Category:CORRESPONDENCE-LETTERS
MONTHYEARML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20248D6521989-07-20020 July 1989 Forwards Response to Util Re Bills D0184 & D0185 for Plant OL Application Review Costs by Various Program Ofcs Through June 1984 ML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20237B4361987-12-14014 December 1987 Final Response to FOIA Request for Documents.App B Document, Board Notification 84-024,encl & Also Available in PDR ML20236X6141987-12-0808 December 1987 Final Response to FOIA Request All Documents.No Addl Records Subj to Request Located ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235K1731987-07-0909 July 1987 Partial Response to FOIA Request for Info Re Certain Contracts Awarded by NRC for Reporting Svcs.Forwards App a & B Documents.Documents Also Available in PDR ML20234F0911987-06-26026 June 1987 Responds to Appeal Re Denial of FOIA Request for Documents. Forwards Document 5 in App F.Portions of Document 5 Withheld (Ref FOIA Exemptions 6 & 7).Other Requested Documents Withheld (Ref FOIA Exemption 6) ML20215K1981987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Allegations Concerning Plant.Forwards App G & H Documents.Documents Also Available in Pdr.App H Documents Partially Withheld (Ref FOIA Exemption 6) ML20213F9351987-05-0808 May 1987 Partial Response to FOIA Request.Forwards App F Document & Weld Allegations.App G Documents Partially Withheld (Ref FOIA Exemption 6) ML20206H4951987-04-13013 April 1987 Partial Response to FOIA Request for Documents Re Bechtel Employment Discrimination.Forwards App E Documents.App D Documents Withheld (Ref FOIA Exemption 6) ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20211A9531987-02-13013 February 1987 Advises That Financial Info Submitted for 1987 in Util Satisfies Requirements of 10CFR140.21 That Each Licensee Maintain Guarantee of Payment of Deferred Premiums for Operating Reactors Over 100 Mwe ML20212M7651987-01-16016 January 1987 Informs That Due to Demands on Staff,Nrc Will Respond by 870430 to 850607 Request for Review of Invoices D0184 & D0185 Re OL Application Review Costs Through 840623 ML20207C0151986-12-19019 December 1986 Forwards Notice of Withdrawal of Application for OLs & Termination of Proceeding,Per Util 860711 Request & ASLB 861217 Memorandum & Order Granting Motion ML20207C1191986-12-18018 December 1986 Forwards Order Terminating CPPR-81 & CPPR-82 Based on Fact That Const of Facility Ceased,Units Inoperable & Site Environmentally Stable,Per Util 860701 Request to Withdraw Application to Amend CPs ML20215B9641986-12-0505 December 1986 Notifies Util of 870204-05 Early Emergency Responders Workshop in Chicago,Il to Discuss Lessons Learned & Current Problems in Coordination & Integration of Emergency Response Efforts.Meeting Agenda & Preregistration Form Encl ML20214Q0911986-11-24024 November 1986 Partial Response to FOIA Request for Documents Re Ofc of Inspector & Auditor Investigations.Forwards App B Documents. Documents Also Available in PDR ML20214A0761986-11-14014 November 1986 Forwards Insp & Evaluation of Plant for Adequacy of Stabilization Plan,Documenting 861015-16 Site Insp & Review & Insp of Site Stabilization Rept.Environ Stabilization Satisfactory ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20215M8851986-10-28028 October 1986 Forwards Insp Repts 50-329/86-01 & 50-330/86-01 on 861015-16.No Violations Identified ML20211B5401986-10-0909 October 1986 Further Response to FOIA Request for Eight Categories of Documents Re Ee Kent Allegations Concerning Facilities. Forwards Documents Listed in App K ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20209E6621986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR IA-86-235, Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR1986-09-0505 September 1986 Responds to FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order.Documents Listed on App Available in PDR ML20212K9061986-08-21021 August 1986 Forwards Request for Addl Info Re Environ Review of Util 860711 Request to Withdraw Applications for OL by 860828 ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20203B2351986-07-10010 July 1986 Informs That Review of 820622 Application to Receive Unirradiated Nuclear Fuel Assemblies Terminated,Per .Fission Chambers Should Be Disposed of & Licenses SNM-1904 & SNM-1905 Terminated,Per 10CFR70.38(b) ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203Q2891986-05-0606 May 1986 Forwards BNL Technical Rept, Surveillance & Maint..., Based on NRC 851014-18 Insp.No Violations Noted.Items Identified Could Have Impact on Later Project Restart. Evaluation of Rept Recommendations Requested within 60 Days ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued 1997-03-31
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20236U2571987-11-0505 November 1987 FOIA Request for Documents Re Ball Type Main Steam Isolation Valves Used at Facilities ML20216E4721987-05-28028 May 1987 Part 21 Rept 140 Re Potential Defect in Air Pressure Regulators Mfg by Bellofram.Dripwell Gasket May Fail Due to Mismachining of Gasket Seating Surface Causing Loss of Control Air & Starting Air Pressure ML20235G2321987-04-0101 April 1987 FOIA Request for Documents Re Forged NDE Inspectors Certification Supplied by Barclay Intl for Use at Quad Cities Nuclear Station & Stated Investigations at Plants ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20210S9971986-10-0202 October 1986 Requests Change in Facility Svc List Address to Ref Address. Related Correspondence ML20214T7431986-09-24024 September 1986 Forwards Form 8-K Filed W/Securities & Exchange Commission. Util Believes Info Presented Bears No Issues Currently Before Aslb.Related Correspondence ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20206M8311986-08-15015 August 1986 Forwards Util Response to ASLB 860716 Order.W/O Encl.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20207D7261986-07-11011 July 1986 Forwards Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Aslab Jurisdiction.W/O Encl.Related Correspondence ML20202F9581986-07-11011 July 1986 Forwards Util Motion for Authorization to Withdraw OL Application & for Dismissal of OL & Order of Mod Proceedings & Motion for Termination of Appeal Board Jurisdiction,For Filing.W/O Encl ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20209E6531986-03-28028 March 1986 FOIA Request for Documents Re Util Response to NRC 840112 Confirmatory Order ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20136F4771985-12-31031 December 1985 Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20133F7581985-10-0808 October 1985 Informs of Plans to Physically Disable Equipment Installed in & About Evaporator Bldg to Serve Process Steam to Dow Chemical Co,Per 850925 Resolution.Equipment & Structures Abandoned Are non-Q.Related Correspondence ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133A3141985-09-27027 September 1985 Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20133H8841985-09-16016 September 1985 Discusses Ee Kent Allegations Re Plant,Per Encl . Decision Reflected in NRC Should Be Reconsidered. B Garde & T Devine of Gap Unwilling to Testify for Kent.Kent & Counsel Unable to Produce Expert Witnesses ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl ML20133L8331985-08-0909 August 1985 Forwards Attachment 1 to Revised Exhibit D of Revised Compliance Filing & Application for Authorization to Issue Securities.Plan Is Requirement of Agreements W/Banks to Restructure Outstanding Debt.Related Correspondence ML20132B1841985-07-19019 July 1985 Forwards Monthly Repts for May & June 1985 Per Condition of 730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Related Correspondence 1989-04-28
[Table view] Category:UTILITY TO NRC
MONTHYEARML20245D9621989-04-28028 April 1989 Forwards Addl Info Re Bunker Ramo Instrumentation Penetration Modules,Per 890131 Request.Util Believes That Modules Environmentally Qualified in Accordance w/10CFR50.49 & NUREG-0588,Category II ML20155A7001988-06-0202 June 1988 Informs That Const on Conversion of Plant to gas-fired Facility Began on 880404 ML20155A7401988-05-18018 May 1988 FOIA Request for Documents on 850731 & 870312 Meetings Re Plant.Document Re 840314 Meeting Previously Obtained & Therefore Excluded from Request ML20215N0241986-10-28028 October 1986 Forwards Order from DOE Economic Regulatory Admininstration Granting Exemption from Prohibitions of Power Plant & Industrial Fuel Act of 1978 & Puc of Mi Opinion & Order Granting Relief from Commission 850329 Rate Order ML20214N4541986-09-0808 September 1986 Provides List of Activities Re Remedial Soils Work Being Modified Pending Final Disposition of Issues Described in Util 860701 & Counsel s Withdrawing Request for CP Extension.W/Svc List.Related Correspondence ML20212J1391986-07-25025 July 1986 Forwards ALAB-106 Monthly Rept for June 1986.Listed Nonconformance Repts & Addl Documents Closed During June Encl ML20206T2401986-07-0101 July 1986 Advises That Since Facility Formally Abandoned as Nuclear Facility,Util Will Not Reply to Generic Ltr 86-05 Re TMI Action Item II.K.3.5 ML20202B1091986-07-0101 July 1986 Forwards Evaluation of 13 Specific Recommendations Contained in BNL Rept of Review of Surveillance & Maint Program,In Response to CE Norelius 860506 Request ML20206T4321986-07-0101 July 1986 Withdraws Application for Ols.Facility Will Be Converted to combined-cycle gas-fired Plant.Abandonment Actions & Equipment Sales Will Provide Assurance That Plant Cannot Be Used as Nuclear Facility ML20199J9181986-06-30030 June 1986 Submits ALAB-106 Quarterly Rept 51.No New Individuals Assigned quality-related Duties.Const Shut Down Since 840716 & No Const Activities Projected for Jul-Sept 1986 ML20211L0361986-06-25025 June 1986 Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106 ML20198E9051986-05-25025 May 1986 Forwards ALAB-106 Monthly Rept for Apr 1986,including Nonconformance Repts,Quality Action Requests,Equality Audit Finding,B&W Repts of Nonconformance & Audit Finding Repts. Only Nonconformance Repts Encl ML20205P9331986-05-23023 May 1986 Responds to Generic Ltr 86-10, Implementation of Fire Protection Requirements. Project in Surveillance & Maint Mode.Generic Ltr & FSAR Update Will Be Reviewed When Project Restarted ML20203N3901986-05-0101 May 1986 Forwards Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications. Rev Approved by Tdi Owners Group & Tdi ML20205N5861986-04-29029 April 1986 Forwards Corrected Page 1 to JW Cook to H Berkow Re Pipe Whip Restraint Design.Last Line Inadvertently Eliminated When Ltr Originally Issued ML20197F8331986-04-28028 April 1986 Advises That Response to Generic Ltr 86-04 Re Engineering Expertise on Shift Inapproriate at Present Because Midland Not Currently Under Const.Commitment to Provide Info Will Be Added to Commitment Tracking Sys ML20210L2351986-04-25025 April 1986 Forwards ALAB-106 Monthly Rept for Mar 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20203K8531986-04-23023 April 1986 Responds to NRC Re Allegation Concerning Adequacy of Pipe Whip Restraint Design.Project Records Placed in Storage & Personnel Performing Work Dispersed.Specific Design Approach Would Require Check of Records at Bechtel ML20203P1661986-04-21021 April 1986 Discusses 860407 Study Considering Options for Facility. Options Range from Abandonment of Facility to Completion as Nuclear Plant.Conversion of Plant to Combined Cycle gas-fired Plant Chosen as Most Favorable Option ML20140F8781986-03-25025 March 1986 Forwards ALAB-106 Monthly Rept for Feb 1986,including Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20154H9651986-02-25025 February 1986 Forwards Nonconformance Repts Written or Closed During Jan 1986,per Memorandum & Order ALAB-106 ML20154D3581986-02-24024 February 1986 Confirms Items Agreed Upon in 860219 Telcon Re soil-related Issues.Util Will Discontinue Monitoring Dike Groundwater Wells During Shutdown & Site Maint.Authorization Given to Seal Weeping Wall Crack ML20198H2401986-01-24024 January 1986 Forwards ALAB-106 Monthly Rept for Dec 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings ML20138Q5531985-12-31031 December 1985 Submits ALAB-106 Quarterly Rept 50.No New Individuals Assigned quality-related Duties Since 850930 Rept & No Const Activities Projected for Jan-Mar 1986 ML20136C5711985-12-20020 December 1985 Forwards Monthly Rept for Nov 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings,B&W Repts of Nonconformity & Util Nonconformance Repts,Per ALAB-106 ML20138Q3871985-12-13013 December 1985 Ack Receipt of 851115 IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Valve Operability Program & Rept Scheduled to Be Completed Prior to OL Issuance ML20137Z1481985-11-27027 November 1985 Advises That Response to 851029 IE Bulletin 85-001, Steam Binding of Auxiliary Feedwater Pumps, Inappropriate at Present Since Plant in Surveillance & Maint Status.Schedule for Response Will Be Provided When Status Changes ML20137F2541985-11-25025 November 1985 Forwards ALAB-106 Monthly Rept for Oct 1985,including Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings,Per 730323 Order ALAB-106 & Amend 1 to Cp.Svc List Encl ML20138J4431985-10-25025 October 1985 Forwards Monthly Rept for Sept 1985,per Memorandum & Order ALAB-106 & Amend 1 to Cp,Including Bechtel Nonconformance Rept,Quality Action Requests,Mgt Corrective Action Repts, Quality Audit Findings & B&W Repts of Nonconformity ML20138D0031985-10-14014 October 1985 Informs That Util Will Submit Schedule for Meeting Requirements of 10CFR50.62(d) Per Generic Ltr 85-06 Re QA Guidance for ATWS nonsafety-related Equipment When & If Project Reactivated ML20137Y7921985-09-30030 September 1985 Submits Quarterly Rept 49,per ALAB-106.No New Individuals Assigned to quality-related Duties.Const at Plant Shut Down on 840716.No Const Projected for Fourth Quarter 1985.Next Quarterly Rept Will Be Submitted by End of Dec 1985 ML20133H1261985-09-25025 September 1985 Forwards Bechtel Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts & Quality Audit Findings Written or Closed During Aug 1985,per Condition of Memorandum & Order ALAB-106 ML20138S0731985-09-17017 September 1985 Advises That Addl Excavation Between Tank Farm & Auxiliary Bldg Will Be Conducted Per NRC 850826 Authorization. Excavation Needed to Provide Supplemental Cathodic Protection.Svc List Encl.Related Correspondence ML20140G8331985-08-23023 August 1985 FOIA Request for ACRS Documents Re Facility ML20137F7061985-08-12012 August 1985 Forwards Listed Documents Written or Closed During Jul 1985, in Accordance w/730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Only Nonconformance Repts Encl ML20132B1841985-07-19019 July 1985 Forwards Monthly Repts for May & June 1985 Per Condition of 730323 Memorandum & Order ALAB-106 & Amend 1 to Cp.Related Correspondence ML20128M1471985-07-19019 July 1985 Forwards Nonconformance Repts for May & June 1985,per 730323 Memorandum & Order ALAB-106 & Amend 1 to Facility CP ML20140G3691985-06-28028 June 1985 Responds to Generic Ltr 85-07,dtd 850502,re Implementation of Integrated Schedules for Plant Mods.Util Will Initiate Participation in Integrated Living Schedule If Project Reactivated.Survey Form Encl ML20127P1951985-06-28028 June 1985 Submits Quarterly Rept 48 Per ALAB-106.Const Shut Down Since 840716.No Const Activities Projected for Jul-Oct 1985.Next Rept Will Be Sent by End of Sept 1985 ML20128B8131985-06-20020 June 1985 Confirms 850610 Telcon W/D Hood Re Detailed Schedule for Shunt Trip Mods & Tech Spec Rev Established Per Generic Ltr 83-28,Items 4.3 & 4.4 (Generic Ltr 85-10).Schedule Commitment Entered Into Commitment Tracking Sys ML20127A9901985-06-17017 June 1985 Responds to Generic Ltr 85-02 Re Recommended Actions to Assure Steam Generator Tube Integrity & Rupture Mitigation. Facility Steam Generators in long-term Dry Layup Since Project Shut Down in Jul 1984 ML20126K2871985-06-0707 June 1985 Requests Extension of Due Date for Payment of Bill to Facilitate Resolution of Contested Fees.Conference to Discuss Billing Procedures Also Requested.Review of Info Re Bills Do 184 & Do 185 Encl ML20129B7261985-05-25025 May 1985 Forwards Bechtel Nonconformance Repts,Quality Audit Findings,B&W Repts of Nonconformity,Util Nonconformance Repts,Audit Finding Repts & Quality Action Requests for Apr 1985,per ALAB-106 ML20133C3771985-05-24024 May 1985 Responds to Request for Info on Item 13 in BNL Rept Re Exposure Time of Low Hydrogen Electrodes to Environ After Removal from Hermetically Sealed Containers or Drying/ Storage Ovens.Related Correspondence ML20133D9421985-05-0707 May 1985 Confirms 850426 Telcon Re Backfilling Number of Excavations of Site.Excavations Left Open Due to Removal of Temporary Freezewall Apparatus Last Fall.M Sinclair Response to Aslab 850423 Order & Svc List Encl ML20117J6761985-05-0707 May 1985 Submits ALAB-106 Quarterly Rept 47.No New Individuals Assigned quality-related Duties Since Last Rept.No Const Activities Projected for Apr-June 1985.Next Rept Will Be Sent in June 1985 ML20117G0641985-04-29029 April 1985 Responds to 850425 Request for Addl Info Re Recent Organizational Changes,Per 850425 Telcon.Announcement Involves Resolution of Legal Proceeding Surrounding Project & Possible Sale of Facilities ML20116E8611985-04-25025 April 1985 Forwards Bechtel & Util Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings & B&W Repts of Nonconformity for Jan & Feb 1985,per Memorandum & Order ALAB-106 ML20117G0831985-04-22022 April 1985 Informs of Reorganization Changes to Increase Efficiency of Energy Supply & Assimilate Certain Portions of Projects, Engineering & Const Organization ML20116D3371985-04-19019 April 1985 Ack Receipt of Jan 1985 BNL Rept Re Welding Allegations Encl w/850322 Ltr.Portion of Issues Closed.Remaining Open Issues Impracticable to Close Due to Lack of Resources. Investigation May Resume in Event of Restart 1989-04-28
[Table view] |
Text
,-
a' ^*
h e asb Consumem Donald 8 Miller, Jr Power su, u_,,,
Company ~~*"
Midland Project: PO Box 1963, Midland, MI 48640 e (617) 631-8660 March 29,1983 IPA STAFF I g4 P/RAi SCSs 1/10 2 9AO ZP? SLO Mr. W. D. Shafer, Chief ;[R33 TC Midland Project Section Ca5P ;
U.S. Nuclear Regulatory Cmmission UE' l
Region III ML i 799 Roosevelt Road SL fI LE Mj Glen Ellyn, IL 60137 MIDIAND PRCATECT GWO 7020
. REMEDIAL SOILS WORK AUTHORIZATION File: 0485.16 UFI: 42*05*22*04 Serial: CSC-6622 12*32 We are enclosing the proposed list of work in accordance with the "NBC and CPCo Work Authorization Procedure" for the period between April 1,1983 and April 30,1983. Please review this work list and authorize the specific work items as established in the procedure.
Also enclosed is a Supplemental Work Activity List for May 1983. Your review, cmments and authorization of the specific work items as in accordance with the procedure are similarly requested.
We have canpleted our review of the documents associated with the following activities. Based on our review, we ask for your approval of these activities:
105050908 - Perform Pier Ioad Test (Pier llW) 202550100 - Install Deep Seated Bench Marks (SWPS)
-207050605 - SWPS Dewatering - Install Remaining Ejector Wells 207050600 - Install Piezcmeters (Full Release) 207050635 - SWPS Dewatering - Install Dewatering Discharge System i
k g D. B. Miller, Jr.
. Site Manager ,
4 DBM/GRT/lrb Attachments i
8304070174 830329 l
PDR A
ADOCK 05000329 i PDR APR 41983
( 12fDI
, 1 Consumers Power Company Attachment to Sarial CSC-6622 Midland Plant Units 1 & 2 -
l .
WORK ACTIVITY LIST FOR THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 ACTIVITY PREVIOUS REGION III NEW OR PROGRAM, WORK AREA & ACTIVITY DESIGNATION REVISED ITEMS IDENTIFIER GENERAL QUALITY PROGRAM 102351100 Approval of MPQP-2, Rev 1 A(10/22/82) 102351115 Approval of MPQP-1, Rev 5 3 (1/11/83) A (1/11/83)
AUXILIARY BUILDING & FIVP UNDERPINNING PROGRAM ACCESS SHAFTS 105050906 Redress the slope lay back surfaces A (3/17/83) l WEST FIVP l
l 102150010 Install Anchor Bolts & Rods 1 (8/12/82) A (8/13/82)
(includes' hardness test on rods, drill concrete & steel and tensioning) l EAST FIVP
- 112150010 Install Anchor Bolts & Rods I (8/12/82) A(8/13/82)
(includes hardness tests on rods, drill concrete & steel, and tension)
CONTROL TOWER POST TENSION VERIFICATION 102550203 Verify Post Tension Loads A(2/22/83)
JEKostielney 3/25/83 eiO882-2439d173-163
(.
~
2 Consumers Power Comprny .
Attachment to Serisl CSC-6622 Midland Plant Units 1 & 2
- l WORK ACTIVITY LIST FOR THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III lREVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 162550010 WEST TURBINE / AUX BUILDING PIPE TURNNEL MODIFICATION Install Platiorm at El 600'
( includes installation of Pipe Tunnel Reinforcement, cutting of opening, Modification of Handrails and Ladder and Protection of Existing Piping) 4 152550010 EAST TURBINE / AUX BUILDING PIPE TUNNEL MODIFICATION Install Platform at El 600' l
.( includes installation of Pipe Tunnel Reinforcement.
. cutting of opening, Modification of Handrails and Ladder and Protection of Existing Piping)
BUILDING MONITORING 136050043 Maintain Instrument System 3 (8/12/82) A(8/12/82)
- 132550050 Install, wire conduit and raceway from pier 2(12/13/82) A(12/13/82) l to data room for Pier Instrumentation I
I 165052021 Terminate Cables in Data Room & Terminal Boxes A(3/10/83)
& Pier Instrumentation GENERAL TEMPORARY DEWATERING
, 125150050 Continue Monitoring Utility Protection Pits (4) 3 (8/12/82) A(8/12/82) 115150020 Continue Operation of Freeze System & Wells 3 (8/12/82) A(8/12/82)
- 522550025 Excavate, Repair and Backfill Piezometer HP-2
- 522550020 Repair Six (6) Existing Observation Wells (WB-1, WP-2, COE-10, PD-18, W-2, PD-38) 125150051 Install Clay to Below Duct Bank (pit 4) 1 (8/12/82) miO882-2439d173-163 JEKostielney 3/25/83
3 Consumers Power Company Attachment to Serial CSC-6622 Midland Plant Units 1 & 2
. WORK ACTIVITY LIST FOR THE PERIOD BETW5EN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 125150052 Repair Ductbank (Pit 4) 1 (8/25/82)
(includes exca'v ate, drift, repair and backfill) 115150026 Remove 36" Casing and Backfill 42" Hole 1 (9/17/82)
CRACK MAPPING (includes scaffolding platforms, ladders and extra-ordinary clean up) 102250200 EPA (East & West) 3 (8/12/82) A(8/12/82) 102250105 FIVP (East & West) 3 (8/12/82) A(8/12/82) 102250100 Control Tower & Remainder of Aux Bldg 3 (8/12/82) A(8/12/82)
PIER 12W 165054010 Install & Load Pier 12W3 1 (8/12/82) A(12/9/82)
PIER 11W 165052027 Drift from Access Shaft to Pier 11W1 (includes access pit) 1 (8/25/82) A(2/22/83) 165053015 Excavate Pier 11W2 1 (8/25/82) A(2/22/83) 165054015 Install & Load Pier 11W3 1 (8/25/82) A(2/22/83)
(includes install bituminous plywood forms) 105050908 Perform Pier Load Test 1 (8/25/82)
PIER 9W 165054005 Install & Load Pier 9W3 1 (9/17/82) A(2/24/83)
.miO882-2439d173-163 JEKostielney 3/25/83
4 iCensumsrs Power Comp:ny . Attachment to Serial CSC-6622 l Midland Plant Units 1 & 2 -
WORK ACTIVITY LIST FOR THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER 12E 155054010 Install & Load Pier 12E3 1 (8/12/82) A(12/9/82)
PIER IIE 155052027 Drift from Access Shaft to Pier 11El (includes access pit) 1 (8/25/82) A(2/22/83) 155053015 Excavate Pier 11E2 1 (8/25/82) A(2/22/83) 155054015 -
Install & Load Pier 11E 3 1 (8/25/82) A(2/22/83)
PIER 9E 155054005 Install & Load Pier 9E 3 1 (9/17/82) A(2/24/83.)
! PIER 8E 1
155052025 Drift from Pier 9E to Pier 8E1 1-(9/17/82)
- 155053020 Excavate Pier 8E2 1 (9/17/82) 155054020 Install & Load Pier 8E3 ,
1 (9/17/82)
GRILLAGE STRUCTURE AT PIER 8E 155052305 Drift for and Install Bulkhead from Pier 8E north to 1 (9/17/82)
Containment Walli -
155059025 Excavate and Remove Hudslab for Grillage Beams Between 1 (9/17/82) l Pier 8E and Containmenti Excavate for Support Columns next to Containment 2 155053025 1 (9/17/82) 155055003 Install Steel Support Columns next to Containment 1 (9/17/82) 155055010 Install & Load Grillage Structure at Pier 8E 1 (9/17/82)
I miO882-2439d173-163 JEKostielney 3/25/83
5
- Consumers Pcwsr Company Attachment to Serial CSC-6622
- Midland Plant Units 1 & 2 -
WORK ACTIVITY LIST FOR THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III l REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION PIER 8W 165052025 Drift from Pier 9W to Pier 8W1 1 (9/17/82) 165053020 Excavate Pier 8W2 1 (9/17/82) 1 165054020 Install & Load Pier 8W3 1 (9/17/82)
GRILLAGE STRUCTURE AT PIER 8W 165052305 Drift for and Install Bulkhead from Pier 8W north to 1 (9/17/82)
Containment Wall!
165059025 Excavate and Remove Mudslab for Grillage Beams Between 1 (9/17/82)
Pier 8W and Containment 1 165053025 Excavate for Support Columns next to Containment2 1 (9/17/82)
- 165055003 Install Steel Support Columns next to Containment 1 (9/17/82) 165055010 Install & Load Grillage Structure at Pier 8W 1 (9/17/82)
PIER KC2 165052325 Drift from West Access Shaft to Pier KC21 1 (9/17/82)
PIER KC11 155052325 Drift from East Access Shaft to Pier KC111 1 (9/17/82)
EXCAVATION ZONES
- 155052020 Excavate / Lag Zone Y1
- 165052020 Excavate / Lag Zone Z1
- aiO882-2439d173-163 JEKostielney 3/25/83 o .
6 Censumers Power Comprny . Attachment to Serial CSC-6622
- Midland Plant Units 1 & 2 -
WORK ACTIVITY LIST FOR THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION RESHORE PIERS
- 155052050 Reshore E9, Ell, E12 and Install E10 Bulkhead 4
- 165052050 Reshore W9, Wil, W12 and Install W10 Bulkhead 5 i
PIER W10 165053035 Excavate Pier 10W2 1 (9/17/82)
- 165054030 . Install & Load Pier 10W3 PIER E10 155053035 Excavate Pier 10E2 1 (9/17/82)
- 155054030 Install & Load Pier 10E3 BEAM CONNECTIONS 102250201 Modify Beam Connections at elev 646 ( 1 connection) 1 (9/17/82) 102250203 Modify Beam Connections at elev 659 ( 2 connections) 2(12/13/82) 102250205 Modify Beam Connections at'clev 704 (10 connections) 2(12/13/82)
El-569 SLAB FIX
- 102250208 Survey / Layout for Lagineering Review in Preparation for Slab Fix @ El 659 SERVICE WATER PUMP STRUCTURE UNDERPINNING PROGRAM POST TENSIONING SYSTEM 202555170 Post Tensioning Tendon inspection & maintenance 3 (12/7/82) A(12/7/82)
DEWATERING 207050618 Install 6 Preliminary Ejector Wells A(3/10/83) niO882-2439d173-163 JEKostielney 3/25/83
. 7 iconsumersPowerCompany Attschment to Sarial CSC-6022 iMidlend Plant Units 1 & 2 -
WORK ACTIVITY LIST FOR THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR -ACTIVITY PREVIOUS REGION III iREVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION
- 207050605 Install Remaining Ejector Wells R 207050385 Core Drill SWPS Slab for Ejector Wells A (3/17/83) 207050386 Core Drill CWIS Slab for Ejector Wells 1 (11/1/82) A (3/17/83) 207050603 Probe for Shallow Utilities 3(12/29/83) A(12/29/82)
- 207050604 Probe for Deep Utilities Within El 610 Excavation Limits 1 (9/17/82) A(3/10/83) i (Ref Dwg C-2031)
- 207050748 Probe for Deep Utilities Outside El 610 Excavation Limits (Ref Dwg C-2031) 207050600 Install Piezometers R 207050645 Install Seal Between SWPS & CWIS i(8/25/82)A(2/22/83) 207050635 Install Dewatering Discharge System 2 (9/17/82)
(including headers, tank, pumps and electrical) 207050387 Convert 7 Wells used on 72" pipe repair to support SWPS 1 (11/1/82) A(2/11/83)
I dewatering. (Includes install new ejectors, temporary headers, operate, & maintain)
BUILDING MONITORING 202550100 Install Deep Seated Bench Marks 1 (8/12/82) 206050105 Crack Map SWPS 1 (9/17/82) A(3/10/83) 202550130 Installation of Extensometer Anchors i
- siO882-2439d173-163 JEKostielney 3/25/83 l
'8
- Cen
- umers Pcwar Comp:ny . Attschment to Snrial CSC-6622 iMidland Plant Units 1 & 2 -
WORK ACTIVITY , LIST FOR THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982-NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 202550120 Installation of Extensometer Covers 206050100 Install EFtensometers 1 (9/17/82)
- 206050106 Install Instruments and Terminate Instrument Cables 1 (9/17/82)
(Includes testing & calibration) 206050102 Install Brackets 1 (9/17/82) 207550100 ,Eebar Mapping & Core Drilling for Conduit & Raceway A(3/10/83) 207550103 Install Conduit & Raceway 1 (9/17/82) A(2/22/83) 202550104 Install cable and terminate at Data Acquisition Room 1 (9/17/82)
- 206050101 Install Permanent Benchmark Covers 1 (9/17/82) 206050104 Baseline, Operate, and Maintain Instrument System R ACCESS SHAFT & OPEN CUT EXCAVATION 207050335 Install Soldier Piles 1 (8/12/82) 202550162 Relocate Fire Protection Pipeline 1 (8/12/82) A (9/17/82)
- 207050400 Repair SWPS Duct Bank BORATED WATER STORAGE TANK FOUNDATION _& TANK REPAIR PROGRAM UNIT 1 TANK 312150111 Rebar Mapping 3 (8/25/82) A (8/25/82) 312150005 Drill and Grout Shear Connectors 2(12/13/82) niO882-2439d173-163 JEKostielney 3/25/83 9
. - - - ..~ . -- .- -
9 IConsumers Powar Company Attachment to Sariel CSC-6622
! Midland Plant Units 1 & 2' WORK ACTIVITY LIST FOR-THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 4
NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION l
312150011 Construct New Ring Beam 1 (8/12/82)
(set forms & place rebar, pour concrete) 312150211 Strip Waterproof Membrane on Valve Pit 3 (8/25/82) A (8/25/82) 312550019 Reinstall Electrical Ductbank 2 (9/17/82) 312550018 Reinstall Piping, Pipe Hangers and Electrical Facilities A (3/17/83)
UNIT 2 TANK 322150111 Rebar Mapping 3 (8/25/82) A (8/25/82) 322150005 Drill and Grout Shear Connectors 2(12/13/82) 322150011 Construct New Ring Beam 1 (8/12/82)
(set forms & place rebar, pour concrete) 322150211 Strip Waterproof Membrane on Valve Pit 3 (8/25/82) A (8/25/82) 322550019 Reinstall Electrical Duct Bank 2 (9/17/82) 322550018 Reinstall Piping, Pipe Hangers and Electrical Facilities A (3/17/83)
UNDERGROUND PIPE REPLACEMENT, REBEDDING, AND MONITORING PROGRAM i
- TRAIN A & B 0F SERVICE WATER PIPE REPLACEMENT 202550500 Excavate Existing Pipe 1 (8/12/82) 202550510 Remove Existing Pipe 1 (8/25/82) 202550520 Install new pipe & expansion coupling 1 (8/25/82) laiO882-2439d173-163 JEKostielney 3/25/83 l
10 Consumers Powar Company
- Attachment to Serial CSC-6622 Midlend Plant Units 1 & 2 WORK ACTIVITY. LIST FOR THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 20, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION 402550515 Hydro Test new pipe R 402550507 Perform Profiling & Ovality Check on New Piping R
- 402550525 Temporary Backfill New Pipe PERMANENT INTRUSION DETECTION SYSTEM 732050002 . Install Wire (incl conduit) 3 (8/25/82) A(8/25/82) 732050003 Install Fence (incl fence posts & concrete strip 3 (8/25/82) A(8/25/82) 732050004 Install Grounding 3 (9/17/82) A(9/17/82)
OBS-4 Repair 52'2550018 Dutch Cone Soil Testing in Vicinity 2(12/13/82) of OBS-4 for exploratory " purposes Acid-Caustic Unloading Station 822550001 Excavate for install and backfill drainline and 1(11/1/82) slab for Acid-caustic unloading station at East end of Turbine Building l
EMERGENCY PERSONNEL LOCKS - UNIT 2 792550005 Excavate for, Install and Backfill Concrete Airlock Structure 1 (9/17/82) l PERMANENT DEWATERING PROGRAM
- 522550015 Install Guard Posts for Protection of tiell J-1 aiO882-2439d173-163 JEKostielney 3/25/83
11 Consumers Pcwer Company Attechment to S rial CSC-6622 Midlend Plant Units 1 & 2 WORK ACTIVITY LIST FOR THE PERIOD BETWEEN APRIL 1, 1983 AND APRIL 30, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION YADD PERMANENT DEEPSEATED BENCHMARKS
- 133150010 Yard-Install Permanent Deepseated Benchmarks (PBM-4 and PBM-5)
I eiO882-2439d173-163 JEKostielney 3/25/83
1 C:nzumera Pow 2r Company Attachment to S3 riel CSC-6622 Midland Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN MAY 1, 1983 AND MAY 31, 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION AUXILIARY BUILDING & FIVP UNDERPINNING PROGRAM PIER KC 2 165053320 Excavate Pier KC 22 1 (9/17/82) 165054315 Install & Load Pier KC 28 1 (9/17/82)
PIER KC 11 155053320 Excavate Pier KC 112 1 (9/17/82) 155054315 Install & Load Pier KC 113 1 (9/17/82)
PIER W16
- 165052055 Drift from West Access' Shaft to Pier W161 (includes Access Pit)
- 165052055 Excavate Pier W162 PIER E16
- 155052055 Drift from East Access Shaft to Pier E161
- 155053037 Excavate Pier E162 PIER KC 3
- 165052310 Drift to KC3 from W81
- .b5053310 Excavate Pier KC 32 ciO882-2439f173-163 JEKostielney3/25/83
-.~J
2 Consumers Pcwer Comprny Attechment to Sarial CSC-6622 Midlend Plant Units 1 & 2 SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN MAY 1, 1983 AND MAY 31, 1983 -
DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY .
PREVIOUS REGION III REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION
- 165054305 Install & Load KC 38 PIER KC 10
- 155052310 Drift to KC 10 from E81
- 155053310 Excavate Pier KC 102
- 155054305 Install & Load KC 103 EXCAVATION ZONES
- 165056375 Excavate / Lag Zone Z2
- 155056375 Excavate / Lag Zone Y2 PIER W14
- 165052057 Drift from West Access Shaft to Pier W141 (includes Access Pit)
- 165053055 Excavate Pier W142
- 165054050 Install & Load Pier W143 PIER E14
- 155052057 Drift from East Access Shaft to Pier E141 (includes Access Pit)
- 155053055 Excavate Pier E142 miO882-2439f173-163 JEKostielney 3/25/83
3
' Consumers Power Comprny .
Attschment to Serial CSC-6622
' Midland Plant Units 1 & 2
- SUPPLEMENTAL WORK ACTIVITY LIST FOR THE PERIOD BETWEEN MAY 1, 1983 AND MAY 31', 1983 DEVELOPED IN COMPLIANCE WITH ASLB ORDER OF APRIL 30, 1982 NEW OR ACTIVITY PREVIOUS REGION III
- REVISED ITEMS IDENTIFIER PROGRAM, WORK AREA & ACTIVITY DESIGNATION
- 155054050 Install & Load Pier E148 SUPPORT BRACKET l
- 152555010 Install Temporary Support Bracket at El
- 162555010 Install Temporary Support Bracket at W1 SERVICE WATER PUMP STRUCTURE PROGRAM EXCAVATION
- 207050780 Excavate East & North Wall of Access Shaft DEWATERING SYSTEM 207050620 Activate, Operate and Maintain Dewatering System 1 (9/17/82)
PERMANENT DEWATERING
- 522550015 Excavate Headers & Metering Pits, Install Header and Level Monitoring System, Install Pumps, '
i Timers and Backfill BORATED WATER STORAGE TANK FOUNDATION AND TANK REPAIR PROGRAM 312550100 Install Instruments (includes testing and calibration) 1 (11/1/82) l 322550100 Install Instruments (includes testing and calib' ration) 1 (11/1/82) aiO882-2439f173-163 JEKostielney 3/25/83
NOTES A single asterisk (*) in left hand column indicates the work activity is a.new item.
A double asterisk (**) in left hand column indicates the work activity description has been revised. ,
Designation 1 in the right hand column indicates additional information is required by NRC Region III on this critical activity.
Designation 2 in the right hand column indicates no additional infarmation is required by NRC Region III on this critical activity.
Designation 3'in the right hand column indicates that the activity is not critical and work can proceed.
The date shown after the designation corresponds to the date of the NRC letter that provided the designation.
' An "A" following the designation indicates that Region III has provided approval to proceed with the activity. The date following the "A" corresponds with the date of the NRC letter that provides authorization to proceed with the work activity.
A "R" in the right hand column indicates that previcus designation or approval has been recinded because of a significant revision to the work activity or 90 days has elapsed or is expected to elapse since the work was authorized without the work being initiated.
l l
I i
I miO882-2439e173-163 l
t FOOTNOTES 1
Drift Activity normally includes
- 1. fabricate steel sets
- 2. excavate
- 3. install steel sets (Hilti bolts as necessary)
- 4. remove concrete (as necessary)
- 5. localized dewatering (as necessary)
- 6. install wood lagging .
- 7. place mudmst
- 8. stabilize soil (as necessary)
- 9. brace and/or rebrace -
2 Excavate Pier activity normally includes
- 1. excavate
- 2. concrete removal (as necessary)
- 3. dewatering (as necessary)
- 4. fabricate steel lagging
- 5. install steel lagging
- 6. auger bottom of pit to determine hydrostatic water pressure & plug (piers 10 & 12 E&W)
- 7. place mudmat
- 8. stabilize soil (as necessary) 3 Install & load Pier activity normally includes
- 1. fab & install embeds
- 2. fab & install reinforcing steel
- 3. install telltales
- 4. install Carlson meters (pier 11 E&W)
- 5. place concrete
- 6. fab & install leveling & bearing plates, jackstands
- 7. install jacks
- 8. transfer load.
- 9. monitor and adjust pier jacks after load transfer 4 This number was previously associated with Excavate Access for Pier 10E which has been deleted from our list.
s This number was previously associated with Excavate Access for Pier 10W which has been deleted from our list.
I miO882-2439bl73-163
.