|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML20207C9851999-05-28028 May 1999 Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML20206U7441999-05-20020 May 1999 Informs That NRC Unable to Conclude That NAPS Has Met Intent of Supplement 4 to GL 88-20.RAI Re Fire Area of IPEEE Encl. Response Requested within 90 Days of Submittal Date ML20207A8541999-05-20020 May 1999 Forwards RAI Re Licensee Listed Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 90 Days of Submittal Date ML20195B5381999-05-14014 May 1999 Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML20206L4661999-05-10010 May 1999 Forwards SE Accepting Request to Delay Submitting Plant, Unit 1 Class Piping ISI Program for Third Insp Interval Until 010430,to Permit Development of Risk Informed ISI Program for Class 1 Piping 1999-09-08
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML20206M7921999-05-0707 May 1999 Advises That Vepc Is Proposing to Use Three Chemicals in Bearing Cooling Tower at Naps,That Were Not Addressed in Licensee Last Application for Reissuance of Vpdes Permit ML20196H6431998-12-0303 December 1998 Informs That Util Is Seeking Approval to Discharge Chlorinated Blowdown from Bearing Cooling Tower for More than 2 H Per Unit as Specified in Special Condition 10 of Vpdes Permit.Meeting During Wk of 981214,requested ML20153G0131998-09-22022 September 1998 Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 VAC25-91-130,Pollution Prevention Requirements) for North Anna Nuclear Power Station ML18152B8171998-05-18018 May 1998 Discusses Results of Data Contained in Discharge Monitoring rept-QA (Dmr/Qa) Dtd 980114 ML20217Q7691998-05-0404 May 1998 Forwards Revised Application for Exclusionary General Permit for NAPS as Requested by D Vaughan in ML20198P8791998-01-12012 January 1998 Submits Application for Exclusionary General Permit for Plant ML20203H6111997-12-15015 December 1997 Forwards Application for General Storm Water Permit for Construction Activity at Naps.Local Government Ordinance Form,Pink Copy of Permit Application Fee Form & Copy of Check for Application,Encl ML20198P2871997-10-29029 October 1997 Requests That Vpdes Permit Be Amended to Reflect That Three Small Package Sewage Treatment Plants Were Permanently Removed from Svc ML20210G9721997-07-22022 July 1997 Submits Proposal to Pressure Test Piping within 10 Days Prior to Normal Fuel Oil Unloading Into Ast,Beginning No Later than 980101 ML20138B3381997-04-23023 April 1997 Provides Info to Support Proposal to Perform Annual Pressure Testing as Method of Leak Detection for Underground Line That Runs from Loading Area 5,000 Barrel Aboveground Storage Tank ML18153A1171997-03-19019 March 1997 Discusses Discharge Monitoring report-quality Assurance (DMR-QA) Results for VA Power Facilities ML20149M8131996-12-0505 December 1996 Submits Conditions Which Are Part of 961202 Approval of Temporary Conditional Use Permit Which Allows Construction of Temporary ISFSI or Dry Cask Storage as Listed ML20101R2521996-04-10010 April 1996 Responds to Unacceptable Results Noted in Discharge Monitoring rept-QA Rept for North Anna Power Station (Permit VA0052451) & Yorktown Power Station (Permit VA0004103) ML20101J0511996-03-21021 March 1996 Provides Notice of Intent to Increase Amount of Reverse Osmosis Reject Water Discharged at Outfall 020 ML20100B9061996-01-24024 January 1996 Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp by Ferc,Per 18CFR12.44(b)(2).Main Dam'S Five Spillway Gates Satisfactorily Tested as Specified on Attached Form ML20087L3411995-08-21021 August 1995 Notifies of Minor Change in Discharge or Mgt of Pollutants at Plant ML20083K7181995-05-0404 May 1995 Forwards Application for Reissuance of Vpdes Permit for North Anna Power Station W/Addl Data Requested by ML18153A8081995-04-28028 April 1995 Provides Comments on EPA Pr Re Criteria for Certification & Determination of Waste Isolation Pilot Plant Compliance W/ Environ Standards for Mgt & Disposal of SF,high-level & Transuranic Radwastes.Guidance Re Categorization Needed ML18153A7921995-04-12012 April 1995 Submits Comments Re Proposed Revs to Guidance Provided to Federal Agencies on Radiation Protection ML20080J9181995-02-22022 February 1995 Submits Annual Statement Verifying That Each Spillway Gate Has Been Operated at Least Once During Twelve Months Preceeding Annual Insp by FERC Regional Engineer ML20080K8561995-02-22022 February 1995 Submits Notification for Spillway EDG Corrective Maint & Start Failure for Plant Hydroelectric Project ML20078M1481995-02-0808 February 1995 Discusses Series of Problems at Sewage Treatment Plant Re Exceedance in Bod ML20078H0711995-01-30030 January 1995 Discusses Conditions Affecting Safety of Project That Documents Problem Encounter W/Spillway EDG at Plant Main Dam & Informs on 950103 Spillway EDG Failed to auto-start During Performance of Monthly Periodic Test ML20078E1251995-01-25025 January 1995 Submits Notification Re Stationary Source Permit to Construct & Operate an EDG ML20080C1381994-11-30030 November 1994 Responds to Issues Identified in Repts for Technical & Lab Insps on 941018 & 20.Corrective Actions:Corrected DMR Forms Completed & Submitted to Dept of Environ Quality & TSS Worksheet Form Revised ML20077C2481994-11-22022 November 1994 Discusses Licensee Request for Relief from Ph Limitations in Plant Current Vpdes Permit at Outfalls 003 & 004 ML20078G8421994-11-0909 November 1994 Submits Response to Violations Noted in Insp Repts 50-338/94-10 & 50-339/94-10.Corrective Actions:Upset Conditions Corrected & Facility Performance Inproved ML20071L6281994-07-28028 July 1994 Ack Receipt of Detailed Response to NPDES Insp Rept ML18153B0261994-07-25025 July 1994 Forwards Update on Containment & Accumulator Initial Temp Assumptions for LB-LOCA Analysis ML20071H5761994-07-13013 July 1994 Notifies That Station Blackout Generator at Util Scheduled for Startup on or Around 940820 ML18153A9891994-07-0101 July 1994 Responds to VEPCO 940614 Ltr Re Proposed Procedure for Disposing of Low Level Radioactive Contaminated Asbestos Waste from Surry & North Anna Power Stations ML18153A9681994-06-14014 June 1994 Confirms Agreements Reached During 940419 Telcon Re Util Proposed Procedure for Tracking low-level Radiologically Contaminated Asbestos Waste Once Shipped to Interim Processor for Vol Reduction ML20069K2581994-06-0909 June 1994 Responds to Insp Rept & Deficiency Notice Received at Plant Following 940322 Insp.Since No Prior Notice of Changes to Std Methods Rule Given,Impacted Permittees Should Be Allowed Reasonable Time to Come Into Compliance W/Any Changes ML20065R3591994-05-0202 May 1994 Forwards Caterpillar 940210 Memo Addressing Issues Re Emission Limits in Permit Issued on 931020 Which Differ from Limits Requested in 930830 Application for Permit to Install Emergency Standby diesel-powered Generator at Plant ML20065F2761994-04-0505 April 1994 Proposes to Discontinue Survey Between North Anna Main Dam Ref Monuments & Us Coast & Geological Survey Monuments Performed Once Every 10 Yrs to Verify Locations of Ref Monuments ML20058F8811993-12-0202 December 1993 Submits Plan & Schedule for Development & Submittal of Annual Repts of Embankment Instrumentation & Survey Data,As Result of Annual Insp of North Anna Hydroelectric Facility ML20058D5901993-11-19019 November 1993 Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp Conducted by FERC on 930921,per 18CFR12.44(b)(2) ML20057A9861993-09-0808 September 1993 Documents Understanding That,Due to Current Workloads at Agency,Recipient Will Not Be Available for Meeting Until After End of Sept,Per in Ref to Contested Findings of 930518 RCRA Insp at Plant ML20056G4091993-08-20020 August 1993 Responds to Util Rebutting Violations of Virginia Hazardous Waste Mgt Regulations Cited in 930607 ML20045G4031993-07-0707 July 1993 Responds to State 930607 Ltr Re Findings Noted in RCRA Insps on 930518.Licensee Has Demonstrated That No Violations W/Respect to Unmarked Drum & Accumulation Time & Annual Rept & Contingency Plan Occurred ML20126C6071992-12-18018 December 1992 Forwards Water Temperature Data Collected for Third Quarter of 1992,July-Sept at North Anna Power Station in Compliance W/Vpdes Permit VA0052451 Under Special Condition 8.Plant Operation Data Through Sept Shown in Figure 3 ML20116J2641992-11-0909 November 1992 Forwards Completed Oil Response Questionnaire for 921002 Oil Discharge.Discharge Was Contained within Treatment Facility & No Discharge to Waters Outside Facility Occurred ML20105A9731992-09-0909 September 1992 Responds to Telcon & Re Method of Compliance W/ Dates for Training in Fire Extinguisher Use.Under Proposed Procedure,Util Will Need to Maintain Internal Record Available for Review by State of VA for Min of 12 Months ML18153D0931992-08-12012 August 1992 Suppls 911223 Ltr Re Disposal of Asbestos,Containing Matl from North Anna & Surry Stations.Asbestos Shipment Left North Anna on 910828 for Quadrex for Processing.Remaining Portion Buried at Barnwell on 920629 ML20141M3391992-08-0505 August 1992 Responds to Telcon W/W Butler (Air Pollution Control Inspector) Re Fire Watch Training Program & State of VA Dept of Air Pollution Control Open Burning Notification Requirements ML20099A8571992-07-23023 July 1992 Advises That Settlement Offer,Described in , Acceptable to Util.Item 3 of Proposal Re Employee Environ Awareness Video Awarded to Echo Films,Inc.Site Barriers Constructed to Cover Entrances to Security Blockhouse ML20101S6181992-07-0909 July 1992 Forwards NPDES Discharge Monitoring Rept for June 1992 for North Anna Power Station. High Ph Problems in Turbine Bldg Sumps May Be Due to Residual Effects of Earlier Hydrazine Spill 1999-08-17
[Table view] |
Text
lobtu,,A Isq hosos at writer 1- 4w0) I homorrors ik ,ubq avl
. <,t.on.c.n von:soria : n n i .
November 9, 1992 VIRulNIA POWER Mr. David Wright, Chief 011 and Tislo III Section (311W34)
U.S. Environmental Protection Agency Region III, 303 Methodist Bldg.
lith & Chapline Streets Wheeling, WV 26003 RE: NORTH ANNA POWER STATION OIL RESPONSE QUESTIONNAIRE VA93003; OCTOBER 2, 1992; LOUISA COUNTY, MINERAL, VA
Dear Mr. Wright:
Attached is the completed oil response questionnaire for the above referenced incident. I would like to point out that this oil discharge was contained within the station's treatment facilities and no discharge to waters outside those facilities occurred.
. Should you vasire additional information or have any questions in this matter, please contact Daniel James at (804) 273-2996.
Sincerely, ,
//
bY D. . farshall, ) .E.
Manager Water Quality Attachments cc: (w/ attachments)
U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Re: North Anna Units 1 & 2 Docket Nos. 50-338/50-339 License Nos. NPP-4/NPT-7 U.S. Nuclear"Regula~ tory.Comdission Document Control Desk Washington, DC 20555 Re: North Anna Units 1 & 2 Docket Nos. 50-338/50-339 License Nos. NPF-4/NPF-7 1300S$ Mr. M. S. tesser p/
NRC Senior Resident Inspector 0 I North Anna Power Station I
}
9211160110 921109 PDR ADOCK 05000338 (
s PDR
.._ -._ _ - - - . . _ - - - ~ . _ _ . . . - - - . , - . . . -
/'* *% UMTED STATES WWM0peWfTM PRCHECTloN AGENCY P
' )
l FWm0N O 841 Chassad Badeig l Phtedu5Na, Pennuytveds 19107 l Omm of nW Deem DW pos) zwaass Pads M l Met Code 34W34 oil Response !
OCT f 2 IW Virginia Power P. O. Box 402 Mineral, VA 23117 }
PE: VA 93003 October 2, 1992 louisa Cnty, Mineral VA l Gertlement l 1
This office has received notification that your facility I discharged oil or hazardous materials in quantities that may be harmful, in violation of section 311(b)(3) of the Federal Later ;
Pollution Control Act Amendments of-1972, 33 U.S.C. Section 1321 (b) (3) . Pursuant to Section 308(a), 33 U.S.C. Section 1318(a), you are-hereby required'to submit to EPA.the following information. Any person who violates section 30s is subject to a l j
civil penalty of up to $10,000 per day of violation 33 U.S.C.
Section 1319(d). Further, any. person who-willfully or negligently violates section 30s may_be punished by a fine of not ;
less than $2,500, nor more than $25,000 per day of-violation, ._ 1 or by-imprisonment for not more than one year or both. 33 U.S.C._. 4 Section 1319 (c) (1) . .
- 1. Does the facility have a National: Pollutant Discharge:
Elimination System (NPDES) Permit? YES or .
NO Yes If VES, state'.the Permit number: VA0052451
[
- 2. Does the facility currently have a Resource conservation-and Recovery Act (RCRA) Permit or is the facility under Interim;- '
Status?
.j No 1
L: -
- 3. Does the faci _ity.have a Spill Prevention Control and Countermeasure (SPCC)' Plan cartified and. implemented in- '
L accordance-with-40 CFR 1127 s
i
.YES-or
. NOL Yes I
e u ,, . - - . _ . _ , - . . . . _ . , . _ - . . - - - - - .
-i a
2
- 4. Time and date of diucharge.
t Jvent occurret at approximately 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />. October 2, 1992. No discharge outside of the station's treatment fac118 ties occurred.
5.
Data waterways.
and time of discovery that the discharge was entering the
.No dischane to waterways occurred.
6.
Description of the vehicle or facility from which the material was discharged (i.e., pipeline, tank, well, etc.): j
_VPDES internal outfall 004, oil / water separator. I 7.
Name and address of the owner of the vehicle or facility described above in (6). ;-
Vircinia Power - Attn B. M. M,arshall. Manager Water Quality 5000 Dominion Boulevard d1on Allen. VA 23060 "
8.
Name and address of the operator of the-vehicle or facility described above in (6): and, .if different- from (7) above, -
i describe the relationship between'the owner and operator (i.e. ,
employee, subcontractor, lessee, etc.) ,
Vircinia' Power - North Anna Power Station P .- n. Mr 402 Mineral. VA 23117
- 9. Location of the discharge, including county and state.-
VPDES internal outfall 004. North Anna-Power Station. Mineral.. i Louisa County, Virginia '
t 3
I' 6
~
,~v c -,,c & aw$ se, ,--!.-
. --,w_v2. -,-.,--__-_:+,,ee- ,--,-e-~_mvr,w-.-e+re ,-.ee -+ 4e ,. w - w, y
' 3_ l I
10.
List the type for any oil relatedof oil and total storage capacities at the facility products. i the facility, Describe the storage tanks at '
fe.g., above ground, underground, etc.)
See attachment.
l r
l
- 11. Material (s) discharged. l t
_ Material involved in this evelt was oily water.
- 12. Quantity of material discharged from the facility or vehicle.
None.
- 13. Did the material anter into any water? (YES or NO)._ Yes !
Did the material enter into any sewer? (YES or NO)_ No (a) If YES, describe the first water reached and the location of this water.
The never rtation's Discharce Canal which leads te the tlaste Heat Treatment Facility.
(b) State the quantity of material entering the water descrited above in 13(a).
Less than 5 mallons. ,
(c) State the quantity'of material reaching the' shoreline of.
the water described above in 13(a) which did nottenter the water. ,
None.
(d) Was=the water descEibed above in 13(a),Lat the time of the spill, a tributary of, or physically connectedt to a navigab'e waterway.
(YES or NO) No t
i u
-- a - . . - - .. .- .. . - . . . . . , . . .
1 .
4 (e) If the answer to 13(d) is YES, describe or name the waterways to which the waters in 13(a) connect or flow.
N/A (f) If the answer to 13(d) is No, does the water described above in 13(a) periodically connect with or flow into any hydrological or creek system? If YES, describe the flow and connection.
The station's Discharge Canal leads to the Waste Heat Treatment Facility which discharges to Lake Anna.
- 14. Did the discharge violate any applicable water quality standards, (e.g., NPDES)? If YES, describe:
No
- 15. Did the material cause a film, sheen, discoloration or irridescent appearance on the adjoining shorelines of, or surface of, any water described above in 13(a) (e) or (f)? If YES, describe:
Yes. Only in._the Discharce Canal. Less than i pint of oil escaped to the Waste Heat Treatment Facility.
None was discharged to Lake Anna.
- 16. Did the material cause any sludge or emulsion to be deposited <
on the adjoining shorelines of, or beneath the surface-of, the waters described above in 13(a) (e) or (f)? If YES, describe:
No
- 17. Describe any observed damage to animal life or vegetation.
None l __ _ __ __ -
l
. i i
5 i
5- '
18.
Describe in detail what actually caused the disch'arge.
Oily water being pumped to the oil / water separator for treatment had oeen inadvertently pumped to the outlet side of the separator '
rather than the inlet side as intended. Therefore.'the oily water bypassed 004.
at-Outfall the treatment unit and was discharged into the Discharge CanaI 19.
Describe stops taken to contain and clean up the snilled material and mitigate environmental damage. ,
_011 in the Discharge Canal was captured by the permanent oil booms and -
__ removed with cbsorbents.
20.
Describe action taken or proposed to prevent a recurrence of this type of spill.
_A procedure will be developed to orovide instructions for the discharte of oily water to the oil / water separator system. Also, the manholes in the avstem have been clearly labeled to orevent introduction ofagglysater to the wrong part of the system.
21.
List the federal and state agencies, if any, to which the owner or operator reported tne discharge. Show the agency, .ts location, the date and time of notification and the ot .cial contacted.
Nationni Renennne center. 10_ O . 2105 Hourn. Enn. John crnmuell Dept, cf Emergency Services. Richmond, VA. 10-2-92. 2102 Hrs., Michael C,cker Nuclear Recu1ntory cneminnfan. 10-2-92. ?l44 Hnur.t
- 22. List the state spill during or and afterlocal officials clean up. who were on-scene at the None 23.
List the names and addresses of persons believed to have knowledge of the facts surrounding this incident.
C. Ea Kane. North Anna Power Station P. 0,_ Box 402.-Mineral. VA 23117
h
- 24. List any other information you wish to bring to the attention o* the federal government.
Containment 6 recovery actions were suc;essful and none of the oil was disc' arged to the waterways. A copy of our follow up letter to the Virginia State Water control Board is attached.
The above information should be mailed to:
U.S. EliVIRoliMENTAL PROTECTION AGENCY REGION III OIL AND TIfLE III SECTION (3HW34) 303 METilODIST BUILDING 11TH & CHAPLINE STREETS WliEELING, WEST VIRGINIA 26003 If you cannot answer this letter by_ November 12, 1992 or if there are any questions on this matter, you may call Paula, Curtin at (304) 234-0256.
Sincerely,
& -[^
L7
-~ ,
David Wright, Chief oil and Title III Section Signature: _ . /+f s /
I hereby certify the above to be true and accurate to the b9st of my knowledge.
This information request is not subject to review by the Director of OMB pursuant to the requirements of the Paperwork Reduction Act, 44 U.S.C. Section 3507.
O ADM.20.31
. PAGE 9 0F 18 06-01 92 6.0
SUMMARY
TABLE OF THE LOCATION OF OILS I OCATION OF OILS '
NORTH ANNA POWER STATION OPERATIONS FUEL O!!. . NO. 2 I k
1 5.000 bbi storage tank (210.000 2 50.000 g allon st orage tank . . . . . . .g 41) . . . . . . . . . . . . . . . . . m. . . .
1.000 gallon day tanks.......................................... below pound 4
....... Diesel Generator Room Maximum Storage Capacit A y eras e Dsily Us age.y. . . . . . . .. .. . .. ...... . . 314.000
... .. .. ..gallons
. .o Average Daily Received . . . . . . . . . . . . . . . . . . ...... . . 6,000
. . . . .gallons
. . . . . . . . . .. .... . 6, 1
1 250 allon fue pump. tank................ Within Service water pump house 270 allon fue pump tank........... Within Ware 1 500 a3on security tank ............................. house No. 5 pump house
....... ..... Below ground LUBRICATING OIL 2 16.000 gallon storage tank.......................... Within Turbine Budding 2 14.000 gallon storage tank .... ..... . ....... ..... ... Whhin Turbine Building 2 2.000 iauon storage tank....................... .... Within Turbine Building 2 200 gat on storage tank..............................
Within Turbine Building -
Maximum Storage Capacity................. ................... 64.000 gallons GASOLINE (Outside securit.v fence-Adjacent to Ad sin Annex) 1 3.000 gallon tank (regular). ........ ..... . ......... ....... ... ... . delow ground 1.000 gallon tank (unteaded).................................... Below ground ,
(Outside Maintenance Garage) 1 10.000 gallon tank (unleaded) ... ............................... Palew ground DIESEL (Outside Maintenance Garage) 1 10.000 g allo n t ank ............................................... Below ground WASTE OIL 1 S 800 gallon tank (oil separator)................................ Below ground 1
1.500 gallon tank (oilsto:3ge building) .... .... ..,... . ........ Above ground ,
1 550 gallon tank (Maintenance Garage)....................... . Below ground TRANSFORMERS 4
18 MVA Station transformers.................Ccoling weaerintake structure 8
6 330 MVA Mam Stadon transformers .......Nonh side of Turbine Building .
i 15 MVA Station service transformers ...... North side of Turbine Building -
i ADM.20.31 i PAGE 10 0F 18 0641 92 CONTAMINATED OIL 55 gallon dnims .............. Stored above ground in the Clarifter Buddica LOCATION OF OILS NORTH ANNA MAIN DAM l'UEL OIL - DIESEL 2
750 g allon tank . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Abo ve w
i i iii ..
'm ud
s (g LM. * % gjy, North Anna ENV 43/0i1 Spill Apts.
October 8,1992 Mr. W;lliam L Kregloe Virginia Water Oontrol Board Valley Regional Office 116 North Main Street P. O. Box 268 Bridgewater, VA 22812 RE: NORTH ANNA POWER STATION Olt RELEASE 10/2/92
Dear Mr. Kreglos:
An oil release to the discharge canal occurred at North Anna Power Station on October 2,1992. This letter confirms our report of the incident to the Department of Emergency Sendees at 2102 hours0.0243 days <br />0.584 hours <br />0.00348 weeks <br />7.99811e-4 months <br />, and to the National Response Center at 2105 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.009525e-4 months <br />, on that date.
Notification was also made to the Nuclear Regulatory Commission at 2144 hours0.0248 days <br />0.596 hours <br />0.00354 weeks <br />8.15792e-4 months <br />.
At approximately 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> on 0;:tober 2, station personnel discovered an oil sheen on the discharge canal. Upon investigation it was determitted that oily water being pumped to the oil / water separato for treatment hcd been !nadvertently puniped to the outlet sids of the separator rather than the inlet side as intended. Therefore, the oily water bypassed the treatment unit and was discharged into the canal at Outfall 004.
It has been determined that a total quantity of less than 5 gallons of oil was involved in this event, most of which was captured by absorbents at the 004 out'all structure and at the permanent oil booms in the discharge canal. A small amount, estimated at less than one pint, escaped the oil booms into the Waste Heat Treatment Facility (WHTF). Most of this oil was contained by a temporary boom and captured by absorbents. No oil from this release wedd be expected to reach the discharge to state waters from the WHTF to Lake Anna (Outfall 010). No evidence of environmental damage was found, in order to preclude future recurrence of this incident, a procedure will be developed to provide instructions for the discharge of oily water ta the oil / water separator system.
Also, the manholes in the system have been clearly labeled to prevent introduction of.
wastewater to the wrong part of the system.
T 4
0
Mr. William L Kregloe October 8,1992 Page 2 i
Should you desire additionalinformation or have any questions abotti this matter, please l contact Daniel James at (904) 273 2996.
Sincerely, N
B. M. Marshall, P.E.
Manager Water Quality cc: U.S. Nuclear Regulatory Commission Region ll 101 Marietta St., NW Suite 2900 Atlanta, GA 30323 Re: North Anna Units 1 & 2 Docket Nos. 50 338/50 339 Ucense Nos. NPF-4/NPF 7 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Re: North Anna Units 1 & 2 Docket Nos. 50-338/50-339 Ucense Nos. NPF-4/NPF 7 Mr. M. S. Lesser NRC SerT Resident inspector North Anns Power Station
.