ML20080N543

From kanterella
Revision as of 19:01, 19 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests That Insp Rept 50-275/83-37 & Related Repts, Studies & Documents Immediately Be Placed in PDR & Issued to Svc List in Proceeding
ML20080N543
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/15/1984
From: Reynolds J
CENTER FOR LAW IN THE PUBLIC INTEREST, JOINT INTERVENORS - DIABLO CANYON
To: Gilinsky V, Palladino N, Roberts T
NRC COMMISSION (OCM)
References
ISSUANCES-OL, NUDOCS 8402220279
Download: ML20080N543 (2)


Text

CENTER FOR LAW cou..t.Fn .

IN THE Pusuc INTEREST UW LEGAL STAFF 30951 WEST #8CO SOULEVARD WASHINGTON. D.C. OFFICE N AN CY C, CR8SM AN' R LYLE W. H ALL, J R. THIRD FLOOR *

, 75 E E T. N.W.

JOHN R. PH'LL*RS LOS ANG ELES. CALIFORNIA 90064-2166 50 IC ATHE RIN E P. RANSEL' T E L E RH O N E: 12:3t 470-3000 *

- JCEL R. REYNOLDS TELERHONE: (202) 371-089 9 MARILVN O.TESAURO . . -

FREDetC D.WOOCHER NICHOLAS C. YOST [R[Lp'L7 TM JCD

  • h M'E Yib.k OF COUNSEL hdM bH CEOFFREY C AN ADMINi$fRATivE OFFICER MARSHAH. KWALWASSER VISITING FELLOWS LAWRENCE A. GOLDBERG JCCELYN D. LARMIN CYNTHI A O. RoseINS ETH AN P. SCHULM AN February 15, 1984

'::"T!* "' **

Nunzio Palladino, Chairman Victor Gilinsky, Commissioner ,

Thomas Roberts, Commissioner James Asselstine, Commissioner Frederick Bernthal, Commissioner United States Nuclear Regulatory Commission Washington, D.C. 20555 Re: In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Nos. 50-2750L, 50-373OL

Dear Chairman Palladino and Members of the Commission:

SSER 21 in the above-entitled proceeding was issued in December 1983. In that document, the NRC Staff relies upon Inspection Report 50-275/83-37 in concluding that the 1977 Nuclear Services Corporation ("NSC") audit of Pullman Power Products and all of its findings have been resolved. SSER 21, Allegation 68, at 2-158.

As I mentioned to the Commission at the February 10, 1984 briefing, Inspection Report 83-37 has never been issued.

Because of the continuing importance of the NSC audit and the recent allegations by Pullman personnel confirming its critical findings, we believe that the Inspection Report relied upon by the Staff in reaching a contrary conclusion over two months ago should be available for review by the Commission, all parties, and the public.

O OS

+

BOARD OF TRUSTEc5

[ o aurve.c or Y maurtY wcroe atuitm u 6n oo ato u. sumo n3

^

.o A*:"~.'",

. ."o"#J M'# ,,..

CamLytt a meaLL, sm.

T3."al.'" 'o' ~'L.,

wwame peESS Os'.M':',.'"" =:01~;t

otaois meteot acAm graune U

U.S. Nuclear Regulatory Commission February 15, 1984 Page Two 1

l Accordingly, we request that Inspection Report 50-275/83-37 and any related reports, studies, or other documents be immediately placed in the Public Document Room and issued to !

the service list in this proceeding.

Very truly yours, ON Je R. Rey ol s Counsel to the Joint Intervenors JRR:cc ,.

cc: Diablo Canyon Service List i

l l

l

%