Submits Proposal to Pressure Test Piping within 10 Days Prior to Normal Fuel Oil Unloading Into Ast,Beginning No Later than 980101
ML20210G972
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 07/22/1997
From: Sprouse W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Flory G
VIRGINIA, COMMONWEALTH OF
References
NUDOCS 9707290070
Download: ML20210G972 (2)


Text

_ __ __ _ .

Innsbnusk Mbnical Center h sixa)ik>nunion Bouletard Glen Allen. Verginia 2,f tmo July 22,1997 Mr. Gary A. Flory AST Program Supervisor vmomu rowen Departmentof EnvironmentalOuality Valley RegionalWater Office P. O. Box 1129 Harrisonburg, Virginia 22801- 1129 Re: ODCP FACILITYINSPECTION NORTH ANNA POWER STATION (FC 06 7030)

RESPONSE- MODIFIED LEAK DETECTION PROPOSAL

Dear Mr. Flory:

l Pursuant to our phone conversation regarding leak detection at North Anna Power l Gtation, we have modified the leak detection proposal for the underground line that runs l from the unloading area to the 5,000-barrel aboveground storage tank (AST). We are now proposing to pressure test the piping within ten days prior to normal fuel oil unloading into the AST, beginning no later than January 1,1998. Testing prior to each

' unloading event, as opposed to the previous proposal of annual testing, will provide for leak detection in case we have more than one unloading event in a year.

The only exception to the pressure testing prior to the unloading event would be an emergency situation at the station. The AST supplies oil for the emergency diesel generators; therefore, in the unlikely event of an emergency it may become imperative to add fuel to the AST. During an emergency we may not be able to perform the pressure test prior to a fuel unloading event.

Virginia Power appreciates your cooperation in this matter and hopes that the DEQ understands the importance of providing fuel for the diesel generators during an emergency. Upon your concurrence with this proposal, we will make the appropriate changes to the Oil Disch arge Contingency Plan and submit the revised sections for your approval.

Sincerely, WA , .

C OD i ' o W. A. Sprouse, Jr., P.E.

Senior Engineer Environmental Policy & Compliance 97j72 g goga g k0$,5kNf0k!!!

P PDR

{

Mr. Gary Flory July 22,1997 l- Page 2 I

cc: U. S. Nuclear Regulatory Commission Region ll Atlanta Federal Center 81 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 RE: North Anna Units 1 and 2 Docket Nos. 50-338/50 339 License Nos. NPF-4/NPF-7

- U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RE: North Anna Units 1 and 2 Docket Nos. 50-338/50-339 License Nos. NPF-4/NPF-7 Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station