MONTHYEARNOC-AE-000661, Rev 4 to Severe Weather Plan, Including Summary of Changes.With1999-10-0404 October 1999 Rev 4 to Severe Weather Plan, Including Summary of Changes.With ML20217A2421999-09-30030 September 1999 Proposed Tech Specs Removing Parameters No Longer Applicable & Adding Tdf Value for Model 94 SGs in Place of Reactor Coolant Sys Flow ML20211Q2361999-09-0808 September 1999 Proposed Tech Specs 3/4.8.1,revised by Relocating 18-month Surveillance to Subject Sdg to Insps IAW Procedures Prepared in Conjunction with Mfg Recommendations to Section 3.8.1.1.4.8 of UFSAR ML20211Q8071999-09-0808 September 1999 Proposed Tech Specs & Associated Bases for Specification 3/4.8.1, AC Sources, to Eliminate Requirement for Accelerated Testing of Standby DGs & Associated NRC Reporting Requirements ML20211G2281999-08-24024 August 1999 Proposed Tech Specs Pages,Relocating Cycle Specific Operating Parameters from TSs to Colr,Including Moving Location of Insert 6 from Page 6-21 to Page 6-22 of Administrative Control Section & Renumbering Methods List ML20211C0371999-08-18018 August 1999 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated with Replacement SGs ML20210J0481999-07-28028 July 1999 STP Unit 1,Cycle 9 Startup Testing Summary Rept ML20209G9351999-07-15015 July 1999 Proposed Tech Specs 3.7.1.6 Re Atmospheric Steam Relief Valves ML20209H3371999-07-13013 July 1999 Rev 0 to 0PGP02-ZA-0004, Station Performance Data Collection,Categorization & Reporting ML20209H2131999-07-13013 July 1999 Rev 4,revised Pages 29 & 30 of 102 to Procedure 0ERP01-ZV-IN01, Emergency Classification ML20209G4461999-07-13013 July 1999 Proposed Tech Specs,Modifying 3.6.3 Action B,Clarifyin Use of Check Valve with Flow Through Valve Secured as Means to Isolated Affected Containment Penetrations ML20209C1511999-07-0101 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-80, Changing TSs 3.3.2 & 3.7.8 Allowing All Fuel Handling Bldg Exhaust Air Sys Components to Be Inoperable for Period of 8 Hours to Facilitate Repair of Train B Exhaust Booster Fan ML20209B5341999-06-24024 June 1999 Proposed Tech Specs Section 6.9.1.6.a,adding Min Measured RCS Flow,Which Lists Parameters Included in COLR ML20209H3151999-06-23023 June 1999 Rev 4 to 0PGP02-ZA-0003, Comprehensive Risk Management ML20195E4211999-06-0707 June 1999 Proposed Tech Specs,Relocating cycle-specific RCS-related TS Parameter Limits to COLR ML20195E4701999-06-0707 June 1999 Proposed Tech Specs Pages Re Proposed Amend to Licenses NPF-76 & NPF-80,deleting Total Allowance,Sensor Error & Z Terms from ESFAS & RTS Instrumentation Trip Setpoint Tables of TS 2.2.1 & 3.3.2 ML20209H3081999-06-0101 June 1999 Rev 3 to 0PGP04-ZA-0604, Probabilistic Risk Assessment Program ML20205S3511999-04-19019 April 1999 Proposed Tech Specs Bases Page 3/4 8-3 Removing Reference to Fast Transfer Capability That Is Inconsistent with STP Design Bases as Described in UFSAR Chapters 8.2 & 8.3 ML20205G8081999-03-30030 March 1999 Proposed Tech Specs,Relocating Section 3/4.3.3.4, Meteorological Instrumentation & Associated Bases Description to STP Trm,Per NUREG-1431 ML20204J9681999-03-22022 March 1999 Proposed Tech Specs Incorporating New TS for Atmospheric Steam Relief Valve Instrumentation & Revising TS 3.7.1.6 Re Atmospheric Steam Relief Valves ML20204D1581999-03-15015 March 1999 Proposed Tech Specs 3/4.7.9 for Snubbers to TRM ML20207D9651999-03-0202 March 1999 Proposed Tech Specs Change Clarifies Use of Check Valve with Flow Through Valve Secured as Means to Isolate Containment Penetration in TS 3.6.3 Action B ML20207C4721999-02-24024 February 1999 Proposed Tech Specs Bases 3/4.2.5,clarifying That Averaging of Only Three Channels Is Min Expected When Verifying DNB Parameter Compliance ML20202G6871999-01-26026 January 1999 Proposed Tech Spec Page 3/4 4-39,revising TS 4.4.10 for Alternate ISI of RCP Flywheels ML20199K5681999-01-20020 January 1999 Proposed Tech Specs Surveillance Requirement 4.7.1.2.1.a Re AFW Pump Performance Testing ML20198A2181998-12-10010 December 1998 Revised TS Pages,Adding Ref to TS Figure 2.1-2 to Bases Section 2.1.1 as Figure Provides DNBR Curves Appropriate to Alternate DNB Operating Criteria ML20198A1951998-12-0909 December 1998 Corrected TS Bases Pages B 3/4 8-15,-16 & -17,as Discussed During 981103 Telcon ML20196B8121998-11-23023 November 1998 Proposed Tech Specs Pages for Proposed Amends to Licenses NPF-76 & NPF-80,relocating Descriptive Design Info from TS 3/4.7.1.1 (Table 3.7-2) Re Orifice Sizes for Main Steam Line Code Safety Valves,To Bases Section ML20155J9031998-11-0303 November 1998 Proposed Corrected Tech Specs Bases 3/4 9-3 Re Water level- Refueling Cavity & Storage Pools ML20155D5441998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amend to Relocate Turbine Overspeed Protection TS 3/4.3.4 to TRM ML20155D5561998-10-29029 October 1998 Proposed Tech Specs Pages for Proposed Amends to Relocate Snubber TS 3/4.7.9 to TRM ML20155D5801998-10-29029 October 1998 Proposed Tech Specs Pages for Amends to Relocate Portion of TS Surveillance Requirement for DG Fuel Oil Storage Tank to TRM ML20154M1621998-10-12012 October 1998 Revised Tech Specs Bases Pages B3/4 8-14 Through -17 ML20154C5071998-09-30030 September 1998 Proposed Tech Specs Bases Page B 3/4 9-2,removing Wording Re 10% Value for Clad Gap Iodine Isotopics ML20154C0051998-09-30030 September 1998 Proposed Tech Specs Reflecting Replacement SG Tube Insp Surveillance Differences & Deleting Provision Allowing Use of F* Alternate Repair Criteria ML20154A4281998-09-28028 September 1998 Proposed Tech Specs Re Requirements Associated with Control Room & Fuel Handling Bldg Ventilation Sys ML20151T1621998-08-31031 August 1998 Proposed Tech Specs 3.4.9.3 Re Cold Overpressure Mitigation Curve Associated W/Replacement SGs ML20238F0841998-08-28028 August 1998 Proposed Tech Specs Section 4.0.5,excluding Specified Containment Isolation Valves from ISI & Testing Requirements as Stated in Section XI of ASME Boiler & Pressure Vessel Code ML20236T5141998-07-22022 July 1998 Proposed Tech Specs Re Replacement SG Water Level Setpoint Differences ML20236R1461998-07-15015 July 1998 Proposed Changes to Current Tech Specs Bases ML20236L6311998-07-0707 July 1998 Proposed Tech Specs,Reflecting Rev of Criticality Analyses & Rack Utilization Schemes for Regions 1 & 2 of Spent Fuel Racks as Described in STP UFSAR & TSs ML20236M6381998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.3.3.3 Requirements for Seismic Instrumentation to Technical Requirements Manual ML20236K3481998-07-0606 July 1998 Proposed Tech Specs,Relocating 3/4.7.13 Requirements for Area Temp Monitoring Sys to Technical Requirements Manual ML20236N0001998-07-0606 July 1998 Proposed Tech Specs,Relocating RCS Design Features from TS Section 5.4 to UFSAR ML20247F3321998-05-0707 May 1998 Proposed Tech Specs Pages,Reflecting Replacement SG Reactor Coolant Flow Differences ML20217P1441998-04-0202 April 1998 Proposed Tech Specs 3.4.5 Re voltage-based Repair Criteria ML20202H9771998-02-16016 February 1998 Proposed Tech Specs Pages,Implementing 1-volt voltage-based Repair Criteria for SG Tube Support plate-to-tube Intersections ML20198C3741997-12-31031 December 1997 Proposed Tech Specs 2.1,2.2 & 3/4.2.5 for Alternate Operation W/Reduced Measured RCS Flow ML20197A7211997-12-17017 December 1997 Proposed Tech Specs Pages,Revising TS 4.6.2.1 to Extend Surveillance Interval of Containment Spray Sys Nozzle Air Flow Test from Five Years to Ten Years ML20199H2081997-11-20020 November 1997 Revised TS Bases Page B 3/4 4-15 1999-09-08
[Table view] Category:TEST REPORT
MONTHYEARML20210J0481999-07-28028 July 1999 STP Unit 1,Cycle 9 Startup Testing Summary Rept ML20072G8031994-08-17017 August 1994 STP Unit 2 Cycle 4 Startup Testing Summary Rept ML20092G4491991-11-19019 November 1991 Reactor Containment Bldg Integrated Leakage Rate Test Rept ML20081G1271991-03-0404 March 1991 Reactor Containment Bldg Integrated Leakage Rate Test Rept ST-HL-AE-3229, Startup Rept1989-09-18018 September 1989 Startup Rept ML20196C0991988-11-15015 November 1988 Rev 1 to IE Bulletin 88-005 Investigation Rept,South Texas Project Electric Generating Station - Unit 2 ML20151Q1411988-08-0202 August 1988 Summary of Unit 1 Voltage Verification Test Results (PSB-1) South Texas Project Electric Generating Station ML20246H9871988-04-30030 April 1988 Environ Qualification of Continental Wire & Cable Corp Instrumentation Cable Installed in Beaver Valley Power Station Unit 1 ML20153G3481987-11-25025 November 1987 Rev 1 to Irradiation Study of Boraflex Neutron Absorber Interim Test Data, Interim Technical Rept ML20209D4231987-04-21021 April 1987 Actuation Train Relay Response Time Test Summary & Results ML20215L0791987-04-17017 April 1987 Rev 1 to Purge Containment Isolation Valve, Operability Analysis & Test Rept ML20215L0991987-04-13013 April 1987 Qualification Test Rept on Valve & Actuator for Valtek,Inc, Springsville,Ut ST-HL-AE-2198, Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept1987-03-31031 March 1987 Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept ML20206K6431987-03-20020 March 1987 Rept of Test Conducted to Determine Effects of Spraying Water on Anaconda Flex Conduit Wrapped in Siltemp WT-65. No Visible Damage or Siltemp Slippage Observed ML20212M4771987-02-19019 February 1987 Energy,Inc Test Rept on Eight-Channel Digital Isolator ML20215E4621986-11-30030 November 1986 Voltage Study for Split Group Bus Configuration ML20215A4511986-11-30030 November 1986 Nonproprietary Noise,Fault,Surge & Radio Frequency Interference Test Rept ML20212M4921986-09-16016 September 1986 Electrical Test Rept on Isolation Relays & Transmitter & Receiver for Bechtel. Related Documentation Encl ML20195C7791986-02-20020 February 1986 Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump) ML20195C7601986-02-20020 February 1986 Rev 1 to Seismic Instruments Channel Check ML20210T5271986-02-19019 February 1986 Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R140 (HPCS Pump Base Mat) ML20195C8941986-02-18018 February 1986 Rev 2 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R170 (Reactor Recirculation Piping Support) ML20195C8521986-02-18018 February 1986 Rev 2 to Triaxial Peak Accelerograph Channel Calibr for D51-R130 (HPCS Piping in Reactor Bldg) ML20195C7681986-02-18018 February 1986 Rev 1 to Triaxial Peak Accelerograph Channel Calibr for D51-R120 (Reactor Recirculation Pump) ML20195C8731986-02-17017 February 1986 Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R190 (RCIC Pump Base Mat). Related Documentation Encl ML20195C8671986-02-17017 February 1986 Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R180 (HPCS Pump Base Mat) ML20195C8601986-02-14014 February 1986 Rev 1 to Triaxial Response Spectrum Recorder Channel Calibr for D51-R160 (Reactor Bldg Foundation) ML20195C7391986-02-0707 February 1986 Rev 1 to Triaxial Time-History Accelerograph Channel Calibr ML20195C7521986-02-0707 February 1986 Rev 1 to Triaxial Seismic Switch Channel Calibr for D51-N150 ML20206M3581986-01-0303 January 1986 Rev 2 to Door Sealing Matls Qualification File for Watertight Doors Mfg by Mosler Safe Co for South Texas Project Electric Generating Station ML20213G1521985-09-26026 September 1985 Sanitized Version of Test Program on Isolation Relays & Analog Signal Isolators for Use in Hope Creek Generating Station. W/Three Oversize Drawings ML20133N0211985-08-27027 August 1985 Electrical Cable Separation Verification Testing ML20099E6561985-02-18018 February 1985 Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2 ML20112J7191985-02-0404 February 1985 Rev a to Qualification Rept for Model KDI-1000 High-Range Containment Area Radiation Detector & Mineral-Insulated Cable Sys ML20104A9601985-01-18018 January 1985 Reactor Vessel Cavity Seal Test Results ML20198E7441985-01-10010 January 1985 Test Rept for Full Flow Testing of 16,18 & 20-Inch Main Steam Safety Valve Vent Stacks for Yankee Atomic Electric Co ML20137Z8271984-11-30030 November 1984 Nuclear Component Qualification Test Rept Square D 9025-BCW-45 Thermal Switch ML20064N8551984-10-12012 October 1984 Damper Test Rept for South Texas Project Units 1 & 2 ML20206M5281984-10-0101 October 1984 Damper Test Rept for South Texas Project Units 1 & 2 ML20098F5441984-09-30030 September 1984 Rev 0 to Evaluation of Tests Performed on Energy Absorbing Matl for Pipe Whip Restraints ML20100N1091984-08-31031 August 1984 Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 8, Final Rept ML20094C1511984-07-12012 July 1984 Extension of Retainer Lifetime to 4 Cycles ML20094G7451984-04-30030 April 1984 Rev 1 to Evaluation of Energy Absorbing Matl for Pipe Whip Restraints ML20138P4551984-04-19019 April 1984 Elcometer Adhesion Tests Nutec Concrete Coating Repair Sys 11S/1201/11S/1201 11S/1201/11/1201. Related Documentation Encl ML20100N1151984-03-31031 March 1984 Reactor Vessel Irradiation Surveillance Program Analysis of Capsule 18, Final Rept ML20090J5601984-03-23023 March 1984 Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) ML20080B2691984-02-29029 February 1984 Diesel Generator Rocker Arm Lube Oil Temp Test Rept - SER Confirmatory Item 26 for Callaway & Item B.26 for Wolf Creek ML20080U4931984-01-31031 January 1984 Evaluation of Natural Circulation Cooldown Test Performed at San Onofre Nuclear Generating Station ML20086P0641983-12-0101 December 1983 Section 5.0, Startup Addenda, to Monthly Project Status Rept ML20080C5391983-10-15015 October 1983 Preliminary Rev 0 to Pre-Core Emergency & Auxiliary Feedwater Sys Test, Test Results Rept for 830503-0703 1999-07-28
[Table view] |
Text
. . __ _-- - _ _ _ _ .
.- ;; . 3
, , .e ., ;c . - 7 ,y a - - , -~ . . - - ~ - .- - - - ;; m - .. r .__. -- ,.
t l
3 l
I TECHNICAL REPORT I
NUMBER 215-78-G TITLE COMPATIBILITY TESTING - CONCRESIVE 1411 EPOXY MORTAR FOR CUSTOMER BROWN Ts ROOT Submitted by: Gerald E. Arnold Approved: y Date: 1/25/78 SOUTHERN LMPERIAL COATINGS CORPORATION,INC.
P. O. Box 29077, + New Orleans, Louisiana 70189 Phone: (504) 254-1433 i
L
. a n. ,. he, e . .nf . t. .,
,,,,..,,,-,..e.neH. . . . . - . - . - . . . . . . .
8511060097 851016
. _ . - - - ~ PDR FOIA ~~ ~~
GARDEBS-59 PDR
- ~a . .w ~ : n : ,-
- . 297.
w . . . . . . -
, . ~ . . - - . - . , -
~ i
(
.. T.R.#215-78-G
- 1 Page 1.
i 1 stnogutY - Compatibility testing was initiated at the request of Brown I and Root engineers relative to the South Texas Project. E1cometer adhesion and DBA tests were conducted to demonstrate the compatibility of Concresive 1411 to Imperial's NUTEC 11S/REACTIC 1201 system. The results of these tests indicate that the Concresive 1411 is compatible with the Ispecial products.
L Ilfrn0 DUCTION - Concresive 1411 is a 100% epoxy masonry and concrete mortar which is designated for use in repairing concrete damage at the South Texas Project. Brown and Root engineers requested that Imperial conduct tests to dem nstrate that the proposed NUTEC llS/REACTIC 1201 g coating system and Concresive 1411 are compatible.
METHODS -
a) Specimens - 2" x 3 " x 2" concrete specimens prepared in
, accordance with Bechtel CP956 l
Coupon No. Batch Pour Date Curing Compound 478, 479 1-53 .5-6-76 NOTEC #10 (5606/5607)
- s 486 509, 512, 1-53 5-6-76 NONE
& 513 b) Surface preparation - 100 psi compressed air c) Application and Curing Data I
! Product Batch # Date and Time F/% R.H. DET Cure Data Applied Concresive Lot 77654 1-5-78 70 F/64% Fill 4 days 9 70-80*
1411 9:30 a.m. Voids
NUTEC #11S 3227/3228/ 1-9-78 58 F/46% .020" .025" 3 days 9 70-80' 3229 1:30 p.m. 45-65% R.H.
4 days 9 70-80' REACTIC #1201 2467/2568 1-12-78 58 F/66% .005" .006" 10:00 a.m.45-654 R.H.
- *Concresive 1411 was applied to the entire surface - not just voids.
I I An approximate DFT of 5-10 mils was obtained.
d) Testing v
- 1. Elcometer adhesion testing was performed in accordance with Imperial Test Method 03.
-v .-.--.,,-_-.,,7 .- ,,_,,,,,,_ . , , , _ , , _, _ _ _ _ , _ _ _ _ _ __ _ ___ _ _ _ _ _ _ _
- . . - > a; . ,
__.w y .v y. . - . - . . c.. r .- . , , . . . . . . . ... ; ,
3 ..
T.R. 8215-78-G Page 2. ,
1 High strength aluminum dollies were applied to the mated spec 4==n= by means of an epoxy resin-type adhesive.
The dollies were placed 1-13-78 at 11:00 a.m. and removed i
with an E1cometer adhesion testar 1-16-78 at 9:00 a.m.
- 2. two of the six concreta specimens were then submitted to Coastal Science Associates for DBA testing in accordance with the test parameters established for the South Texas Project. The concrete coupons were subjected to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> i of LOCA simulated conditions with a ==w4== temperature of j 307 F. and a =mwi=ina pressure of approximately 57 psig.
The coating damage inflicted by the Elcometer testing was J
not repaired prior to IBA testing.
i RESULTS -
a) Elcometer Adhesion i
i l Lab. Panel # Concrete Coupon 9 Form required Mode of I to remove dolly Failure 3706 478 350 psi 100% concrete failure l 3707 479 500 psi 80s 1411/concr.
f 20tconcrete 3708 486 475 psi 100% concrete failure 3709 509 450 psi 100% concrete failure
.3710 512 500 psi 100% concrete failure 3711 513 400 psi 1004 concrete failure b) DBA Lab. Panel # Concrete Coupon # Results i 3710 479
- Coating intact. Some delamination on broomed
' and smooth surfaces.
3707 512 No Defacts.
- Delamination was determined by " sounding" the test specimen. This ....
N*' WW- _ eB N&4e nese he.
, , - - - - - , - . , m--,,. , . , , - . ~ . - . - ,, , - . , , - . - - ,--
. v.
--:.s +-.m w om Y: y:m .: :.yfN" Tr4 wMM' ~":'"qq.7%-Tf:' -:- ^*' l_ _
i j -
4 T.R.9215-78-G i
Or% Page 3.
observation was confirmed by removing the coating in the
" defective" areas. The failure was found to occur betwoen the Concresive 1411 and the concrete surface.
CONCLUSIOBIS - The results of the Eloometer adhesion and DBA testing demonstrates the campatibility of Concresive 1411 with the Imperial coating system. In all tests, the bond between the Concresive 1411 and the NOTEC #11S was excellent.
Some failures, however, did occur between the concrete surface and the Concresive 1411. Speciman # 3707 exhibited scoe loss of adhesion at the
, substrate in the adhesion test and specimen #3710 exhibited signs of
} delanination in the ImA test. This potentimi problem can be avoided by good surface preparation practices. The concrete speci==n= used had aged for 20 months. Apparently some con *==ination was present which was not readily removed by 100 psi compressed air. Use of Concresive 1411 should be restricted to damaged concrete, voids, and tie holes where a " physical
, bond" will be achieved and improve the performance of the overall system.
Excess Concresive 1411 should be removed to avoid any potential adhesion problems.
REFERENCE - Lab. Notebook #56, p.39 Q+
3 l
]
1
/- i i !
l 4
-~ n,,--- - - - , - -
r.- ,.,,..n, - - . . . - - - ~ . - - , . . . ---.r,,, ,,,,nm,-,_,--,,,,n , - - ~ ~ - - . - - - - . . - - . - -
1
-( .
.m. . .~ m y ae m .y._. v- g.. ,s.. , ..,...,,_,7 j . . .
ti '
~@
COASTAL SCIENCE ASSOCIATES, INC. -
6999 CANAL BLVD.
NEW ORLEANS, LOUISIANA 78124 TEL. 584-283-7251 a
SUBJECT:
DESIGN BASIS ACCIDENT COATINGS TEST REPORT.
DATE: 1/18/78 DBA TEST CONDITIONS: HOUSTON LIGHT AND POWER, 24 HR. SCREEN TEST HIGHEST TEMPERATURE CDEG. F) REACHED DURING RUN 307 SAMPLE NUMBER: 3787 SAMPLE TYPE: CONCRETE COUPON SAMPLE # DESCRIPTION o ............................................................
3787 SIDE la NO DEFECTS SIDE 2: NO DEFECTS SIDE 3: NO DEFECTS -
en .
- SIDE 4: NO DETECTS REPORT VRITTEN FOR: SOUTHERN IMPERIAL COATINGS REPORT # 059811778 _
APPROVED BY.... ....... ..... .... ....
I ;
I i
- . - - - , v _ _ _ _ . - . - . . _ _ . _,_ _ .. __,- _ , . . _ _ , _ _ . _ _ , _ - . . - _. _
,m# .-. , .-_
- ~
_ . x . . 7 . ..g . ~ . i n.p. .
- g. .
m -:g y z,. . . . . .--. . . .. .,
..e 4 4
O .
COASTAL SCIENCE ASSOCIATES, INC.
6989 CANAL BLVD.
NEW ORLEANS, LOUISIANA 79124 TEL. 594-283-7251
SUBJECT:
DESIGN BASIS ACCIDENT COATINGS TEST REPORT.
DATE: 1/18/78 DBA TEST CONDITIONS: HOUSTON LIGHT AND POWER, 24 HR. SCREEN TEST HIGHEST TEMPERATURE (DEG. F) REACHED DURING RUN 387 SAMPLE NUMBER: 3719 SAMPLE TYPE: CONCRETE COUPON SAMPLE # DESCRIPTION 3718 SIDE'1: ( SIDE WITH SAMPLE #3 NO DEFECTS SIDE 2: DELAMINATION OVER MOST OF SIDE. NO CRACKS OR BLISTERS.
SIDE 3: NO DEFECTS SIDE 4: DELAMINATION BELOV ADHESION TEST CUT. NO OTHER DEFECTS i
i REPORT VRITTEN FOR: SOUTHERN IMPERIAL REPORT # 85991 778 i-
- APPROVED BY... ......... ...... .... 5 I
s l
_ MW O' '-_S'h-+
O O*O S __
7g
- e . . : e . s. . a a,' g yjs...y..y _. *
- 2. . .= , .
4
~ ' ' '*
d
.r#
Box 2907' New Orleans. l.ou s,ana 70189 U S A 504-2541433 i ; 'T; ~ w qi . PROFESSIONAL COATINGS
'~ ,;'
February 24, 1978 1
1 j Commanche Peak Steam Electric Station j Brown & Root, Inc.
P.O. Box 1001 GLEN ROSE, TX 76043
{ v l ATTENTICN: Mr. Don Sutton
- Dear Mr. Sutton l Enclosed is a copy of Imperial's Technical Report #215-78-G demonstrating the compatibility of Concresive 1411 Epoxy Mortar, with Imperial s NtTTEC WilS/
REACTIC #1201 System. ,
! s Sincerely, 1
. 41/42 .
t GIraldE. Arnold
! Technical Support Representative i Nuclear i
t GEA/nd Enclosure i