__

PROCEDURE ISSUE I REVISION PAGE TEXAS UTILITIES GENERATING CO NUMBER ONI'E CPSES CP-C P- 5. 0 L .APR 2 0 1981 1 of 2 i i I PREPAREDBY:[

7 I M/d/8/ !

DATE I

QUALITY ASSURANCE REVIEW 0F SITE GENERATED /

PROCUREMENT DOCUMENTS APPROVED B):

v a -

w _

o[f/

DATE ' -

1.0 REFERENCES

1-A TUGC0/TUSI CP5ES QA Plan ,

1-B CQP-CS-2, " Procurement"

~~

{

CP-EP-5.0, " Procedure for Field Procurement.*p',% 1 1-C 1-D Brown & Root Quality Assurance Manual 1-E CP-CPM-5.1, " Field Procurement Activities" 1-F CP-QP-8.0, " Receiving Inspection" 1-G CP-QP-8.1, " Supplier Evaluation" 2.0 GENERAL 2.1 PURPOSE AND SCOPE The purpose of this procedure is to outline the methods ,

to be used by CPSES Site QA personnel to' assure that procure- l nent documents for safety-related items comply witn tne basic requirements set forth in Reference 1-A. This procedure applies to products or services procured by the CPSES Price Contractor, Brown & Rcot, Inc. (B&R), that are not under the jurisdiction of the ASME Code,Section III, Division 1.

Major ASME items or services are normally procured and described in Ref. 1-B. QA services for ASME items that have been l delegated to B&R will be accomplished in accordance with Ref.

1-C and its implementing procedures.

2.2 RESPONSIBILITY AND AUTHORITY The Site QA Supervisor is responsible for site generated procurement document review.

I l

,%2 TUGCO OA 8511060393 851016 PDR FOIA GARD 85-59 PDR , _ , _

,l PROCEDURE REVISION ISSUE NUMSER DATE PAGE t TEXAS UTILITIES GENERATING CO.

CPSES l CP-QP-5.0 1 APR 2 0 1981 2 of 2 4

i L

] The Quality Engineering Supervisor has been delegated authority j for implementation of this procedure.

l 3.0 PROCEDURE

! 3.1 SITE PURCHASING ACTIVITIES E 4

j TUS! has established Reference 1-C and supplementing instructions which outline the measures which have been established to i assure that procurement documents are controlled and comply 4 with CPSES QA requirements. B&R has established Reference 1-E i and supplementing instructions which outline tiie measures that have been established to assure that procurement documents are controlled and comply with CPSES QA requirements. References to the B&R Project QA Manager contained therein apply directly to ASME items whereas the responsibilities and authority for

,1 non-ASME items are as described herein. The basic flow paths -

j for both ASME and Non-ASME items are identical.

l l' 3.2 SITE QUALITY ASSURANCE ACTIVITIES Quality Instructions supplementing this procedure delineates the QA activities involved in review and approval of the various field procurement documents. Consistent with re-sponsibilities and authorities outlined herein, these instructions are applicable to Non-ASME items only.

I 3.3 CONTROL OF PURCHASED MATERIAL, EQUIPMENT AND SERVICES i

Measures have been established to assure that safey-related items or services comply with the procurement documents. These

. measures are outlined in Ref.1-F and 1-G.

Quality Instructions supplementing this procedure delineate Site QA activities involved in the interface between TUGC0 Site QA and TUGC0 Dallas QA concerning release of naterial and request for QA audit and source inspection of materials suppliers / manufacturers.