Rev 2 to Procedure CP-QP-2.2, Indoctrination of Record Verification Personnel
ML20138P136
Person / Time
Site: Comanche Peak, 05000000
Issue date: 04/20/1981
From: Tolson R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20138M609 List: ... further results
References
FOIA-85-59 CP-QP-2.2, NUDOCS 8511060423
Download: ML20138P136 (3)


Text

-_

f PROCEDURE l

ISSUE I

REVISION PAGE l

TEXAS UTILITIES GENERATING CO j NUMBER I

DATE CPSES CP-0P-2.2 2

. APR 2 0 1991i i of 3 i

PREPAREDBY:"I Ar@ w & M-[

E j

INDOCTRINATION OF RECORD VERIFICATION PERSONNEL j

4 APPROVED BY:

e.v/

  1. do/f7 I

~

ME '

("

j

1.0 REFERENCES

j 1-A QI-QP-15.2-1, "Startup/ Turnover Record Verification" J

2.0 GENERAL 2.1 PURPOSE The purpose of this procedure is to provide personnel irvosved

.in Record Verification activities with functional and quality l

requirments applicable to the Record Verification Prog.am.

i 2.2 AUTHORITY The Records Management Supervisor has been delegated attrority for the administration of the requirenents set forth ir.his procedure.

l 3.0 PROCEDURE r

i 3.1 INDOCTR!faTION

)

All personnel involved in the Record Verification sha:1 complete i

the indoctrination process. The indoctrination requi es that j

each member involved in Record Verification read the focuments j

specified on Figure 1 and upon completion of each reading assignment, sign and date the space provided on Figure 1.

l When all reading assignments have been concluded, the member i

shall submit the completed Figure 1 Fonn to the Records Managenent Supervisor.

To complete the indoctrination process, the Records Management Supervisor will review and discuss with each Record Verifi-cation member the contents of each document specified on Figure 1.

When the $Jparviwe is assured that Records Verification personnel understand the contents of the documents in Figure 1 and is satisfied as to their ability to perform record verifi-i cation such as: drawing and specification review, checklist preparation, utilization of CRT and computer printouts and hard j

copy review, he shall sign and date the space provided.

1 i

TUGCC o4 -

j g i g p 851016 4

=

TEXAS UTILITIES GENERATING CO.

CPSES CP-QP-2. 2 2

APR 2 0 1981 2 of 3 3.2 DOCUMENTATION The documentation of the indoctrination process is provided on the completed Figure 1 fom. The fom will be filed and maintained in the TUGC0 QA S/T Files.

4 TUCCO QA p, g 3

I PROCEDURE REVISION ISSUE PAGE NUMBER DATE TEXAS UTILITIES GENERATING CO.

Pl P. 2 0 1981 CPSES CP-QP-2.2 2

3 Of 3 FIGURE 1 C M FEAK STEAN ELECTRIC STATION STARTUF/ TURNOVER INDOCIRINATION OUTLINE i

E888s Signature Date

'1.

AF M IR S TO 10CF150 2.

ANSI N45.2 3.

10CFR50.S$ (e) 4.

10CFR Part 21 I

S.

ANSI N43.2.10 6.

TUCCO STARTUF FROGRAM F1.AN 7.

TUCCO STARTUF ADMINISTRATIVE FROCDURES A.

CF-SAF-1 E.

CF-SAF-2 l

C.

CF-SAF-3 D.

CF-SAF-4 E.

CF-SAP-4 8.

RIC. GUE t 1-44 9.

FSAR "Q" LIST

10. CP-qP-2.2 i
11. CP-qr-15.2
12. QI-qt 13.2 1 l
13. orurR:

IISOCTRINATION FROCESS VERIFI G W CGIFLITE f

i TUGCO OA J

reem %

_ _ _..