l

.e i

j PROCEDURE I6 I F

TEXAS UTILITIES GENERATING CO NUMBER REVISION PAGE DATE t..

CPSES I

CP-QP-8.1 1

1-28-80

~

1 of 2

^

PREPARED BY:

M/

6e SUPPLIER EVALUATION u

DATE

, g I'

A

__/ ho

" APPROVED BY:

_.. ATE r to

""""""c "$

CONTROLLED C0 ?Y.

1-A...

rUcCOnUSt cPSES QA Pi*"

CONTROL NO.M :'e 2 1-B CP-QP-5.0," Quality Assurance Review of Site Cenerated

~ Procurement Documents"

~ ~

~

~

1-C CP-QP-2.0, " Implementation of the CPSES QA Program" 1-D Brown & Root Quality Assurance Manual 1-C TUCCO corporate Quality Assurance Procedures 1-F Brown & Root Quality Surveillance Procedure Manual 2.0 CENERAL 2.1 PURPOSE AND SCOPE.

The purpose of this procedure is to outline the measures that have been established during the construction phase of the CPSES project to control purchased items and services for safety-related structures, systema and components. This procedure expands basic controls established in Section 7.0

-- ~ ~

~~6f*Refs~rence 1-A and provides a refdrence to suppliif ""

"~

evaluation methods utill ed by assigned QA personnel. The procedure is direct 1'y applicable to items or' services procured by the CPSES Prime Contractor, Brown & Root, Inc.

(B&R), Reference 1-8 outlines additional applicable measures relative to the other stages of the procurement cycle, including procurement document preparation (and review) and receiving inspection activities.

em, Tuoco oa 8511060413 851016 POR FOIA GARDE 85-59 PDR

f PROCEDURE NUMBER REVISION ISSUE TEXAS UTILITIES GENERATING CO.

CATE PAGE CPSES

[ **

CP-QP;8.1 r-T 28 2 of 2 4

2.2 RESPONSIBILITY AND AUTHORITY The Site QA Supervisor is responsible (see Ref. 1-A and

J' 1-C) 'foMasuring thit B.kR. procurement and supplier control-

~

' 3 efforts comply with basic CPSES QA Program requirements.

The

- Quality Engineering Supervisor assists in the implementation of controls established by this procedure, supplementary administrative directives or formal Quality Instructions.

3.0 PROCEDURE 3.1 ASME ITEMS Items a.L nervices procured by B&R that ate under the turisdiction of the ASME Code,Section III, DTirision 1 w,ill be-handled in

~

accordance with Reference 1-D.

Supplier evaluation and control methods are described within the manual and are detailed in implementing procedures.

3.2 NON ASME ITEMS Items and services procured by B&R not under the jurisdiction of the ASME Code,Section III, Division I will be handled by the applicable portions of Reference 1-E or 1-F a determined by supplier location, available manpower,,sand/or required technical expertise. The Quality Engineering Supervisor maintains a record on each supplier delineating the basic responsibilities for evaluation.

gg TUOCO CA

.