Advises That Info Submitted Re NSP Rept NSPNAD-96001,rev 2, Dtd Jan 1997, Monticello Cycle 18 Final Reload Design Rept (Reload Safety Evaluation), Will Be Withheld from Public Disclosure
ML20140B757
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/03/1997
From: Kim T
NRC (Affiliation Not Assigned)
To: Richard Anderson
NORTHERN STATES POWER CO.
References
NUDOCS 9706060312
Download: ML20140B757 (3)


Text

. - - . . - - -. . . . - - . .- -. _ -

one M ET e

[ UNITED STATES

< o ll NUCLEAR REGULATORY COMMISSION

, 5 I wAswinorow, o.c. sones.cooi hh

'% June 3, 1997 Mr. Roger 0. Anderson Director Licensing and Management Issues Northern States Power Company 414 Nicollet Mall Minneapolis. MN 55401

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (MONTICELLO NUCLEAR GENERATING PLANT)

Dear Mr. Anderson:

By your application dated May 2.1997, and affidavit dated May 5.1997. you submitted revised information with respect to the four General Electric GE12 lead use assemblies that are included in the Monticello Cycle 18 (Reload 17) core and requested that Northern States Power Company (NSP) report NSPNAD-96001. Rev. 2. dated January 1997 titled "Monticello Cycle 18 Final Reload Design Report (Reload Safety Evaluation." be withheld from public disclosure pursuant to 10 CFR 2.790.

Your application did not include a nonproprietary version of this document.

and we request that a nonproprietary version De submitted to NRC within 90 l days from the date of this letter, for release to the NRC Public Document i Room.

l t

i You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

1. Tne information disclosesk:a process, method. or apparatus, including supporting data and analyses, where prevention of its use by NSP's competitors without license from NSP constitutes a competitive economic advantage over other companies.

! 2. The information if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design.

! manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

l I We have reviewed your application and the material in accordance with the

, requirements of 10 CFR 2.790 and on the basis of your statements, have

. determined that the submitted information sought to be withheld contains 0

proprietary commercial information.

Therefore. NSP report NSPNAD-96001. Rev. 2. dated January 1997 titled 0

"Monticello Cycle 18 Final Reload Design Report (Reload Safety Evaluation." I -

marked as pro)rietary, will be withheld from public disclosure pursuant to 4

10 CFR 2.790(3)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

! Withholding from public inspection shall not affect the right, if any. of 4

persons properly and directly concerned to inspect the documents. If the need

~

NP.C FILE MH&i COPY 9706060312 970603 PDR ADOCK 05000263 P PDR

R. O. Anderson arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely.

ORIGINAL SIGNED BY Tae Kim Senior Project Manager Project Directorate III-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-263 cc: See next page l DlSTRIBUTION:

! Docke File PUBLIC PD3-1 Rdg i J. Roe l M.P.Si e:nien +(MPS)

J.Jacobson, DRP/RIII DOCUMENT NAME: G:\WPDOCS\MONTICEL\M0970502. PRO To receive a copy of this document, indicate in the box: 'C' = Copy without attachment / enclosure *E' = Copy with attachment / enclosure "N" =

No copy ,O t 0FFICE LA:PD31 l F, PM:PD31 4 lE k$0dRXB l OGC lC D:PD31(/l [

NAME CJamerson eX TJKim TA s illyonsh/em MPSiemien M N Ji}annorf DATE 05/ 21 /97 (f 05/ 27 /97 C05/cS/97 O(daL/97 0$Jf/W 0FFICIAL RECORD COPY

Mr.-Roger 0. Anderson. Director Manticello Nuclear Generating Plant l

Northern States Power Company CC:

J. E. Silberg. Esquire Kris Sanda. Commissioner Shaw. Pittman Potts and Trowbridge Department of Public Service 2300 N Street. N. W. 121 Seventh Place East-Washington DC 20037 Suite 200 St. Paul, Minnesota 55101-2145 U.S. Nuclear Regulatory Commission Resident Inspector's Office Adonis A. Neblett 2807 W. County Road 75 Assistant Attorney General Monticello. Minnesota 55362 Office of the Attorney General 445 Minnesota Street Plant Manager .

Suite 900 Monticello Nuclear Generating Plant St. Paul, Minnesota 55101-2127 ATTN: Site Licensing l Northern States Power Company  ;

2807 West County Road 75 '

Monticello. Minnesota 55362-9637 Robert Nelson. President l Minnesota Environmental Control Citizens Association (MECCA) i 1051 South McKnight Road St. Paul, Minnesota 55119 c Commissioner-

' Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, Minnesota 55119 .

. 1 RegionalAdministrator. Region $11

, U.S. Nuclear Regulatory Commission .

l 801 Warrenville Road

. Lisle Illinois 60532-4351 l Commissioner of Health Minnesota Department of Health 717 Delaware Street. S. E.

Minneapolis, Minnesota 55440 Darla Groshens. Auditor / Treasurer Wright County Government Center 10 NW Second Street  ;

Buffalo. Minnesota 55313 4 January 1995 I