDOCTRINATION OF RECORD VERIFICATION PERSONNEL j
4 APPROVED BY:
e.v/
- do/f7 I
~
ME '
("
j
1.0 REFERENCES
j 1-A QI-QP-15.2-1, "Startup/ Turnover Record Verification" J
2.0 GENERAL 2.1 PURPOSE The purpose of this procedure is to provide personnel irvosved
.in Record Verification activities with functional and quality l
requirments applicable to the Record Verification Prog.am.
i 2.2 AUTHORITY The Records Management Supervisor has been delegated attrority for the administration of the requirenents set forth ir.his procedure.
l 3.0 PROCEDURE r
i 3.1 INDOCTR!faTION
)
All personnel involved in the Record Verification sha:1 complete i
the indoctrination process. The indoctrination requi es that j
each member involved in Record Verification read the focuments j
specified on Figure 1 and upon completion of each reading assignment, sign and date the space provided on Figure 1.
l When all reading assignments have been concluded, the member i
shall submit the completed Figure 1 Fonn to the Records Managenent Supervisor.
To complete the indoctrination process, the Records Management Supervisor will review and discuss with each Record Verifi-cation member the contents of each document specified on Figure 1.
When the $Jparviwe is assured that Records Verification personnel understand the contents of the documents in Figure 1 and is satisfied as to their ability to perform record verifi-i cation such as: drawing and specification review, checklist preparation, utilization of CRT and computer printouts and hard j
copy review, he shall sign and date the space provided.
1 i
TUGCC o4 -
j g i g p 851016 4
=
TEXAS UTILITIES GENERATING CO.
APR 2 0 1981 2 of 3 3.2 DOCUMENTATION The documentation of the indoctrination process is provided on the completed Figure 1 fom. The fom will be filed and maintained in the TUGC0 QA S/T Files.
4 TUCCO QA p, g 3
I PROCEDURE REVISION ISSUE PAGE NUMBER DATE TEXAS UTILITIES GENERATING CO.
Pl P. 2 0 1981 CPSES CP-QP-2.2 2
3 Of 3 FIGURE 1 C M FEAK STEAN ELECTRIC STATION STARTUF/ TURNOVER INDOCIRINATION OUTLINE i
E888s Signature Date
'1.
AF M IR S TO 10CF150 2.
10CFR50.S$ (e) 4.
S.
TUCCO STARTUF FROGRAM F1.AN 7.
TUCCO STARTUF ADMINISTRATIVE FROCDURES A.
CF-SAF-1 E.
CF-SAF-2 l
C.
CF-SAF-3 D.
CF-SAF-4 E.
CF-SAP-4 8.
RIC. GUE t 1-44 9.
FSAR "Q" LIST
- 10. CP-qP-2.2 i
- 11. CP-qr-15.2
- 12. QI-qt 13.2 1 l
- 13. orurR:
IISOCTRINATION FROCESS VERIFI G W CGIFLITE f
i TUGCO OA J
reem %
_ _ _..